Tender For Tiruvarur District - Mgsmt 2022-23 Road Works - Kodavasal Block - Package - 3R
Tender Overview
Project Description
Tiruvarur District - Mgsmt 2022-23 Road Works - Kodavasal Block - Package - 3R 1)Strengthening Of 18 Pudhukkudi Village Road Km 0/0-1/0,2)Strengthening Of Koonthalur Cettiyer Salai Km 0/0 -0/650 And 3)Strengthening Of Kangeyanagaram School Road Km 0/0 -0/440
BOQ
| Sl. No. | Item Description |
| 1 | 1)Strengthening of18 Pudhukkudi village Road km -0/0-1/0(Road code - R-649) |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road landincluding uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. |
| 3 | Km. 0/0 - 1/0 |
| 4 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m |
| 5 | Km. 0/0 - 1/0 |
| 6 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out |
| 7 | Km. 0/0 - 1/0 |
| 8 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content |
| 9 | Km. 0/0 - 1/0 |
| 10 | Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre ofgravelof blindage per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.R.T.specification. |
| 11 | Km. 0/0 - 1/0 |
| 12 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 13 | Km. 0/0 - 1/0 |
| 14 | Applying tack coat over WBM surface (not treated with primer) using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe |
| 15 | Km. 0/0 - 1/0 |
| 16 | BC 25mm Thick (Grade-II) Using VG30 Bitumen and Polymer Modified Bitumen (PMB)ProvidingandlayingBituminousConcreteto30/40mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumenand3.02KgsofPMB Cubesforpremixingper10sqmincludingcostand conveyanceofallmaterialstoCMPsite,heatingthebitumenandaggregatetorequired temperatureandmixingtheminrequiredtemperatureincentralhotmixplant20-30ton capacity,conveyingthemixbytippertruckstopaversite,spreadingthemixtouniform thicknessof40mmwithmechanicalpavertothespecifiedgradesandcrosssectionsand consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending topavertositeetc.,including hirechargesandfuelchargesfor 20-30tCMPwithbitumen boiler,tippertrucks,PaverFinisher,Vibratoryrollerandallothertoolsandplantrequired, including fuel and all other incidental charges etc., complete as per specification using CMP as |
| 17 | Km. 0/0 - 1/0 |
| 18 | Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint.Rumble Strips = 3 X 3.75 X 0.25 = 2.81 |
| 19 | Km. 0/0 - 1/0 |
| 20 | Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803 |
| 21 | Km. 0/0 - 1/0 |
| 22 | Proviosion for KM stone |
| 23 | Provision for HM stone |
| 24 | Provision for Name board & Citizen information Board |
| 25 | Provision for sign Boards |
| 26 | Provision for Octogon Curves |
| 27 | 2)Strengthening ofKoonthalur Cheetiyer Salaikm -0/0-0/650(Road code - R-738) |
| 28 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m |
| 29 | Km. 0/0 - 0/650 |
| 30 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out |
| 31 | Km. 0/0 - 0/650 |
| 32 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content |
| 33 | Km. 0/0 - 0/650 |
| 34 | Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre ofgravelof blindage per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.R.T.specification. |
| 35 | Km. 0/0 - 0/650 |
| 36 | Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe |
| 37 | Km. 0/0 - 0/650 |
| 38 | Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and.09cum of 6.70mm with 24.40 Kgs ofVG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, |
| 39 | Km. 0/0 - 0/650 |
| 40 | Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while str |
| 41 | Km. 0/0 - 0/650 |
| 42 | Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of |
| 43 | Km. 0/0 - 0/650 |
| 44 | Provision for HM stone |
| 45 | Provision for Name board & Citizen information Board |
| 46 | Provision for sign Boards |
| 47 | Provision for Octogon Curves |
| 48 | 3)Strengthening ofKangeyanagaram School RoadKm 0/0-0/440 (Road code R- 133) |
| 49 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m |
| 50 | Km. 0/0 - 0/440 |
| 51 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content |
| 52 | Km. 0/0 - 0/440 |
| 53 | Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre ofgravelof blindage per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.R.T.specification. |
| 54 | Km. 0/0 - 0/440 |
| 55 | Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe |
| 56 | Km. 0/0 - 0/440 |
| 57 | Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and.09cum of 6.70mm with 24.40 Kgs ofVG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, |
| 58 | Km. 0/0 - 0/440 |
| 59 | Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while str |
| 60 | Km. 0/0 - 0/440 |
| 61 | Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of |
| 62 | Km. 0/0 - 0/440 |
| 63 | Provision for HM stone |
| 64 | Provision for Name board & Citizen information Board |
| 65 | Provision for sign Boards |
| 66 | Provision for Octogon Curves |
| 67 | Towards the charges for routline maintenance of the road work executed under MGSMT Scheme including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost |
| 68 | 1)Strengthening of18 Pudhukkudi village Road km -0/0-1/0(Road code - R-649) Mintenance Estimate |
| 69 | 1 styear Maintenance |
| 70 | II nd year Manitenence |
| 71 | III rd Year Maintenance |
| 72 | IV th Year Maintenance |
| 73 | Vth year Maintenance |
| 74 | 2)Strengthening ofKoonthalur Cheetiyer Salaikm -0/0-0/650(Road code - R-738) Maintenance estimate |
| 75 | 1 styear Maintenance |
| 76 | II nd year Manitenence |
| 77 | III rd Year Maintenance |
| 78 | IV th Year Maintenance |
| 79 | Vth year Maintenance |
| 80 | 3)Strengthening ofKangeyanagaram School RoadKm 0/0-0/440 (Road code R- 133) |
| 81 | 1 styear Maintenance |
| 82 | II nd year Manitenence |
| 83 | III rd Year Maintenance |
| 84 | IV th Year Maintenance |
| 85 | Vth year Maintenance |
| 86 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender