Tender For Installation Of Metallic Protective Guard Over Insulated Lines In Various Units Of Iocl, Bgr (Phase - 1), bongaigaon-Assam

Indian Oil Corporation Limited-IOCL has published Tender For Installation Of Metallic Protective Guard Over Insulated Lines In Various Units Of Iocl, Bgr (Phase - 1). Submission Date for this Tender is 23-06-2023. Machine Tools Tenders in bongaigaon Assam. Bidders can get complete Tender details and download the document.




Tender Notice

38101671
Tender For Installation Of Metallic Protective Guard Over Insulated Lines In Various Units Of Iocl, Bgr (Phase - 1)
Open Tender
Indian
Assam
bongaigaon
23-06-2023

Tender Details

Installation Of Metallic Protective Guard Over Insulated Lines In Various Units Of Iocl, Bgr ( Phase - 1 )

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Installation of metallic protective guard over insulated lines in various units of IOCL, BGR (phase - 1)
Sl. No. Item Description
1Metallic guard over insulated lines
2Taking out old worn out damaged insulation materials of any thickness including wool,mattress, pre-formed sections or any other insulating materials including cladding of aluminium or GI sheet from any height and location etc. complete and transporting and stacking the serviceable materials to owner"s storage point and damaged materials within 2.00 km lead inside Refinery .The job also includes cleaning the site, transporting the materials to directed place at any height, complete with all labour and materials etc. as per specification and direction of Engineer-In-Charge but excluding the cost of scaffolding. (Payment shall be made on the previously finished surface area).
3Taking out old worn out damaged cladding of any thickness (plain or corrugated; GI or Aluminium sheet) from any height and location and transporting and stackingthe serviceable materials to owner"s storage point and damaged materials to the directed place within refinery premises within 2.00 km lead. The job also includes cleaning the site, transporting the materials to directed place, complete with all labor and materials etc.as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment shall be made on the previously finished surface area).
4Supplying and applying various epoxy and other protective intermediate / finish paints of approved brand andmanufacturer at all heights over prepared/primed surface for steel structures, pipelines, tanks, vessels, equipments, concrete floors etc. as per manufacturers specification and directions of Engineer-in-charge all complete including all materials, labours, tools-tackles and consumables etcbut excluding Scaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve required DFTby applying more coats (if required) within the relevant SOR item rates.
5HR aluminium / Silicone Aluminium paint 120 - 200 degree C to achive a minimum DFT of 40 microns (Twoor more coats of20 micron each).
6Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
7Lettering with black Japan paint of approved brand and manufacture. Note: Rate EACH (EA) stands for "Per letter per cm height".
8Providing, fabrication and installation of metallic guard pregalvanized high tensile steel confirming to IS:277-199 as per following: 1) Grid size -spacing 12 mm *12 mm wide 2) GI wire thcikness- 2mm 3) Both end capped with GI strip having dimensions of 30mm *3mm with bolted connection 4) Spacer- 30mm *3mm (Four numbers at each end) The above shall be fixed by Galvanised steel bolts & nuts 6 mm dia and 25 mm long roundhead with slots Note: All above specifications is for 1 meter length
9Fixing cladding with new / old aluminium / GI sheets, plain or corrugated. The job includes cutting, bending & joints and securing the overlaps alternately by POP grooving to proper shape and size, providing minimum 50mm overlaps on both longitudinal and circumferential joints including end termination/ cap and securing the overlaps alternately by POP rivets and self- tapping screws at every 150mm c/c, andsecuring additionally with metalic bands at amaximumspacing of300mm c/c atany height andlocation with all labour, materialsetc. complete as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment of above shall be made on the area of the finished surface). Note: 1. Screw, requiredfor metal jacket securement shall be SS / Cadmium plated steel self tapping , type A No.8 Dia*12mm long to BS 4176 complete with Neoprene washers under the head. Rivets required for metal jacket securement shall be the expanding aluminium "POP" blind eye type/SS, 9.5mm long* 5mm dia. 2. For additional securement of cladding,Band, SS 12mm (Min.) wide x 24SWG thick is to be used for pipings andBand, SS 20mm wide x 24SWG thick is to be used for equpiments. 3.For ensuring perfect waterproofing, all the cladding joints shall be sealed with approved elastomeric metal sealant. 4. For insulations with vapour barrier, cladding shall not be applied until the vapour barrier has completelydried and solvents have dissipated. Self tapping screws/ rivets shall not be used to secure aluminiumcladding as they may puncture the vapour barrier.
10Aluminum sheet- Plain - 24 SWG as per ASTM B209 Alloy 3003 H16 or IS-737 Designation 31000, Condition H3 - to be arranged by Contractor.
11STEEL SCAFFLODING (MATERIALS IN CONTRACTOR"S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the areas specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding material including supply of all tools, tackles, consumables, labours and contractor"s supervision as directed by the Engineer-in-Charge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs
12Upto 6 M
13Above 6 m upto 10 m
14Above 10 m upto 20 m
15Above 20 m upto 30 m
16Above 30 m upto 40 m
17Above 40 m upto 50 m
18Above 50 m upto 90 m
19Intermediate plate form
20Metallic guard over insulated lines SRU
21Taking out old worn out damaged insulation materials of any thickness including wool,mattress, pre-formed sections or any other insulating materials including cladding of aluminium or GI sheet from any height and location etc. complete and transporting and stacking the serviceable materials to owner"s storage point and damaged materials within 2.00 km lead inside Refinery .The job also includes cleaning the site, transporting the materials to directed place at any height, complete with all labour and materials etc. as per specification and direction of Engineer-In-Charge but excluding the cost of scaffolding. (Payment shall be made on the previously finished surface area).
22Taking out old worn out damaged cladding of any thickness (plain or corrugated; GI or Aluminium sheet) from any height and location and transporting and stackingthe serviceable materials to owner"s storage point and damaged materials to the directed place within refinery premises within 2.00 km lead. The job also includes cleaning the site, transporting the materials to directed place, complete with all labor and materials etc.as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment shall be made on the previously finished surface area).
23Supplying and applying various epoxy and other protective intermediate / finish paints of approved brand andmanufacturer at all heights over prepared/primed surface for steel structures, pipelines, tanks, vessels, equipments, concrete floors etc. as per manufacturers specification and directions of Engineer-in-charge all complete including all materials, labours, tools-tackles and consumables etcbut excluding Scaffolding. Note- No. of coats mentioned in the SOR items are only indicative and contractor has to achieve required DFTby applying more coats (if required) within the relevant SOR item rates.
24HR aluminium / Silicone Aluminium paint 120 - 200 degree C to achive a minimum DFT of 40 microns (Twoor more coats of20 micron each).
25Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
26Lettering with black Japan paint of approved brand and manufacture. Note: Rate EACH (EA) stands for "Per letter per cm height".
27Providing, fabrication and installation of metallic guard pregalvanized high tensile steel confirming to IS:277-199 as per following: 1) Grid size -spacing 12 mm *12 mm wide 2) GI wire thcikness- 2mm 3) Both end capped with GI strip having dimensions of 30mm *3mm with bolted connection 4) Spacer- 30mm *3mm (Four numbers at each end) The above shall be fixed by Galvanised steel bolts & nuts 6 mm dia and 25 mm long roundhead with slots Note: All above specifications is for 1 meter length
28Fixing cladding with new / old aluminium / GI sheets, plain or corrugated. The job includes cutting, bending & joints and securing the overlaps alternately by POP grooving to proper shape and size, providing minimum 50mm overlaps on both longitudinal and circumferential joints including end termination/ cap and securing the overlaps alternately by POP rivets and self- tapping screws at every 150mm c/c, andsecuring additionally with metalic bands at amaximumspacing of300mm c/c atany height andlocation with all labour, materialsetc. complete as per direction of Engineer-in-Charge but excluding the cost of scaffolding. (Payment of above shall be made on the area of the finished surface). Note: 1. Screw, requiredfor metal jacket securement shall be SS / Cadmium plated steel self tapping , type A No.8 Dia*12mm long to BS 4176 complete with Neoprene washers under the head. Rivets required for metal jacket securement shall be the expanding aluminium "POP" blind eye type/SS, 9.5mm long* 5mm dia. 2. For additional securement of cladding,Band, SS 12mm (Min.) wide x 24SWG thick is to be used for pipings andBand, SS 20mm wide x 24SWG thick is to be used for equpiments. 3.For ensuring perfect waterproofing, all the cladding joints shall be sealed with approved elastomeric metal sealant. 4. For insulations with vapour barrier, cladding shall not be applied until the vapour barrier has completelydried and solvents have dissipated. Self tapping screws/ rivets shall not be used to secure aluminiumcladding as they may puncture the vapour barrier.
29Aluminum sheet- Plain - 24 SWG as per ASTM B209 Alloy 3003 H16 or IS-737 Designation 31000, Condition H3 - to be arranged by Contractor.
30STEEL SCAFFLODING (MATERIALS IN CONTRACTOR"S SCOPE) The job includes supply of all scaffolding materials, transportation to work site, erection of scaffolding at site covering the areas specified as per ISMS-1007 safety standards and dismantling scaffolding after completion of job and taking away the scaffolding material including supply of all tools, tackles, consumables, labours and contractor"s supervision as directed by the Engineer-in-Charge Note: 1. For measurement in SQM: 2 (length + width) X height area covered by the scaffolding is to be taken. 2. Scaffolding measurement to be done by breaking the height into parts as per height slab mentioned below and adopting respective rates against mentioned height slabs
31Upto 6 M
32Above 6 m upto 10 m
33Above 10 m upto 20 m
34Above 20 m upto 30 m
35Above 30 m upto 40 m
36Above 40 m upto 50 m
37Above 50 m upto 90 m
38Intermediate plate form
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail