Tender For Prv. And Erection Of 3-Ph. Lt Extn. To Imp. Voltage At Vill. L/Kangar And Lt Extn. To Improve Voltage/Lengthy Services At Vill. Kangar And Badhera And 3-Ph Lt Extn. From Various Exist. Sub-Stn At Vill. Badhera Under Esd Haroli.
Tender Overview
Project Description
Tender For Prov. & Erection Of 3-Phase L.T Extension To Improve The Voltage At Village Lower Kangar From Existing 100 Kva, 11 / 0.4 Kv Sub Station Kangar-Ist. And L.T. Extension To Improve Voltage / Lengthy Services At Village Kangar And Badhera From Existing Substation And 3-Phase L.T Extension From Exist. 25 Kva 11 / 0.4 Kv Sub Station At Village Badhera Under Esd, Haroli.Bid No ( Ged-05 / 2023-24 ) Name Of Scheme: Release Of Gsc In ( Op Circle ) Una
BOQ
| Sl. No. | Item Description |
| 1 | Erection Part of 3-Phase LT Line(T.S. No 180/2022-23) |
| 2 | Erection of LT line. Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 3 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 4 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect. |
| 5 | Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81( 80 mm2 ) ofNew 3-Ph. L.T Line complete in all respect. |
| 6 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 7 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site). |
| 8 | Erection Part of 1-Phase LT Line(T.S. No 164/2022-23) |
| 9 | Erection of LT line. Digging of pit, erection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 10 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 11 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect. |
| 12 | Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81( 80 mm2 ) Conductor ofNew 1-Ph. L.T Line complete in all respect. |
| 13 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 14 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work withand Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site). |
| 15 | Erection Part of 3-Phase LT Line(T.S. No 37/2023-24) |
| 16 | Erection of LT line. Digging of pit, errection of S/T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 17 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 18 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect. |
| 19 | Laying of conductor:-Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.81( 80 mm2 ) Conductor ofNew 3-Ph. L.T Line complete in all respect. |
| 20 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 21 | Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work and Manual Carriage Of Material For Average Distance From Road To Site Of Work .(If required as per site). |
| 22 | Supply Partof 3-Phase LT Line(T.S. No 180/2022-23) |
| 23 | 7/3.81( 80 mm2 ) {Includes 3 conductor lengthsfor 3F,neutral conductor and Additional 1% (Sag, Jumpering and wastage}2.141 Kms.Supply by HPSEBL |
| 24 | Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 60 m) 7 Nos. Supply by HPSEBL |
| 25 | Prov. RCC Muff with Concrete filling |
| 26 | Angle Iron (75x75x6) [length 1.50 mtr.+0.02 mtr.] |
| 27 | Shackle Insulator (16 kN) |
| 28 | D-Iron (U- Clamps) 28 Nos. Supply by HPSEBL |
| 29 | Earth Knob |
| 30 | LT Stay Set 8 Nos. Supply by HPSEBL |
| 31 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 32 | Kit KatI.C. |
| 33 | Full Clamp [2 Nos. for A.I + 1 No. for Stay Set] |
| 34 | Earthing Set complete 7 Nos. Supply by HPSEBL |
| 35 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 36 | Spool Tie |
| 37 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
| 38 | Aluminium Paint |
| 39 | Red Oxide |
| 40 | Spiral PVC Spacer 14 Nos. Supply by HPSEBL |
| 41 | Supply Part of 1-Phase LT Line (T.S. No 164/2022-23) |
| 42 | AAAC 7/3.81( 80 mm2 ) Conductor {Includes 2 conductor lengths for 1F and Additional 1% (Sag, Jumpering and wastage} 1.697 Kms. Supply by HPSEBL |
| 43 | Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 60 m) 12 Nos. Supply by HPSEBL |
| 44 | RCC Muff with concreate filling |
| 45 | Shackle Insulator (16 kN) |
| 46 | D-Iron (U- Clamps) 24 Nos. Supply by HPSEBL |
| 47 | Earth Knob |
| 48 | LT Stay Set 10 Nos. Supply by HPSEBL |
| 49 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 50 | Kit KatI.C. |
| 51 | Earthing Set complete 12 Nos. Supply by HPSEBL |
| 52 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 53 | Spool Tie |
| 54 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
| 55 | Aluminium Paint |
| 56 | Red Oxide |
| 57 | Full Clamp for Stay Set |
| 58 | Spiral PVC Spacer 12 Nos. Supply by HPSEBL |
| 59 | Supply Partof 3-Phase LT Line (T.S. No 37/2023-24) |
| 60 | AAAC 7/3.81( 80 mm2 ) Conductor {Includes 3 conductor lengthsfor 3F,neutral conductor and Additional 1% (Sag, Jumpering and wastage} 1.596 Kms. Supply by HPSEBL |
| 61 | Steel Tubular Poles (8 m, Working Load > 200 kgf/m²) (with Ruling Span 60 m) 6 Nos. Supply by HPSEBL |
| 62 | Prov. RCC Muff with Concrete filling |
| 63 | Angle Iron (75x75x6) [length 1.50 mtr.+0.02 mtr.] |
| 64 | Shackle Insulator (16 kN) |
| 65 | D-Iron (U- Clamps) 24 Nos. Supply by HPSEBL |
| 66 | Earth Knob |
| 67 | LT Stay Set 3 Nos. Supply by HPSEBL |
| 68 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 69 | Kit KatI.C. |
| 70 | Full Clamp [2 Nos. for A.I + 1 No. for Stay Set] |
| 71 | Earthing Set complete 6 Nos. Supply by HPSEBL |
| 72 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 73 | Spool Tie |
| 74 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
| 75 | Aluminium Paint |
| 76 | Red Oxide |
| 77 | Spiral PVC Spacer 12 Nos. Supply by HPSEBL |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender