| 1 | Earthwork excavation and depositing on bank with initial lead and liftIn hard stiff clay,black cotton soil,hard red earth,shales, muram,gravel,stoney earth and earth mixed with 50% fair size boulders. |
| 2 | In S.D.R. |
| 3 | Sand filling for foundation including the cost of sand,ramming and consolidation etc complete |
| 4 | P.C.C. 1:4:8 using 40mm HBG stone for levelling course |
| 5 | RCC 1:1.5:3using 20mm HBG stone excluding the cost of reinforcement,centering, shuttering but including the cost of curing, finishing etc. Column upto G.L. |
| 6 | Column upto 4.50m from G.L. |
| 7 | Column upto 4.50m - 7.32 m from G.L. |
| 8 | Column upto 7.32m - 10.98m from G.L. |
| 9 | Column upto 10.98m-14.64mfrom G.L. |
| 10 | Column upto 14.64m-18.30mfrom G.L. |
| 11 | Column up to 18.30 to 19.50 from GL |
| 12 | Centering for soffits of RCC works including strutting,shuttering,cost of materials etc. complete Rectangular portion below G.L. |
| 13 | Column upto G.L. |
| 14 | Landing slab @19.50m |
| 15 | R.C.C.1:1.5:3 using 20mm HBG stone for steps work Above G.L. |
| 16 | R.C.C.1:1.5:3 using 20mm HBG stone for jolly work |
| 17 | Supplying,fabricating and placing of RTS/MS rods for reinforcement including the cost of binding wire etc. |
| 18 | Labor Charges for Casting Steps and Jolly Works Charges for mould for casting steps |
| 19 | Charges for mould for casting handrails posts |
| 20 | Charges for mould for casting jollyworks |
| 21 | Refilling the foundation with excavated earth |
| 22 | Providing scafolding for a length of 4m wide |
| 23 | Lifting the steps and jolly works by means of pulley block and strutting in position including hire charges for pulley block |
| 24 | Provision for fixing the staircase with columns at brace level with MS clamps (or) with RCC beams |
| 25 | Providing M.S.Grill gate at roof level with lock |
| 26 | Provision for finishing works |
| 27 | Supplying and fixing in position of RCC (1:1.5:3) in side access ladder Reinforced Cement Concrete 1:1½:3using 20 mm Machine crushed HBGstone excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges |
| 28 | Centering for soffits of reinforced cement concrete slabs or plain surface |
| 29 | Supplying, fabricating and placing in position of RTS grills for reinforcementUp to 16 mm rods |
| 30 | RCC 1:11/2:3 using 20mm HBG stone for Ventilator excluding tha cost of reinforcetnent, centering, shuttering but including the cost of curing,finishing etc. |
| 31 | Centering for soffits of RCC works including strutting,shuttering,cost of materials etc. complete |
| 32 | Supplying,fabricating and placing ofRTS rodsfor reinforcetnentincludingthe Cost ofbinding wire etc. |
| 33 | Painting two coats for Interior surface with approved Interior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. |
| 34 | Providing Cut stone set in CM 1:3 (one cement and three sand) using well dressed cut stone supporting inlet pipe of size 0.30 x 0.30 x 0.15m for service reservoir etc., complete as per standard specifications and as directed byDepartment Officers |
| 35 | Supplying and fixing in position of 0.60 x 0.60m water tight CI manhole frame and cover of approved pattern at the roof slab and as directed.The manhole frame and cover should be of light duty and confirming to IS: 1726-1974 |
| 36 | Supply and fixing in position of enamel water level indicator with all accessories of approved pattern and design etc., complete as per standard specifications and as directed by Department Officers |
| 37 | Supplying and fixing of RCC 1:1.5:3 (1 Cement : 1.5 Sand : 3 Coarse Aggregate) using 20 mm HBGS for RCC Handrails of 0.91 m height over the top of roof slab of approved pattern and design including the cost of reinforcement, centering, recasting, finishing etc,.complete. For jolly all around |
| 38 | For support pillars |
| 39 | Refilling the foundation with excavated earth |