|
| 1 | Provision for water pump operator at Pump Chamber, WTP & Raw water boosting station JLN feeder as per latestDC Rate wages (Sonipat) for 12 months (Including EPF and ESI @ 12.75%) |
| 2 | Provision for Beldar at water works for watch and ward as per latest DC Rate wages (Sonipat) for 12 months (Including EPF and ESI @ 12.75%) |
| 3 | Provision for Electrician as per latest DC Rate wages (Sonipat)for 12 months (Including EPF and ESI @ 12.75%) |
| 4 | Provision for Fitter as per latest DC Rate wages (Sonipat)for 12 months (Including EPF and ESI @ 12.75%) |
| 5 | Provision for Fitter Helper as per latest DC Rate wages (Sonipat) for 12 months. (Including EPF and ESI @ 12.75%) |
| 6 | Provision for repair of L.T. Pannel Transformer, capacitor pannel board etc., |
| 7 | Provision for repair of work out pump, motors starter parts for one year details are as under:-210 BHP x2 (Submersible set) (Spare)90 BHP x1(Submersible set)50 BHP x 2 (Horizontal set) 20 BHP x 4(Horizontal set) |
| 8 | Repair of Rising main, 24\" i/d, 14\" i/d, 12 i/d, 10\" i/d, 8\" i/d, 6\" i/d & 4\" i/d D.I. pipeand complete distribution system for 12 Months |
| 9 | Repair of existing structures i.e pump chamber, water treatment plant, OHSR,staff Qtr. and officesetc. |
| 10 | Provision for repair and replacement of old and condum sluice valve, reflex valve as per requirement and as direction of Engineer-In-Charge. |
| 11 | Provision for painting, colouring, white washing, Apex etc. on existing structures as per requirement and direction of Engineering –In Charge |
| 12 | Provision for disilting of 3 Nos. S/S tank, Raw water collecting tank and other structures etc.(after up-gradation of water works) |
| 13 | Provision for replacement of filter media top layer as per requirement. |
| 14 | Provision for Chlorine gas (3 PPM)- Qty. 2811 Kg. Approx. the qty. may be increased as per site requirement. |
| 15 | Provision for Alum 10 PPM in normal days Qty. 8432 Kg. Approx. the qty. may be increased as per site requirement. |
| 16 | Provision for dehydration & fill up of transformer oil |
| 17 | Replacement of compressor oilQty. may be increased as per site requirement. |
| 18 | Provision for cotton waste, bulb, tube, grease, glain dori, nut & bolt, inner sheet Dangri and rain coat of filed staff, Soap, first aid kit/working tool andbucket mug etc. for chlorination for 12 months |
| 19 | Provision for Dangri and rain coat of filed staff, Soap, first aid kit/working tool andbucket mug etc. for chlorination for 12 months |
| 20 | Provision for cleaning of 2 Nos. clear water tank two time in a year or as per direction of Engineer-In-Charge. |