Municipal Corporation-MC has published Tender For Providing Supplying Spares And Rectification Of Electrical And Mechanical Equipment In Pump House And Switch Yard Of Raw Water Pump House Near Waghur Dam Annual Maintenance For Year 2023 24. Submission Date for this Tender is 14-06-2023. Casks Barrels and Drums Tenders in jalgaon Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supplyof 33KV, 3 core, 300 sq.mm. XLPE, Aluminum armoredoutdoor cable end termination joint kit. Heat shrinkable type. |
2 | Installation of 33 KV, 3 core, 300 sq.mm. aluminium armoured outdoor cable end termination cable joint by heat shrinkable process, Meggering complete cable and refixing to the system. |
3 | Supply of33 KV, aluminium, XLPE, 3 core 300 sq.mm.XLPEalum Armoured cable. |
4 | Supply of33 KV 3 core 70/95sq.mm alum. Armoured cable. |
5 | Supplyof 33KV, 3 core, 70/95 sq.mm, Aluminum armoredoutdoor cable end termination joint kit. Heat shrinkable type. |
6 | Installation of 33 KV, 3 core, 70/95 sq.mm. aluminium armoured outdoor cable end termination cable joint by heat shrinkable process, Meggering complete cable and refixing to the system. |
7 | Excavation and backfilling of trench for adjustment of33 KV cable for joint. |
8 | Supply and installation of LT out door cable joint for auxiliary transformer |
9 | Supply and installation of 33 KV Isolator set of 3 with alignment |
10 | Dismantailing of existing 33 KV Isolator complete set |
11 | Repairing of 33 KV existingisolator along with required spares & hardware’s with alignment for smooth operations |
12 | supply and installation of 33 KVA B Switchfor auxiliary Transformer |
13 | Dismantailing of existing 33 KVA B Switchcomplete set |
14 | Repairing of 33 KV existing A B Switchincluding required spares & hardwares with alignment for smooth operations |
15 | Supply and installation of 33 KV Horn gap fuses |
16 | Repairing of 33 KV Horn gap post for proper fixing of fuses |
17 | Supply and installation of D O fuse 50 amps |
18 | Supply and installation of 33 KV, LAsingle post |
19 | Supply and installation ofPost Insulator with Pin |
20 | Supply & Installation of 33 KV outdoor PT |
21 | Dismantaing of existing damaged 33 KVPT |
22 | Supply & Installation of 33 KV outdoor CT |
23 | Dismantailing of 33 KV outdoor CT |
24 | Repairing of existing 33 KV outdoor PT |
25 | Repairing of existing 33 KV outdoor CT |
26 | Repairing and tightening of allpostinsulator and cleaning by CTC |
27 | Tightening of all conductors, Aluminium lugs and Hardwaresin sub station as preventiv maintenance to avoide faults |
28 | Transformer, 33 KV/3.3 KV, 3000 KVA complete overhauling, Bucolz relay, BDV test, PPM test, tightening of all 33 KV Bushing and conductors removing air from Bucolz relay, cleaning of all bushing with CTC. Attending leakages if any. |
29 | Transformer, 33 KV/3.3 KV, 3000 KVA. Oil filtration of about 1980 literswith test report. |
30 | Supply & Installation of Buchloz relay for 33 KV out door transformer. |
31 | Supply & Installation of Breather with silica jel for 33 KV outdoor Transformer. |
32 | Auxiliary Transformer 33 KV /440 Volts complete preventive maintenance. Tightening of all bushing, gaskets, conductors and cable terminations, earthing etc |
33 | Oil filtration of Auxiliary Transformer 33 KV/440 Volts with all test reports |
34 | Supply ofinsulating Transformer oil as per requirement for top up of Transformers |
35 | Complete overhauling of 33 KV out door VCB.All control wiring tightening, spring changing motor testing, earthing tightening etc |
36 | Earthing of sub station - Replace existing material by new material to improve value |
37 | illumination in yard.Supply and installation of fused tubes, bulbs wiring testing etc |
38 | Supply and installationof Indoor cable joint for 3.3 KV, 500 HP motor, coppermulti strandfor H T motor Dismantailing of exi existing burnt out / heated cable joint, cleaning cable by CTCpreparing new joint and HT taping and Meggering |
39 | Repairing of existing joint of 3.3 KV H T motor.Cleaning by CTC to clean cable and Lugs for carbon free particle’s, re-taping by H T tape and Meggering |
40 | Supply and installationofH T capacitor (120KVAR unit) |
41 | Supply ofL T capacitor |
42 | Installation of L T capacitor |
43 | Supply of H THRC Fuse 3.3 KV/50 Amps capacity with barrel for capacitor |
44 | Installation of HT capacitor fuse ,testing ,checking current on load etc |
45 | 500 HP, 3.3 KV, H T motor complete overhauling . Shifting motor from foundation by disconnecting cable, pulley etc. Dismantailing/ taking out rotor from stator. H T warnishing to rotor and stator by heating process Inspection of bearings, end cover bearing housing etc |
46 | Providing & Fitting Bearing to the 500 HP, 3.3 KV, motor DE side including necessary fixtures etc. complete. |
47 | Providing & Fitting Bearing to the 500 HP, 3.3 KV, motor NDE side including necessary fixtures etc. complete. |
48 | Workshop work for filling weared out bearing housing of Motor |
49 | Workshop work for filling weared out bearing shaft of motor |
50 | Rotor balancing for proper alignment to improve life of motor |
51 | Preventive maintenance of motor. Inspection of bearings, cable joints, foundation bolts tightness, cleaning of cooling system greasing to DE andNDE bearings |
52 | Replace of Motor from foundation to other foundation |
53 | Alignment of Motor to pump |
54 | 500 H.P. 375 Kw. Pump set(Kirloskar make)Remove of existing old splitcasing pump from raw water pumping station for Repairing purpose. |
55 | Fitting Impeller to the pump including necessary Fixtures etc. complete |
56 | Providing & fitting Casing wear Ring suction side) to the Pump including necessary fixtures etc. complete. |
57 | Providing & Fitting Casing Wear Ring (Delivery side) to the pump including necessary fixtures etc. complete. |
58 | Providing & Fitting Split Gland to the pump including necessary fixtures etc. complete. |
59 | workshop work of Bearing holder& Fitting DEside to the pump including necessary fixtures etc. complete. |
60 | workshop work of Bearing holder& Fitting NDEside to the pump including necessary fixtures etc. complete. |
61 | Work shop work as filling weared shaft at DE/NDE side ,weared shaft at gland packing location |
62 | Work shop work as filling weared shaft at DE couplingside |
63 | Rewinding of Motor of EOT crane. |
64 | Repairing Panel board of EOT crane with required accessories. |
65 | Providing & Fitting Split Lantern Ring to the pump including necessary fixtures etc. complete. |
66 | Providing & Fitting Liquid Deflector Rubber to the pump including necessary fixtures etc. complete. |
67 | Providing & Fitting Shaft Sleeve to the pump including necessary fixtures etc. complete. |
68 | Providing & Fitting shaft Sleeve Nutto the pump including necessary fixtures etc. complete. |
69 | Providing & Fitting Bearing Nut to the pump including necessary fixtures etc. complete. |
70 | Providing & Fitting Bearing Lock Nut to the pump including necessary fixtures etc. complete. |
71 | Providing & Fitting Sealing Tube to the pump including necessary fixtures etc. complete. |
72 | Providing & Fitting Set of Gaskets to the pump including necessary fixtures etc. complete. |
73 | Providing & Fitting Set of Ring to the pump including necessary fixtures etc. complete. |
74 | Providing & Fitting Set of Fasteners to the pump including necessary fixtures etc. complete. |
75 | Providing & Fitting Gland Packing to the pump including necessary fixtures etc. complete. |
76 | Supply & Installation of rubber bushes as per requirement of coupling |
77 | Providing & Fitting Bearings to the pump including necessary fixtures etc. complete. |
78 | Providing Coupling set with rubber & studs complete with suitable bore size |
79 | Installation of Couplingwith rubber & studs complete with suitable bore size |
80 | Providing nylon slings belts of 5 to 10 tan capacity (for lifting purpose) |
81 | Providing and fitting of cooling tube set for gland rassi |
82 | EOT crane maintenance work. Inspection of main drum, motors, panel relays etc |
83 | Replace faulty or burnt MCB in EOT crane panel |
84 | Overhauling ofmotors with replacement of bearings for EOT crane |
85 | Cleaning complete both rail of EOT crane |
86 | supply and installation of closing and tripping coil of outdoor |
87 | supply and installation of spring charging motor |
88 | Repairing of spring charging motor |
89 | Repair of VCB, for smooth operations and trolley alignment |
90 | Preventive maintenance of VCB |
91 | Supply & Installation of closing /Tripping coil of VCB Indoor |
92 | Supply & Installation of Earth fault relay |
93 | Supply & Installation of Thermostat |
94 | Supply & Installation of Breaker control switches |
95 | Supply & Installation ofAmmeter 3.3 KV |
96 | Supply & installation of Ammeter selector switch |
97 | Supply & installation of 3.3 KVVoltmeter |
98 | supply & installation of 3.3 KVVoltmeter selector switch |
99 | LT panel - Supply and replacement of faulty/ burnt outspaares |
100 | Supply & Installation ofAmmeter440 Vlots |
101 | Supply & installation of Ammeter selector switch 440 Vlots |
102 | Supply & installation of440Voltmeter |
103 | supply & installation of 440 Voltmeter selector switch |
104 | Preventive maintenance of L.T. panel. |
105 | supplyof complete damaged Control and Relay panel wiring |
106 | Installation of Control and Relay panel wiring. Checking all relays, meters, switches etc |
107 | Battery charger panel -Supply and installation of burnt out spares |
108 | Preventive maintenance of Battery charger panel |
109 | Supply and installation of 110 volt DC Battery |
110 | Preventive maintenance of 55 Batteries |
111 | Supply of Chain Pulley3M Tone capacity |
112 | Supply of Nylon slings belts of 10 M tone capacity for lifting purpose |
113 | Repairing of complete Illumination system in insidepump house |
114 | Repairing of complete illumination systyem in pump house area excluding pump house and substation |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail