Tender For Prv. And Erection Of 3-Ph. Lt Extn. To Imp. Voltage At Vill. L/Kangar And Lt Extn. To Improve Voltage/Lengthy Services At Vill. Kangar And Badhera And 3-Ph Lt Extn. From Various Exist. Sub-Stn At Vill. Badhera Under Esd Haroli.

Issued by Government Departments · gagret, Himachal Pradesh
Tender Value
3.06 Lakhs
Estimated cost
Bid Submission
14 Jun 2023
0 days left
EMD
3064
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
gagret → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Prov. & Erection Of 3-Phase L.T Extension To Improve The Voltage At Village Lower Kangar From Existing 100 Kva, 11 / 0.4 Kv Sub Station Kangar-Ist. And L.T. Extension To Improve Voltage / Lengthy Services At Village Kangar And Badhera From Existing Substation And 3-Phase L.T Extension From Exist. 25 Kva 11 / 0.4 Kv Sub Station At Village Badhera Under Esd, Haroli.Bid No ( Ged-05 / 2023-24 ) Name Of Scheme: Release Of Gsc In ( Op Circle ) Una

BOQ

Name of Work:Tender for prov. & erection of 3-Phase L.T extension to improve the voltage at village Lower Kangar from existing 100 KVA, 11/0.4 KV Sub station Kangar-Ist. and L.T. extension to improve voltage/lengthy services at village Kangar and Badhera from existing Substation and 3-Phase L.T extension from exist. 25 KVA 11/0.4 KV Sub Station at village Badhera under ESD, Haroli.Bid No (GED-05/2023-24) Name of scheme: Release of GSC in (op circle) Una
Sl. No. Item Description
1Erection Part of 3-Phase LT Line(T.S. No 180/2022-23)
2Erection of LT line. Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
3Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
4Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
5Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81( 80 mm2 ) ofNew 3-Ph. L.T Line complete in all respect.
6G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
7Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
8Erection Part of 1-Phase LT Line(T.S. No 164/2022-23)
9Erection of LT line. Digging of pit, erection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
10Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
11Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
12Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81( 80 mm2 ) Conductor ofNew 1-Ph. L.T Line complete in all respect.
13G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
14Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work withand Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
15Erection Part of 3-Phase LT Line(T.S. No 37/2023-24)
16Erection of LT line. Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
17Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
18Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.
19Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81( 80 mm2 ) Conductor ofNew 3-Ph. L.T Line complete in all respect.
20G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
21Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site).
22Supply Partof 3-Phase LT Line(T.S. No 180/2022-23)
237/3.81( 80 mm2 ) {Includes 3 conductor lengthsfor 3F,neutral conductor and Additional 1% (Sag, Jumpering and wastage}2.141 Kms.Supply by HPSEBL
24Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 60 m) 7 Nos. Supply by HPSEBL
25Prov. RCC Muff with Concrete filling
26Angle Iron (75x75x6) [length 1.50 mtr.+0.02 mtr.]
27Shackle Insulator (16 kN)
28D-Iron (U- Clamps) 28 Nos. Supply by HPSEBL
29Earth Knob
30LT Stay Set 8 Nos. Supply by HPSEBL
31Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
32Kit KatI.C.
33Full Clamp [2 Nos. for A.I + 1 No. for Stay Set]
34Earthing Set complete 7 Nos. Supply by HPSEBL
35Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
36Spool Tie
37Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
38Aluminium Paint
39Red Oxide
40Spiral PVC Spacer 14 Nos. Supply by HPSEBL
41Supply Part of 1-Phase LT Line (T.S. No 164/2022-23)
42AAAC 7/3.81( 80 mm2 ) Conductor {Includes 2 conductor lengths for 1F and Additional 1% (Sag, Jumpering and wastage} 1.697 Kms. Supply by HPSEBL
43Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 60 m) 12 Nos. Supply by HPSEBL
44RCC Muff with concreate filling
45Shackle Insulator (16 kN)
46D-Iron (U- Clamps) 24 Nos. Supply by HPSEBL
47Earth Knob
48LT Stay Set 10 Nos. Supply by HPSEBL
49Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
50Kit KatI.C.
51Earthing Set complete 12 Nos. Supply by HPSEBL
52Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
53Spool Tie
54Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
55Aluminium Paint
56Red Oxide
57Full Clamp for Stay Set
58Spiral PVC Spacer 12 Nos. Supply by HPSEBL
59Supply Partof 3-Phase LT Line (T.S. No 37/2023-24)
60AAAC 7/3.81( 80 mm2 ) Conductor {Includes 3 conductor lengthsfor 3F,neutral conductor and Additional 1% (Sag, Jumpering and wastage} 1.596 Kms. Supply by HPSEBL
61Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 60 m) 6 Nos. Supply by HPSEBL
62Prov. RCC Muff with Concrete filling
63Angle Iron (75x75x6) [length 1.50 mtr.+0.02 mtr.]
64Shackle Insulator (16 kN)
65D-Iron (U- Clamps) 24 Nos. Supply by HPSEBL
66Earth Knob
67LT Stay Set 3 Nos. Supply by HPSEBL
68Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
69Kit KatI.C.
70Full Clamp [2 Nos. for A.I + 1 No. for Stay Set]
71Earthing Set complete 6 Nos. Supply by HPSEBL
72Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
73Spool Tie
74Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
75Aluminium Paint
76Red Oxide
77Spiral PVC Spacer 12 Nos. Supply by HPSEBL

AI Tender Summary

OUR REF NO 38085490
AUTHORITY Government Departments
TENDER VALUE 3.06 Lakhs
LAST DATE 14-06-2023
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description Tender For Prov. & Erection Of 3-Phase L.T Extension To Improve The Voltage At Village Lower Kangar From Existing 100 Kva, 11 / 0.4 Kv Sub Station Kangar-Ist. And L.T. Extension To Improve Voltage / Lengthy Services At Village Kangar And Badhera From Existing Substation And 3-Phase L.T Extension From Exist. 25 Kva 11 / 0.4 Kv Sub Station At Village Badhera Under Esd, Haroli.Bid No ( Ged-05 / 2023-24 ) Name Of Scheme: Release Of Gsc In ( Op Circle ) Una
Basic Detail
Tender No GED-05/2023-24
Bidding Type Tender
Location
City gagret
State Himachal Pradesh
Key Dates
Publish Date 08 Jun 2023
Submission Date 14 Jun 2023
Open Date 15 Jun 2023
Finance
Tender Value 3.06 Lakhs
Tender Fee 590
EMD 3064
Exemption Not Available
Document List
aed49d29-e4a0-4a6c-9cc7-ad79f613eaa7.html
Bid.rar
BOQ_112012.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 08, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 14, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 15, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

aed49d29-e4a0-4a6c-9cc7-ad79f613eaa7.html

rar

Bid.rar

xls

BOQ_112012.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders