Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
tangi → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Sub Centre At Kakhadi
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation of foundation in hard soil within the initial lead and lift including dressing and levelling the bed and depositing the excavated materials away from the work site etc. all complete as directed by the Engineer-in-charge. |
| 2 | Filling foundation and plinthwith excavated materials moorum including watering and ramming as directed by the Engineer-in- charge. |
| 3 | Filling foundation and plinthwith sand well watered and rammed including all cost, carriage, royality, taxes and all labour, T & P etc. all complete as per the direction of Engineer-in- charge. |
| 4 | Cement concrete (1:3:6)using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. |
| 5 | Fly Ash Brick masonry in cement (1:6) in foundation & plinth etc. |
| 6 | Fly Ash Brick masonry in cement (1:6) in superstructure etc. |
| 7 | Ground Floor |
| 8 | First Floor |
| 9 | 2ND Floor |
| 10 | RCC M20 using 12mm size HG chips including cost, carriage and taxes etc complete. |
| 11 | Ground Floor |
| 12 | a) Column base |
| 13 | b) Column & Roof Beam |
| 14 | c) Plinth Bend |
| 15 | d) Lintel |
| 16 | e) Chajja |
| 17 | f) Roof slab |
| 18 | g)Stairs |
| 19 | First Floor |
| 20 | a) Lintel |
| 21 | b) Column & Roof Beam |
| 22 | c) Roof slab |
| 23 | d) Chajja |
| 24 | e)Stairs |
| 25 | 2ND Floor |
| 26 | a) Column & Roof Beam |
| 27 | b) Roof slab |
| 28 | Straightning, cutting ,bending, binding MS rod and placingin position. Including cost of binding wire 18 to 20 gauge and cost conveyance etc all complete. |
| 29 | Ground Floor |
| 30 | First Floor |
| 31 | 2ND Floor |
| 32 | 20mmthick grading concrete in cm (1:4) including watering for curing etc complete. |
| 33 | First Floor |
| 34 | 12mm thick C.P in cement mortor (1:6) finished to smooth over brick walls after racking out the joints including watering & curing with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete. |
| 35 | Ground Floor |
| 36 | First Floor |
| 37 | 2ND Floor |
| 38 | 16 mm thick cement plaster in cm (1:6) over brick masonary finished smooth after racking out joints to 12 mm deep including watering for curing etc complete. |
| 39 | Ground Floor |
| 40 | First Floor |
| 41 | 2ND Floor |
| 42 | 6 mm thick C.P in cement mortor (1:4) including close deep cheeping to the ceiling of the roof including watering & curing with cost & conveyance of all materials & labour with T & P required for the work with all taxes, royalties etc. complete. |
| 43 | Ground Floor |
| 44 | First Floor |
| 45 | Supply fitting and fixing vitrified floor tiles in floor600mmx600mm printed/coloured series trade on steps and landing on 20mm thick bed of cement motar (1:4) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the Engineer in charge . |
| 46 | Ground Floor |
| 47 | First Floor |
| 48 | Providing and fixing Ceramic tiles in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge. |
| 49 | Ground Floor |
| 50 | First Floor |
| 51 | Providing and fixing Ceramic tiles in dados, skirtings and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles complete including cost of tiles as directed by the Engineer-in-charge. |
| 52 | Ground Floor |
| 53 | First Floor |
| 54 | Supply fitting and fixing Chequred tilesin floors on 12mm thick bed of cement motar (1:3) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and polishing etc as per directin of the Engineer in charge . |
| 55 | Ground Floor |
| 56 | First Floor |
| 57 | Supply fitting and fixing Granite tiles above 0.10 sqm & upto 0.40 sqmin walls, dados & skirting on 12mm thick bed of cement motar (1:3) joint with net cement slury mixed with pigment to watched and shade of the tile including rubbing and policying etc as per directin of the EIC. |
| 58 | Ground Floor |
| 59 | First Floor |
| 60 | Finishing wall with one coat primer water based of approved make and finished smooth and even surfaceto receiving paintingincluding all labour, T & P, cost of paints as per the direction of Engineer-in-charge. |
| 61 | Ground Floor |
| 62 | First Floor In Side |
| 63 | First Floor Out Side |
| 64 | 2ND Floor Out Side |
| 65 | 2ND Floor in Side |
| 66 | Distempering 2coats with distemper of approved shade on new work to give an even shadewith cost of all materials taxs labour t&p etc complete. |
| 67 | Ground Floor |
| 68 | First Floor |
| 69 | 2ND Floor in Side |
| 70 | Finishing wall with water proofing weather coat paint of approved shade two coats to give an even shade including cost of paints. |
| 71 | Ground Floor |
| 72 | First Floor |
| 73 | 2ND Floor |
| 74 | Supplying fitting fixing of stainless steel of304 grade in hand railing using 50mmdia 2mmthick circular pipe with Balustrade of size 32mmx32mmx2mm @0.90mtr c/c & stainless steel square pipe bracing of size 32mmx32mmx2mm in 3 rows in staircase as per approved design & specification,buffing,polishing etc with cost, conveyance,taxes of materials,labour,t&p reqd.etc. complete. |
| 75 | Ground Floor |
| 76 | First Floor |
| 77 | Finishing wall surface with Cement based wall putty(water based)of approved make and finished smooth and even surface to receive paintingincluding cost of scaffolding staging charges with cost of all material, taxes, cess, labour ,T&P etc. complete. |
| 78 | First Floor |
AI Tender Summary
Tender Timeline
Jun 15, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 01, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 03, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender