Power Boards / Undertakings / PSU Closing in 0 days TDR #38172952

Constructing Ht / Lt Line Using Ht Covered Conductor From Adikkadu To Valiyath Crusher And Vilanthara Under Electrical Subdivision Sasthamcotta

Issued by Boards / Undertakings / PSU · sasthamcotta, Kerala
Tender Value
47.67 Lakhs
Estimated cost
Bid Submission
24 Jun 2023
0 days left
EMD
71600
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
sasthamcotta → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Constructing Ht / Lt Line Using Ht Covered Conductor From Adikkadu To Valiyath Crusher And Vilanthara Under Electrical Subdivision Sasthamcotta

BOQ

Name of Work: Constructing HT/LT Line From Adikkadu to Valiyath Crusher and Vilanthara Under ESD SasthamcottaOn Turnkey Basis
Sl. No. Item Description
1MATERIALS
2Covered Conductor HT 70 Sq.mm
3Pin insulator 11KV Composite Polymetric
4Insulater tie for covered conductor
5Disc Insulator 11 Kv Composite polymeric-covered conductor
6Hard ware Fittings-GI-for HT Covered Conductor 120sq.mm
7Midspan joint set for covered conductor HT
8Single core outdoor termination kit for covered conductor
9Insulation piercing connector set for covered conductor HT
10Lightening arrestor 9 kv ,10kA( DistributionClasses)Composite polymer housing
11GI-Wire 4mm 8swg
12Bolt & Nut GI M 16x 40(1.5” x5/8”)
13LABOUR
14Loading HT Atype pole from the stacking place and unloading the same at work site ( Transport by vehicle )
15Transporting Pole by hired vehicle to a distance up to 5 km and carring up to 4 polesExcludingloading and un loading
16Fitting and erecting 1 HT PSC pole in position including fitting cross arm ,Digging and back filling pit,Drawing earth leads
17Fitting and erecting A typepole in position including fitting cross arm ,Digging and back filling pit,Drawing earth leads
18Fitting and erecting HT DP using PSC poles including fitting two channel cross arm ,Digging and back filling pit drawing earth leads
19Fitting and providing 1 HT Stay for PSC Pole including Digging and back filling pit
20Additional rate for excavation of one pit for HT pole/HT Stay in hard laterite
21Additional rate for excavation of one pit forA typepolein hard laterite
22Providing one Earth using earth pipe incl. Digging separate pit at standard distance away from the pole/structure & backfilling.
23Providing one coil Earth using GI Wireincl. Digging separate pit at standard distance away from the pole/structure & backfilling.
24Fitting One Set of AB Switch and giving connections
25Fitting One addition V-Cross arm in existing single poles including conveyance of materials
26Fitting One One addition75x40 mm ,1.8 channel cross armin existing single poles including conveyance of materials
27Fitting One One addition 100x50x60 mm ,2.4 channel cross armin existing 11 KV DPincluding conveyance of materials
28Dismantling without damage one HT PSC/RCC Poles after disconnecting stays, struts and stacking the same
29Transferring LT Single phase 2/3 wire OH Line to newely erected HT/LT Poles and refitting all items to the new poles
30Transferring LT Three phase 4/5 wire OH Line to newely erected HT/LT Poles and refitting all items to the new poles
31Dismantling and reconnecting Single phase servise connections from OH Line including lowering down the WP Portion
32Dismantling and reconnecting Three phase servise connections from OH Line including lowering down the WP Portion
33Dismantling one ordinary street light /CFL/LED Fitting from [pole repairing and refitting in the same in position and giving connections
34Cutting tree beyond 30 cm but up to including 60cm girth,cutting of trunks and branches , removing the root completely and stacking
35Cutting tree beyond 60 cm but up to including 120 cm girth,cutting of trunks and branches , removing the root completely and stacking
36Loading HT PSC pole from the stacking place and unloading the same at work site ( Transport by vehicle )
37Fitting and providing HT Fly stay for 11 kv pole using HT PSC Pole including digging and back filling pit
38Fitting and providing HT Strut using HT PSC pole incuding digging and back filling pit
39Stringing1 KM Three phase 11 kv Line with XLPE Insulated ACSR Raccoon
40Additional rae for providing one Disc set on any type of HT Pole for making cut point
41Fitting one set ( 3 nos) of 11KV LA and giving connections excluding earthing
42Installation of Insulation piercing connector for main to service line main :16-95sqmm, Tap : 16-95 sqmm
43Doing straight joint on cables of sizes up to and including 3x 185 sq.mm using the cable joining kit supplied departmently as per specification
44Doing one cable end termination on cable of sizes up to and including 3x185 sq.mm using the cable joining kit supplied departmently
45Dismantling without damage One KM 11 KV Line ( 3 conductors) ,cross arms,insulators disc rolling the conductors and stacking
46Installation of Insulation piercing connector for main to service line main :25-95 sqmm, Tap 25-95 sqmm

AI Tender Summary

OUR REF NO 38172952
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 47.67 Lakhs
LAST DATE 24-06-2023
Authority
Authority Name Kerala State Electricity Board
Work Description Constructing Ht / Lt Line Using Ht Covered Conductor From Adikkadu To Valiyath Crusher And Vilanthara Under Electrical Subdivision Sasthamcotta
Basic Detail
Tender No eT03/ESD/SKTA/23-24/14.06.2023
Bidding Type Tender
Location
City sasthamcotta
State Kerala
Key Dates
Publish Date 14 Jun 2023
Submission Date 24 Jun 2023
Open Date 27 Jun 2023
Finance
Tender Value 47.67 Lakhs
Tender Fee 5900
EMD 71600
Exemption Not Available
Document List
boundenagreement.pdf
Tenderconditionscoveredsk.pdf
Tendernotice_1.pdf
a6f456fa-5fe5-4ad8-9d78-75d0f9ec180e.html
BOQ_859170.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 14, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 24, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 27, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

boundenagreement.pdf

pdf

Tenderconditionscoveredsk.pdf

pdf

Tendernotice_1.pdf

html

a6f456fa-5fe5-4ad8-9d78-75d0f9ec180e.html

xls

BOQ_859170.xls