}

Tender For Periodical Maintanance And Servicing 03 Phase Online Ups Of 120 Kva- 05 Nos, Isolation Transformer-03Nos And 3 Phase Online Pdu- 02 Nos With Connected Acessories Along With Distribution Panels Of Of Dipac Under Age(U) Electric Supply No-, New Delhi-Delhi

Military Engineer Services-MES has published Tender For Periodical Maintanance And Servicing 03 Phase Online Ups Of 120 Kva- 05 Nos, Isolation Transformer-03Nos And 3 Phase Online Pdu- 02 Nos With Connected Acessories Along With Distribution Panels Of Of Dipac Under Age(U) Electric Supply No-. Submission Date for this Tender is 24-06-2023. UPS Tenders in New Delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

38136592
Corrigendum : Tender For Periodical Maintanance And Servicing 03 Phase Online Ups Of 120 Kva- 05 Nos, Isolation Transformer-03Nos And 3 Phase Online Pdu- 02 Nos With Connected Acessories Along With Distribution Panels Of Of Dipac Under Age(U) Electric Supply No-
Open Tender
Indian
Delhi
New Delhi
24-06-2023

Tender Details

Periodical Maintanance And Servicing 03 Phase Online Ups Of 120 Kva- 05 Nos, Isolation Transformer-03Nos And 3 Phase Online Pdu- 02 Nos With Connected Acessories Along With Distribution Panels Of Of Dipac Under Age(U) Electric Supply No-I Of Ge (U)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 20-Jun-2023 REVISED TENDER PAGES Other 24-06-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 63500.0 /-
Tender Value
INR 31.71 Lakhs /-

BOQ Items

Name of Work : PERIODICAL MAINTANANCE AND SERVICING 03 PHASE ONLINE UPS OF 120 KVA- 05 NOS, ISOLATION TRANSFORMER-03NOS AND3 PHASE ONLINE PDU- 02 NOS WITH CONNECTED ACESSORIESALONG WITH DISTRIBUTION PANELS OF OF DIPAC UNDER AGE(U) ELECTRIC SUPPLY NO-I OF GE (U) ELECTRIC SUPPLY DELHI CANTT-10
Sl. No. Item Description
1Preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 3 Nos of Make: vertiv / emerson Model liebertAPMcomprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS Systemalong with Isolation transformers of 150 KVA and Disrtubution LT Panell / Parallel operation of the UPS along with 12V ,40Nos 150 AH Battery Bank , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities for keeps the UPS in good working orderto prevent failures andall as directed by Engr-in-charge..
2(a) Perform visual checks and operationaltests of all UPS equipment and associated switchgear. (b) Review maintenance logs and log all alarm operations and output (c) Complete a functional checkout and test( ideal, load, by pass ) of the UPS diagnostic systems. (d) Check environment, temperature, dust, moisture, room vents, etc. (e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmisionchecking of allcomponentsand Acessories of complete UPSsysyetm for signs of overheating, swelling, leaking, etc..along withVisually check printed circuit board alignments. (f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded. (g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc. (h) Perform system and component functional tests on UPS equipment to insure proper functioning within specified parameters. (l) Run all UPS system diagnostics, and correct all diagnosed problems. (m) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (n) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (o) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the UPS subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition.
3(p) Off-line load test the UPS system to ensure that the system is completely functional. (q) Restoring of the UPS to service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractorshall ensure that no damage to the UPS equipment or shutdown will occur because of inrush currents. (r). Contractor Shall be reponsible for 100% working of the UPS and its associated acessories for period of 40 Days after carring out the scheduled maintance. If Any Break down Malfunction of the UPS occurs it will be rectified by the Contractorfree of cost through the authorised OEM in a sipulated period of 12 hrs, failing so to restore the UPS shall recover an amount of 25000/- per every 12 Hrs. NOTES:- (i) The contractor shall maintain the UPS as per Shedule includingsunday & all national /local holidays failing so to carry out preventive maintance inthe stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost oflabour , installation and testing of all 100% parts of the UPS and spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares ofIOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period.
4(iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER nad Eng-in Charge for each UPS separately before submitting the RAR (vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vii) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online UPS (viii). The spares provided shall be ofIEC standard. (ix)Due to continuous workingof the Administrative building and continious running plant, servicing and testing of UPS can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work
5All as peritem No-1 here in before but preventive maintenance of microprocessor based online UPS of capacity 120 KVA of 2 Nos of Make: vertiv / emerson Model liebertSX 120comprising of suitable Nos of power moduls with IGBT based rectifier to achive input THDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) UPS using PWM IGBT technology 3 phase input and 3 phase 400 v output UPS Systemalong with Isolation transformers and Disrtubution LT Panell / Parallel operation o the UPS along with9 AH, 12 Volt 600 No"s Battery Bank/ UPS , IOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working orderto prevent failuresandall as directed by engg-in-charge.
6Preventive maintenance of microprocessor based online PDU of 2 Nos of Make: vertiv / emersonTHDI<6% and input power factor of greater than 0.98 at 100% loading. True online double conversion(VF) as per (IEC 62040-3) PDUusing PWM IGBT technology 3 phase input and 3 phase 400 v outputIOT Based Monitoring Unit and Preventive maintenance consisting of the following scheduled list of activities. for keeps the UPS in good working orderto prevent failures:- (a) Perform visual checks and operationaltests of all UPS equipment and associated switchgear. (b) Review maintenance logs and log all alarm operations and output. (c) Complete a functional checkout and test( ideal, load, by pass ) of the UPS diagnostic systems. (d) Check environment, temperature, dust, moisture, room vents, etc. (e) Clean and tighten all power connections at the input and output terminals, at all circuit breakers, and at the terminal posts and fuses on the rectifier and inverter legs. During the inspection, check all power cabling for abrasions and burn spots. Thermal Scanner / heat emmisionchecking of allcomponentsand Acessories of complete PDUsysyetm for signs of overheating, swelling, leaking, etc..along withVisually check printed circuit board alignments. (f) Replace air filters at regular intervals. Site conditions will determine how often the filters should be replaced, but generally, they will need to be replaced at least every 6 months in clean environments. If more frequent replacement is required, the cleanliness of the environment should be upgraded . (g) Check and calibrate each system, switchgear and circuit breakers, meters, and alarm levels for frequency, voltage, current, transfer, trip, alarm, etc.
7(h) Perform system and component functional tests on PDU equipment to insure proper functioning within specified parameters. (j) Run all PDU system diagnostics, and correct all diagnosed problems. (k) Resolve any previous outstanding problems, review operation with user personnel, and report any power enhancement or equipment operation recommended changes. (l) Replace control batteries as required. If the control batteries have been used without inverter or bypass AC power, (m) Opening of all doors, drawers, and covers. Perform a thorough inspection of all cabinets for foreign objects. Perform a thorough dusting and vacuuming of all cabinet interiors. Use only rubber or plastic vacuum attachments to clean drawers and cabinets. Except for vacuuming, never attempt to clean the PDU subassemblies. The exterior panels can be cleaned with a mild cleaning solution. Transparent panels should be cleaned with a mild soap and water solution only. Restore all doors and covers to their secured condition. (n) Off-line load test the PDU system to ensure that the system is completely functional. (o) Restoring of the PDUto service as per the manufacturer’s recommended start-up procedures. the service Engineer/ Contractorshall ensure that no damage to the PDU equipment or shutdown will occur because of inrush currents. (p) Contractor Shall be reponsible for 100% working of the PDU Notes :-(i) The contractor shall maintain the PDU as per Schedule includingsunday & all national /local holidays failing so to carry out preventive maintance inthe stipulated time shall recover an amount of 25000/- (ii) The rate quoted Includes the cost oflabour , installation and testing of all 100% parts of the PDUand spares like replacement of electrical , fuses, control & Power transformers (if applicable), Dust filters, indicating lamps; however repairing of above components will be part of Scope. And Spares other than the mentioned shall be measured and paid sepertely under relevent Items (iii) Replacement of Defective Battries and Defective Spares ofIOT Based Monitoring shall be the resposibility of MES as they are under Warrenty Period.
8(iv) Monthly check carried out as per monthly check performa duly approved by the accepting officer/ as per the OEM (v) Contractor have submit maintenace report duly signed by OEM and USER and Eng-in Charge for each PDU separately before submitting the Wok done.(vi) Equipment use for testing purpose must be calibrated and bidder should produce calibration certificate before start the test. (vi) Authorised OEM / Service Engineer must have minimum 3 years of past experience of testing/servicing of the online PDU (viii) The spares provided shall be ofIEC standard. (ix)Due to continuous workingof the Administrative building and continuous running plant, servicing and testing of PDU can only be done on weekly off, holidays or after office hours. (x) PRE Permission has to be obtained from the USER before planning of the Schedule to work Notes For Sr Item No 01 to 03 (i)The contractor will have to submit MOU as given format on page no 125 & 126 from Authorised Service center / OEM of UPSonly. Contractor will concludeMOU with OEM and copy of the agreement will be submitted to GE before Acceptance of Tender (ii) Contractor will conclude AMC with OEM and copy of the agreement will be submitted to GE before Acceptance of the Tender
9Fixing onlySMF batteries of capacity 12 Volt 150 AH with insulation Film/Gar Film for every battery and IR test of the battery carried out before instaltion. HSN Code:85072000 Note:- SMF Batteries 12 Volt 150 AHshall be issued under schedule"B" free for fixing.
10Fixing onlySMF batteries of capacity 12 Volt 9 AH with insulation Film/Gar Film for every battery and IR test of the battery carried out before instaltion. HSN Code:85072000. Note:- SMF Batteries 12 Volt 9 AHshall be issued under schedule"B" free for fixing.
11NOTE :-(i)contractor shouldprovide 50% of the material as listed above within 15 days of the placing of work orderand shall be verified by the Eng-in-charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail