Tender for repairing and restoration of 7 no dumper placer of dist-2 under garage swm-2 - DISMANTLING OF DAMAGED PORTION OF THE CABIN & CONTAINER PLATFORM BY GAS CUTTING. GAS CUTTING AREA :210 X 0.16 X6 + 172 X 0.16 X 4 + 240 X 0.16 X 5+ 40 X 0.16 X4+ 270 X 0,3 X 2 +190 X 0,3 X 3+243 X 0,3 X4 + 205X 0,3 X 4 = 1399,88 CM2 MATERIAL REQUIRED & CORRESPONDING COST FOR CABIN REPAIRING 1.6MM MS SHEET = 2.9 X 0.56 X 0.0016 X 4 X 7850 = 81,59 KG X7 571,13 KG MATERIAL REQUIRED & CORRESPONDING COST FOR CABIN REPAIRING: 3MM MS SHEET = 2.7 X 0,56 X 0.003 X 2 X 7850= 71,22 KG X7 = 498,5 KG MATERIAL REQUIRED & CORRESPONDING COST FOR CABIN REPAIRING: MS ANGLE (40X40X5): (1,7 X 4+ 2,87 X 5+2 X 4) X 3.768 107 21 KG(WT. 3.768KG./M) X 7 = 750.5 LABOUR CHARGES FOR HOISTING & PLACING THE TOTAL MATERIAL: 81.59+71.22+107.21 260.02 KG = 2.6 QUNTL. X 7 = 18,2 QNTL, LABOUR CHARGES FOR LOWERING & STACKING THE TOTAL MATERIAL = 2.6 QNTL. X 7 = 18,2 QNTL. NO. OF TACK WELDING FOR CABIN REPAIRING: 20 X 3 + 20 X 6 + 15 X 4 + 22X 5+ 9X4+3 X 3395 X 7=2765 LENGTH OF CONTINUOUS WELDING FOR CABIN REPAIRING: 265X 420 X 4-1140 CM X 77980 CM MATERIAL REQUIRED FOR REPAIRING LOAD BODY/ CONTAINER PLATFORM:1.6 MM MS SHEET:2.8 X 1.5 X 0,003 X 7850 98.91 KG X 7=692.37 KG MATERIAL REQUIRED FOR REPAIRING LOAD BODY/ CONTAINER PLATFORM 6 MM MS PLATE: 2.4 X 1,2 X 0,006 X 7850 135,65 KG X7-949,54 KG MATERIAL REQUIRED FOR REPAIRING LOAD BODY/ CONTAINER PLATFORM MS ANGLE (40 X 40 X 5): 2.95 X 3X 3.76833.35 KG (WT.-3.768KG./M) X 7 233,43 KG MATERIAL REQUIRED FOR REPAIRING LOAD BODY/ CONTAINER PLATFORM MS CHANNEL (75X40X6): 2.95X2+2.1X2)X 9,734 98,31 KG (WT.9.734KG,/M) X7-668,19 KG LABOUR CHARGES FOR HOISTING & PLACING THE TOTAL MATERIAL -98.91+135.65+33.35-98.31 -366.22 KG = 3.66 QNTL. X7=25.64 LABOUR CHARGES FOR LOWERING & STACKING THE TOTAL MATERIAL -3,66 QNTL, X 7=25.64 QNTL. NO, OF TACK WELDING REQUIRED FOR REPAIRING CONTAINER PLATFORM 25 X 2+24 X4+21 X 4230 X 7 = 1610 LENGTH OF CONTINUOUS WELDING REQUIRED FOR REPAIRING CONTAINER PLATFORM 75 X4+ 37X3+39X3= 528 CM X 7 3696 CM COST OF SURFACE CLEANING, PRIMING, & PAINTING CABIN & LOAD BODY/CONTAINER PLATFORM: AREA TO BE OF CLEANED : 2,06 X 2,43 X 4 2,1 X 1,7 X4 +0,55 X 0,56 X 4 + 2,53 X 2,02 X 4+ 0,7 X 0,7 X 457,96 M2 X 7 405,72 M2 COST OF SURFACE CLEANING, PRIMING, & PAINTING OF CABIN & LOAD BODY/CONTAINER PLATFORM: COST OF PRIMER ON 405,72 M2 M2 AREA OF THE VEHICLE COST OF SURFACE CLEANING, PRIMING, & PAINTING OF CABIN & LOAD BODY CONTAINER PLATFORM: COST OF SYNTHETIC ENAMEL PAINTING ON 405.72 M2 AREA OF THE VEHICLE SKILLED LABOUR FOR AUTO-ELECTRIC WORK & LIGHT FITTING SEMI-SKILLED LABOUR FOR AUTO-ELECTRIC WORK & LIGHT FITTING SKILLED LABOUR FOR THOROUGH CHECKINGOF HYDRAULIC PORTION INCLUDING FITTING FIXING OF PIPES, FILTER, REMOVING OLD HYRAULIC OIL AND POURING NEW HYDRAULIC OIL ETC. SEMI-SKILLED LABOUR FOR HYDRAULIC WORK SKILLED LABOUR FOR THOROUGH CHECKING OF MECHANICAL PORTION INCLUDING FITTING FIXING OF BOLT NUT, DIESEL AND MOBIL FILTER, CLEANING OF AIR CLEANER DIESEL TANK, REMOVING OLD ENGINE OIL, GEAR OIL AND POURING NEW AND FOUL WHEEL GREASING PROPERLY ETC.