}

Tender For Pre Fabricated Pipe Spools ( Package A), Golaghat-Assam

Numaligarh Refinery Limited has published Tender For Pre Fabricated Pipe Spools ( Package A). Submission Date for this Tender is 28-08-2023. Packaging Tubes and Label Tenders in Golaghat Assam. Bidders can get complete Tender details and download the document.




Tender Notice

38117295
Corrigendum : Tender For Pre Fabricated Pipe Spools ( Package A)
Open Tender
Indian
Assam
Golaghat
28-08-2023

Tender Details

Pre Fabricated Pipe Spools ( Package A) Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing , Supply Of Pre Fabricated Pipe Spools (Package A) , Piping Spoolsupply, Fabrication & Delivery At Site: - Supply Ofpiping Materials Like, Pipe, Fittings, Flanges, Valves For Drain/Vent & Instruments, Fabrication, Ndt,Rfid Taging, Packing, Transportation And Delivery Etc Of Fabricated Spools At Site. - Fabrication Of Piping Spools Including Cutting, Edge Preparation, (Inclusive Of Grinding The Edges Of Pipe, Fittings, Flanges Etc. To Match With The Mating Edges Of Uneven/Differentthickness Wherever Required); Fitup, Bending, Preheating/ Post Heating Wherever Required, Welding (Including Stress Relieving), Threading, Tappings For Pressure Gauges, Thermowells, Sample Connections And Fittings, Like Elbows, Reducers, Tees, Piping Specials Such As Mitres And Fabricated Fittings, Vents, Drains, Reinforcement Pads Also Includes Supports Welding Which Needs To Be Welded With Parent Spool, Cleaning & Flushing By Water/Compressed Air - Surface - Preparartion, Application Of Primer, Intermdiate And Final Coat , Marking As Perpainting Specification. Cost Of Painting To Be Included In Unit Rate For Supply Part In Mt. - All Type Of Testing As Specified In The Specification For Non- Destructive Examination Of Piping, Draining Of Water , Drying By Compressed Air, - Performing Positive Material Identification(Pmi) Using Alloy Analysers: - Engaging Approved Third Party Inspection Agency (Tpia) For Stage Wise Inspection For Procurementand Fabrication, Inspection Release Notesall Inclusiveas Per Approved Qap/Itp - Packing And Delivery Of Fabricated Spoolsat Numaligarh Site - Including All Consumables, Labour, Machineries, Supervision, Preparation & Submission Of Necessary Spool Mark Up Plan , Quality Document , Final Documentation Etc. Needed To Complete Work As Per Specifications And Drawings - Quoted Rate Shall Includes Water And Power Arrangement . - Bidder Quoted Rate Shall Includes All Charges Towards Handing Over Of Material To Store /Contractor And Obtaining Documentation For Delivery Of Piping Spools. - Valves Sw/Bw For Drain/Vent/Instrument Connection For Big Bore Lines Are In Vendor Scope. - Supports Welded Directly To Pipe Only From Parent Pipe Is Included In Vendor . Vendor Shall Follow Minimum Basic Criteria For Spool Fabrication. - Manpower Deployment : Providing Skilled Personnel Till The Contract Period At Nrl Site For Spool Management ,Monitoring, Coordination As Per Sow Document (Tp-1P30a-Pi-Sow-0001) Clause 15 (Site Support) Note:- Quantities Mentioned Below May Varies ± 10% For 6 And Above & 15% For Upto 4 Sizes. , Supply Of Piping Materials - Pipe , Fittings , Flanges , Valves Sw/Bw For Drain/Vent/Instrument Connection, Ndt, Testing, Painting,Transportation And Delivery Etc Of Piping Spools At Site. , Categoryofmaterialgroup:Alloy Steel : Thk. <= 10Mm , As Ibr , As Nace , As Nace+H2 , As Non Ibr , Categoryofmaterial Group:Carbon Steel : Thk. <= 10Mm , Cs Galv , Cs H2 , Cs Ibr , Cs Internal Coated , Cs Nace , Cs Nace+H2 , Cs Non Ibr , Categoryofmaterialgroup:Nickel Alloy : Thk. <= 10Mm , Nickel Alloy 825 , Categoryofmaterialgroup:Hastalloy : Thk. <= 10Mm , Hastalloy Uns N10276 , Categoryofmaterialgroup:Stainless Steel : Thk. <= 10Mm , Ss 304 , Ss 304L Nace , Ss 316L , Ss 321 Nace , Ss 347 , Ss 347 Nace , Categoryofmaterialgroup:Alloy Steel : Thk. > 10Mm And <= 20Mm , As Ibr , As Nace+H2 , As Non Ibr , Categoryofmaterial Group:Carbon Steel : Thk. > 10Mm And <= 20Mm , Cs H2 , Cs Ibr , Cs Nace , Cs Nace+H2 , Cs Non Ibr , Cs Internal Coated , Categoryofmaterialgroup:Nickel Alloy : Thk. > 10Mm And <= 20Mm , Nickel Alloy 825 , Categoryofmaterialgroup:Stainless Steel : Thk. > 10Mm And <= 20Mm , Ss 304L Nace , Ss 316L , Ss 321 Nace , Ss 347 , Categoryofmaterialgroup:Alloy Steel : Thk. > 20Mm And <= 30Mm , As Nace+H2 , As Non Ibr , Categoryofmaterial Group:Carbon Steel : Thk. > 20Mm And <= 30Mm , Cs Nace , Cs Nace+H2 , Cs Non Ibr , Categoryofmaterialgroup:Nickel Alloy : Thk. > 20Mm And <= 30Mm , Nickel Alloy 825 , Categoryofmaterialgroup:Stainless Steel : Thk. > 20Mm And <= 30Mm , Ss 304L Nace , Ss 321 Nace , Ss 347 Nace , Categoryofmaterialgroup:Alloy Steel : Thk. > 30Mm And <= 50Mm , As Non Ibr , Categoryofmaterial Group:Carbon Steel : Thk. > 30Mm And <= 50Mm , Cs Nace , Cs Non Ibr , Categoryofmaterialgroup:Stainless Steel : Thk. > 30Mm And <= 50Mm , Ss 304L Nace , Ss 321 Nace , Ss 347 , Ss 347 Nace , Primary Pipe Support - Weldedable Supports (As Per Scope Defined Elsewhere In The Tender Document) Pad, Trunnion, Corrosion Pad, Pipe Shoe, Vessel Clits Etc. , Categoryofmaterialgroup:Alloy Steel , Categoryofmaterial Group:Carbon Steel , Categoryofmaterialgroup:Nickel Alloy , Categoryofmaterialgroup:Stainless Steel , Categoryofmaterialgroup:Hastalloy , Fabrication Cost, Scope As Per The Material Requisition. Thk. <= 10Mm Carbon Steel Piping (Non Ibr); , Fabricationcost , Carbon Steel Piping (Nace); , Fabricationcost , Carbon Steel Piping (Ibr); , Fabricationcost , Carbon Steel Piping (H2); , Fabricationcost , Alloy Steel Piping (Sour); , Fabricationcost , Alloy Steel Piping (Non Ibr); , Fabricationcost , Alloy Steel Piping (Ibr); , Fabricationcost , Stainless Steel Piping (Non Ibr); , Fabricationcost , Stainless Steel Piping (Nace); , Fabricationcost , Nickel Alloy Piping (Nace); , Fabricationcost , Carbon Steel Piping (Internal Epoxy Coated); , Fabricationcost , Galvanised Carbon Steel Piping (Threaded - Seal Weld ) , Fabricationcost , Nickel Alloy Piping (Nace); , Fabricationcost , Hastalloy Piping (Nace); , Fabricationcost , Thk. > 10Mm And <= 20Mm; Carbon Steel Piping (Non Ibr); , Fabricationcost , Carbon Steel Piping (Nace); , Fabrication Upto 24 Inch , Fabrication Nb 32 Inch - 48 Inch , Carbon Steel Piping (Ibr); , Fabricationcost , Carbon Steel Piping (H2); , Fabricationcost , Alloy Steel Piping (Sour); , Fabricationcost , Alloy Steel Piping (Non Ibr); , Fabricationcost , Alloy Steel Piping (Ibr); , Fabricationcost , Stainless Steel Piping (Non Ibr); , Fabricationcost , Stainless Steel Piping (Nace); , Fabricationcost , Nickel Alloy Piping (Nace); , Fabricationcost , Carbon Steel Piping (Internal Epoxy Coated); , Fabrication Nb 26 Inch - 30 Inch , Fabrication Nb 32 Inch - 48 Inch , Thk. > 20Mm And <= 30Mm : Carbon Steel Piping (Non Ibr); , Fabricationcost , Carbon Steel Piping (Nace); , Fabricationcost , Carbon Steel Piping (H2); , Fabricationcost , Alloy Steel Piping (Sour); , Fabricationcost , Alloy Steel Piping (Non Ibr); , Fabricationcost , Stainless Steel Piping (Nace); , Fabricationcost , Nickel Alloy Piping (Nace); , Fabricationcost , Thk. > 30Mm And <= 50Mm Carbon Steel Piping (Non Ibr); , Fabricationcost , Carbon Steel Piping (Nace); , Fabricationcost , Alloy Steel Piping (Non Ibr); , Fabricationcost , Stainless Steel Piping (Nace); , Fabricationcost , Stainless Steel Piping (Non Ibr); , Fabricationcost , Modification Works As Defiened In Scope Of Work - Including Necessary Consumables, Manpower, Tools, Machineries, Retesting Etc. Complete In All Respect. This Item Will Be Operated As Per Instruction Ofinspection Incharge Only. Ref. Detailed Procedure Attached For Modiication Work In Measurement Of Works In Scope Of Work Annexure--2 Of Material Requisition Cutting Andgrinding Ofwelded Joints A. For All Material Grades Undermaterial Group : Carbon Steel , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , Size : 32 In To 48 In , For All Material Grades Undermaterial Group :Alloy Steel , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , For All Material Grades Undermaterial Group : Carbon Steel , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , For All Material Grades Undermaterial Group : Carbon Steel , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , For All Material Grades Undermaterial Group :Hastalloy , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , Edgepreparation, Fit Up Andwelding For All Material Grades Undermaterial Group : Carbon Steel , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , Size : 32 In To 48 In , For All Material Grades Undermaterial Group :Alloy Steel , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , For All Material Grades Undermaterial Group :Stain Less Steel , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , For All Material Grades Undermaterial Group :Nickel Alloy , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , For All Material Grades Undermaterial Group :Hastalloy , Size Below 2 In , Size : 2 In To 6 In , Size : 8 In To 14In , Size : 16 In To 24 In , Manpower Deployment : Plant Location : Rptu For Nrl Expansion Project At Numaligarh Refinery Providing Skilled Personnel Till The Contract Period At Nrl Site For Spool Management, Monitoring, Coordination. Scope Includes But Not Limited To Below. • Coordination With Warehouse Incharge. • Coordination With Site Team And Coordination With Prefabrication Shop Team For Sequence Of Material Required At Site And Get The Material In Sequence With Respect To Erection Sequence. • Providing Computer 3 Nos Equipped With Necessary Software At Site Along With Deplyment Of Specialist , Updation Of Lhs In System ,In Co-Ordinatinon With Mechanical Contractor, Erection Report, Material Constrain Report (Loop Wise, System Wise, Line Wise Etc.) . Quoted Rates Shall Include All Lodging, Boarding, Transport Arrangement, Mobilisation, Demobilisation ,Insurance ,All Statutory Requirements,Contractors Overhead And Profits Cost Etc. , Manpower Supply For Coordination With Warehouse For Receipt Of Material , Entry Of Material Inside Refinery , Coordination With Site Team And Coordination With Prefabricated Spool Vendor Shop Team For Sequence Of Material Required At Site And Get The Material In Sequence With Respect To Erection Sequence. Minimum 1 Nos Specialist , Manpower Supply For Along Withcomputer 3 Nosequipped With Necesarysoftware At Site Along With Deployment Of Specialist , Updation Of Lhs In System, In Co-Ordinatinon With Mechanical Contractor, Erection Report, Material Constrain Report (Loop Wise, System Wise, Line Wise Etc.). Minimum 1 Nos Specialist

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Jun-2023 Corrigendum 1 Date 17-07-2023
2 28-Jun-2023 Corrigendum 2 BOQ 17-07-2023
3 17-Jul-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 24-07-2023
4 20-Jul-2023 Corrigendum-3 Technical Bid 24-07-2023
5 25-Jul-2023 Corrigendum 4 Date 07-08-2023
6 07-Aug-2023 Corrigendum5 Date 21-08-2023
7 17-Aug-2023 Corrigendum 6 Other 21-08-2023
8 22-Aug-2023 Corrigendum 7 Date 24-08-2023
9 25-Aug-2023 Corrigendum 8 Date 28-08-2023
10 25-Aug-2023 Corrigendum 9 Technical Bid 28-08-2023

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Manufacturing, procurement of materials and bought out components, assembly at shop, Inspection including inspection by TPIA, Testing at manufacturer"s works, packing, supply , including transportation of PRE FABRICATED SPOOL WITH MATERIALas per material requisition attached on DAP Site basis for NRL RPTU project at NRL, Numaligarh, Golaghat District, Assam
Sl. No. Item Description
1PIPING SPOOLSUPPLY, FABRICATION & DELIVERY AT SITE: - Supply ofpiping materials like, pipe, fittings, flanges, valves for drain/vent & instruments, fabrication, NDT,RFID taging, Packing, transportation and delivery etc of fabricated spools at site. - Fabrication of Piping Spools including cutting, edge preparation, (inclusive of grinding the edges of pipe, fittings, flanges etc. to match with the mating edges of uneven/differentthickness wherever required); fitup, bending, preheating/ post heating wherever required, welding (including stress relieving), threading, tappings for pressure gauges, thermowells, sample connections and fittings, like elbows, reducers, tees, piping specials such as mitres and fabricated fittings, vents, drains, reinforcement pads also includes supports welding which needs to be welded with parent spool, cleaning & flushing by water/compressed air - Surface - preparartion, application of primer, intermdiate and final coat , marking as perpainting specification. Cost of painting to be included in unit rate for supply part in MT. - All type of testing as specified in the specification for Non- Destructive Examination of Piping, draining of water , drying by compressed air, - Performing Positive Material Identification(PMI) using alloy analysers: - Engaging approved Third Party Inspection agency (TPIA) for stage wise inspection for procurementand fabrication, inspection release notesall inclusiveas per approved QAP/ITP - Packing and delivery of fabricated spoolsat Numaligarh site - Including all consumables, labour, machineries, supervision, preparation & submission of necessary spool mark up plan , quality document , final documentation etc. needed to complete work as per specifications and drawings - Quoted rate shall includes water and power arrangement . - Bidder quoted rate shall includes all charges towards handing over of material to store /contractor and obtaining documentation for delivery of piping spools. - Valves SW/BW for drain/vent/instrument connection for big bore lines are in vendor scope. - Supports welded directly to pipe only from parent pipe is included in vendor . vendor shall follow minimum basic criteria for spool fabrication. - Manpower deployment : Providing skilled personnel till the contract period at NRL site for spool management ,Monitoring, Coordination as per SOW document (TP-1P30A-PI-SOW-0001) clause 15 (Site Support) Note:- Quantities mentioned below may varies ± 10% for 6" and above & 15% for upto 4" sizes.
2Supply of Piping materials - Pipe , fittings , flanges , Valves SW/BW for drain/vent/instrument connection, NDT, Testing, Painting,Transportation and Delivery etc of PIPING SPOOLS at site.
3CategoryOfMaterialGroup:Alloy steel : THK. <= 10MM
4AS IBR
5AS NACE
6AS NACE+H2
7AS NON IBR
8CategoryOfMaterial Group:Carbon steel : THK. <= 10MM
9CS GALV
10CS H2
11CS IBR
12CS INTERNAL COATED
13CS NACE
14CS NACE+H2
15CS NON IBR
16CategoryOfMaterialGroup:Nickel Alloy : THK. <= 10MM
17Nickel Alloy 825
18CategoryOfMaterialGroup:Hastalloy : THK. <= 10MM
19Hastalloy UNS N10276
20CategoryOfMaterialGroup:Stainless Steel : THK. <= 10MM
21SS 304
22SS 304L NACE
23SS 316L
24SS 321 NACE
25SS 347
26SS 347 NACE
27CategoryOfMaterialGroup:Alloy steel : THK. > 10MM AND <= 20MM
28AS IBR
29AS NACE+H2
30AS NON IBR
31CategoryOfMaterial Group:Carbon steel : THK. > 10MM AND <= 20MM
32CS H2
33CS IBR
34CS NACE
35CS NACE+H2
36CS NON IBR
37CS INTERNAL COATED
38CategoryOfMaterialGroup:Nickel Alloy : THK. > 10MM AND <= 20MM
39Nickel Alloy 825
40CategoryOfMaterialGroup:Stainless Steel : THK. > 10MM AND <= 20MM
41SS 304L NACE
42SS 316L
43SS 321 NACE
44SS 347
45CategoryOfMaterialGroup:Alloy steel : THK. > 20MM AND <= 30MM
46AS NACE+H2
47AS NON IBR
48CategoryOfMaterial Group:Carbon steel : THK. > 20MM AND <= 30MM
49CS NACE
50CS NACE+H2
51CS NON IBR
52CategoryOfMaterialGroup:Nickel Alloy : THK. > 20MM AND <= 30MM
53Nickel Alloy 825
54CategoryOfMaterialGroup:Stainless Steel : THK. > 20MM AND <= 30MM
55SS 304L NACE
56SS 321 NACE
57SS 347 NACE
58CategoryOfMaterialGroup:Alloy steel : THK. > 30MM AND <= 50MM
59AS NON IBR
60CategoryOfMaterial Group:Carbon steel : THK. > 30MM AND <= 50MM
61CS NACE
62CS NON IBR
63CategoryOfMaterialGroup:Stainless Steel : THK. > 30MM AND <= 50MM
64SS 304L NACE
65SS 321 NACE
66SS 347
67SS 347 NACE
68Primary Pipe Support - Weldedable supports (as per Scope defined elsewhere in the tender document) PAD, TRUNNION, CORROSION PAD, Pipe Shoe, Vessel clits etc.
69CategoryOfMaterialGroup:Alloy steel
70CategoryOfMaterial Group:Carbon steel
71CategoryOfMaterialGroup:Nickel Alloy
72CategoryOfMaterialGroup:Stainless Steel
73CategoryOfMaterialGroup:Hastalloy
74Fabrication Cost, scope as per the material requisition. THK. <= 10MM CARBON STEEL PIPING (NON IBR);
75FabricationCost
76CARBON STEEL PIPING (NACE);
77FABRICATIONCOST
78CARBON STEEL PIPING (IBR);
79FABRICATIONCOST
80CARBON STEEL PIPING (H2);
81FABRICATIONCOST
82ALLOY STEEL PIPING (SOUR);
83FABRICATIONCOST
84ALLOY STEEL PIPING (NON IBR);
85FABRICATIONCOST
86ALLOY STEEL PIPING (IBR);
87FABRICATIONCOST
88STAINLESS STEEL PIPING (NON IBR);
89FABRICATIONCOST
90STAINLESS STEEL PIPING (NACE);
91FABRICATIONCOST
92NICKEL ALLOY PIPING (NACE);
93FABRICATIONCOST
94CARBON STEEL PIPING (Internal Epoxy Coated);
95FABRICATIONCOST
96GALVANISED CARBON STEEL PIPING (THREADED - Seal weld )
97FABRICATIONCOST
98NICKEL ALLOY PIPING (NACE);
99FABRICATIONCOST
100HASTALLOY PIPING (NACE);
101FABRICATIONCOST
102THK. > 10MM AND <= 20MM; CARBON STEEL PIPING (NON IBR);
103FABRICATIONCOST
104CARBON STEEL PIPING (NACE);
105FABRICATION UPTO 24 INCH
106FABRICATION NB 32 INCH - 48 INCH
107CARBON STEEL PIPING (IBR);
108FABRICATIONCOST
109CARBON STEEL PIPING (H2);
110FABRICATIONCOST
111ALLOY STEEL PIPING (SOUR);
112FABRICATIONCOST
113ALLOY STEEL PIPING (NON IBR);
114FABRICATIONCOST
115ALLOY STEEL PIPING (IBR);
116FABRICATIONCOST
117STAINLESS STEEL PIPING (NON IBR);
118FABRICATIONCOST
119STAINLESS STEEL PIPING (NACE);
120FABRICATIONCOST
121NICKEL ALLOY PIPING (NACE);
122FABRICATIONCOST
123CARBON STEEL PIPING (Internal Epoxy Coated);
124FABRICATION NB 26 INCH - 30 INCH
125FABRICATION NB 32 INCH - 48 INCH
126THK. > 20MM AND <= 30MM : CARBON STEEL PIPING (NON IBR);
127FABRICATIONCOST
128CARBON STEEL PIPING (NACE);
129FABRICATIONCOST
130CARBON STEEL PIPING (H2);
131FABRICATIONCOST
132ALLOY STEEL PIPING (SOUR);
133FABRICATIONCOST
134ALLOY STEEL PIPING (NON IBR);
135FABRICATIONCOST
136STAINLESS STEEL PIPING (NACE);
137FABRICATIONCOST
138NICKEL ALLOY PIPING (NACE);
139FABRICATIONCOST
140THK. > 30MM AND <= 50MM CARBON STEEL PIPING (NON IBR);
141FABRICATIONCOST
142CARBON STEEL PIPING (NACE);
143FABRICATIONCOST
144ALLOY STEEL PIPING (NON IBR);
145FABRICATIONCOST
146STAINLESS STEEL PIPING (NACE);
147FABRICATIONCOST
148STAINLESS STEEL PIPING (NON IBR);
149FABRICATIONCOST
150Modification Works as defiened in scope of work - including necessary consumables, manpower, tools, machineries, retesting etc. complete in all respect. This item will be operated as per instruction ofInspection incharge only. Ref. Detailed procedure attached for modiication work In measurement of works in Scope of work Annexure--2 of material requisition Cutting andgrinding ofwelded joints A. For all material grades UnderMaterial Group : Carbon Steel
151Size below 2 IN
152Size : 2 IN to 6 IN
153Size : 8 IN to 14IN
154Size : 16 IN to 24 IN
155Size : 32 IN to 48 IN
156For all material grades UnderMaterial Group :Alloy Steel
157Size below 2 IN
158Size : 2 IN to 6 IN
159Size : 8 IN to 14IN
160Size : 16 IN to 24 IN
161For all material grades UnderMaterial Group : Carbon Steel
162Size below 2 IN
163Size : 2 IN to 6 IN
164Size : 8 IN to 14IN
165Size : 16 IN to 24 IN
166For all material grades UnderMaterial Group : Carbon Steel
167Size below 2 IN
168Size : 2 IN to 6 IN
169Size : 8 IN to 14IN
170For all material grades UnderMaterial Group :HASTALLOY
171Size below 2 IN
172Size : 2 IN to 6 IN
173Size : 8 IN to 14IN
174Size : 16 IN to 24 IN
175Edgepreparation, Fit up andWelding For all material grades UnderMaterial Group : Carbon Steel
176Size below 2 IN
177Size : 2 IN to 6 IN
178Size : 8 IN to 14IN
179Size : 16 IN to 24 IN
180Size : 32 IN to 48 IN
181For all material grades UnderMaterial Group :Alloy Steel
182Size below 2 IN
183Size : 2 IN to 6 IN
184Size : 8 IN to 14IN
185Size : 16 IN to 24 IN
186For all material grades UnderMaterial Group :Stain less steel
187Size below 2 IN
188Size : 2 IN to 6 IN
189Size : 8 IN to 14IN
190Size : 16 IN to 24 IN
191For all material grades UnderMaterial Group :Nickel Alloy
192Size below 2 IN
193Size : 2 IN to 6 IN
194Size : 8 IN to 14IN
195For all material grades UnderMaterial Group :HASTALLOY
196Size below 2 IN
197Size : 2 IN to 6 IN
198Size : 8 IN to 14IN
199Size : 16 IN to 24 IN
200Manpower deployment : Plant Location : RPTU for NRL EXPANSION PROJECT AT NUMALIGARH REFINERY Providing skilled personnel till the contract period at NRL site for spool management, Monitoring, Coordination. Scope includes but not limited to below. • Coordination with warehouse incharge. • Coordination with site team and Coordination with Prefabrication shop team for sequence of material required at site and get the material in sequence with respect to erection sequence. • Providing computer 3 nos equipped with necessary software at site along with deplyment of specialist , Updation of LHS in system ,in co-ordinatinon with Mechanical contractor, Erection report, material constrain report (Loop wise, System wise, Line wise etc.) . Quoted rates shall include all lodging, boarding, transport arrangement, mobilisation, demobilisation ,insurance ,all statutory requirements,Contractor"s overhead and profits cost etc.
201Manpower Supply for Coordination with warehouse for receipt of material , entry of material inside refinery , Coordination with site team and Coordination with Prefabricated Spool Vendor shop team for sequence of material required at site and get the material in sequence with respect to erection sequence. minimum 1 nos specialist
202Manpower Supply for along withcomputer 3 nosequipped with necesarysoftware at site along with deployment of specialist , Updation of LHS in system, in co-ordinatinon with Mechanical contractor, Erection report, material constrain report (Loop wise, System wise, Line wise etc.). Minimum 1 nos specialist
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail