|
| 1 | Remuneration for Local Staff (inclusive of per diem allowance) |
| 2 | Team leader cum Senior Highway Engineer |
| 3 | Senior Bridge Engineer |
| 4 | Highway cum pavement Engineer |
| 5 | Material-cum-Geotechnical Engineer-Geologist |
| 6 | Senior Survey Engineer |
| 7 | Traffic and safety Expert |
| 8 | Environmental Specialist |
| 9 | Quantity Surveyor/Documentation Expert |
| 10 | Sub Professional Staff (To be Assessed by consultant as per requirement of assignment) |
| 11 | Assistant Highway Engineer |
| 12 | Assistant Bridge Engineer |
| 13 | Assistant Survey Engineer |
| 14 | Assistant Material Engineer |
| 15 | Assistant Environmental Engineer |
| 16 | CAD/MX Expert |
| 17 | Technical Assistants |
| 18 | Support Staff (To be assessed by consultants as per requirement of assignment) |
| 19 | Office Manager |
| 20 | Typist |
| 21 | Office Boy |
| 22 | Night Watchman |
| 23 | Transpotation (Fixed Costs) |
| 24 | The vehicles provided by the consultant shall include the cost for rental, drivers, operation, maintenance, repairs, insurance etcA. For use of consultant |
| 25 | Duty Travel to site (Fixed Costs) |
| 26 | Office Rent (Fixed Costs) |
| 27 | The rent Cost includes operation & maintenance cleaning, repair etc for the entire duration of service |
| 28 | Office Supplies Utilities and communication (Fixed Costs) |
| 29 | Office supplies Drafting |
| 30 | Supplies Computer |
| 31 | Running Costs |
| 32 | Domestic and international Communications |
| 33 | Office Furniture and Equipement (Rental) |
| 34 | Office Furniture and Equipement (Fixed Costs) |
| 35 | Report and Document Printing |
| 36 | Monthly Reports (03 Copies per Month) |
| 37 | Inception Report & QAP |
| 38 | Environmental & Social Impact Screening Report |
| 39 | Draft Feasilbilty Report |
| 40 | Final Feasilbilty Report |
| 41 | Strip Plan with LA Report |
| 42 | Draft LA Clearance Report |
| 43 | Final LA Clearance Report |
| 44 | Draft Environment Assessment report & RAP |
| 45 | Final Environment Assessment report & RAP |
| 46 | Draft Detailed Design Report & Drawing etc |
| 47 | Draft EMP |
| 48 | Draft Bidding Document |
| 49 | Final Detailed Project Report with Bill of Quantities cost estimates, updated Drawing etc. |
| 50 | Final EMP |
| 51 | Final Bidding Document |
| 52 | Draft 3(a), 3(A) and 3(D) notification/ or equivalent publication as per NH Act/ or State Act/ or prevalling LA Act of area under consideration (03 copies each) |
| 53 | LA & Clearance II report |
| 54 | Survey and Investigation |
| 55 | A. Topographical Survey |
| 56 | Topographical Survey including hire charges for equipement and supply for survey team comprising of project survey field staff etc. Inclusive of cost of material, labourer |
| 57 | Detailed topographic surveys using mobile/aerial LiDAR or Equivalent technology |
| 58 | B. Investigation (Fixed Cost) |
| 59 | Road and Bridge Inventory |
| 60 | BBD Test and Pavement Evaluation |
| 61 | Roughness Survey |
| 62 | xle Load Survey |
| 63 | Material Survey and Investigation |
| 64 | Sub-Grade Investigation |
| 65 | Traffic Survey |
| 66 | Socio-economics & Census Survey/Studies |
| 67 | Land Acquisition Studies |
| 68 | Any Other Investigation / Survey |
| 69 | C. Sub Soil Investigation |
| 70 | Boring in All Type of Soils (other than Rock) |
| 71 | Boring in Hard Rock |
| 72 | Estimate of cost for Expateriate Consultants (Name and Position to be filled in Below columns by the Bidder)Renumeratrion of Expatriates Staff including per diem allowance |
| 73 | Position |
| 74 | Position |
| 75 | Position |
| 76 | Position |
| 77 | Position |
| 78 | Position |
| 79 | Mobilization and Demobilization-international Airfares (Fixed cost) (To be filled by the Bidder in below columns) |
| 80 | Position |
| 81 | Position |
| 82 | Position |
| 83 | Position |
| 84 | Position |
| 85 | Position |
| 86 | Mobilization and Demobilization-Inland Travel in Home Country (Fixed Costs) |
| 87 | Other Miscellaneous expenses (Like DA, Internal travel expenses other incidents) (Fixed Cost) |