Tender For Tiruvarur District - Mgsmt 2022-23 Road Works - Valangaiman Block - Package -3A
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Jun 2023
0 days left
EMD
60500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
valangaiman → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tiruvarur District - Mgsmt 2022-23 Road Works - Valangaiman Block - Package -3A Strengthening Of Madagaram - Therkkunayakanpettai Adc Road Km 0/0 -1/405
BOQ
| Sl. No. | Item Description |
| 1 | 1.Strengthening of Madagaram - Therkkunayakanpettai ADC Roadkm -0/0-1/405(Road code - R- 213) |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. |
| 3 | Km. 0/0-1/405 |
| 4 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. |
| 5 | Km. 0/0-1/405 |
| 6 | Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 7 | Km. 0/0-1/405 |
| 8 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. |
| 9 | Km. 0/0-1/0 |
| 10 | Km. 1/0-1/405 |
| 11 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal@20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) |
| 12 | Km. 1/350-1/405 |
| 13 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER |
| 14 | Km. 0/0-1/0 |
| 15 | Km. 1/0-1/405 |
| 16 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER |
| 17 | Km. 0/0-1/0 |
| 18 | Km. 1/0-1/405 |
| 19 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM surface preparatory to another bituminous construction over it. |
| 20 | Km. 0/0-1/405 |
| 21 | Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. |
| 22 | Km. 0/0-1/405 |
| 23 | BITUMINOUS CONCRETE 25 MMTHICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 24 | Km. 0/0-1/0 |
| 25 | Km. 1/0-1/405 |
| 26 | Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803 |
| 27 | Km. 0/0-1/0 |
| 28 | Km. 1/0-1/405 |
| 29 | Construction of Pipe culvert@ Ch.0/800 |
| 30 | Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting suchas soft clay mixed sand as per SS 20B |
| 31 | Ch. 0/600 |
| 32 | Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for fillingas per standard speecifications |
| 33 | Ch. 0/600 |
| 34 | Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges |
| 35 | Ch. 0/600 |
| 36 | C.C. 1:3:6 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete |
| 37 | Ch. 0/600 |
| 38 | Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete |
| 39 | Ch. 0/600 |
| 40 | Provision for 0.900M pipe NP3 |
| 41 | Ch. 0/600 |
| 42 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
| 43 | Ch. 0/600 |
| 44 | Provision for Name board & Citizen information Board |
| 45 | Provision for sign board 60 cm |
| 46 | Provision for Octagonal board |
| 47 | Provision for kilometre stones |
| 48 | Provision for Hectametre stones |
| 49 | Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost |
| 50 | 1.Strengthening of Madagaram - Therkkunayakanpettai ADC Roadkm -0/0-1/405(Road code - R- 213), |
| 51 | For the First Year from the date of completion of work |
| 52 | For the Second Year from the date of cpmpletion of work |
| 53 | For the Third Year from the date of completion of work |
| 54 | For the Fourth Year from the date of completion of work |
| 55 | For the Fifth Year from the date of completion of work |
| 56 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Jun 13, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJun 19, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 19, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender