Tender For Construction Of Panchayat Community Centre Building For Gram Panchayat Thural Dev. Block Sullah Distt. Kangra (Hp).
Tender Value
21.14 Lakhs
Estimated cost
Bid Submission
15 Jun 2023
0 days left
EMD
42000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
bhawarna → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Panchayat Community Centre Building For Gram Panchayat Thural Dev. Block Sullah Distt. Kangra (Hp). Construction Of Structural Work Of Ground Floor.
BOQ
| Sl. No. | Item Description |
| 1 | Excavationinfoundation,trenchesetceterainearthworkinvolvingallclassificationofsoilsuchaspickwork,pick jumper work, blasting work, soft or hard rocks including chiseling/wedging out of rocks where blasting work is prohibited or any other mixed variety of intermediate soil, dewatering and removal of slush if arrisen during course of construction and lifts upto all heights including stacking the excavated soil not more than three meters clear from the edge of the excavation and then returning the stacked soil in 15 cm (fifteen centimeters) thick layers when required into plinths, sides of foundation etcetera consolidating each deposited layer by ramming and watering and then disposing of all surplus excavation earth within all leads,lifts by any mode of transportation and other incidental, as per the direction and entire satisfaction of Engineer-in-Charge. Any loss to the private and public property during course of construction shall be absolute responsibility of the contractor. Rate inclusive royalty, malkana, toll tax, GST andother taxes imposed by the government. |
| 2 | Filling in plinth with sand under floor including watering, ramming, consolidating and dressing complete as per PWD specification. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Any loss to the private and public property during course of construction shall be absolute responsibility of the contractor. Rate inclusive royalty, malkana, toll tax, GST and any other taxes imposed by the government. |
| 3 | Stone filling tightly dry hand packed under flooring including ramming and consolidation complete as per the direction of Engineer-in-Charge includingcarriage of materials with in allleads, lifts and other incidental . The rate is including of octroi, royality, Malkana, toll tax , sales tax or other taxes imposed by the government. |
| 4 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in foundation,. Footings bases of columns and mass concrete. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 5 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in columns, pillars , posts and struts, square, rectangular, polygonal in plain in all floor level. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 6 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in beams cantilevers, girders lintels, sides, and soffits of beams haunchings, cantilevers bressumers and lintels upto all depths in all floor. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 7 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits ofsuspended floors roofs, landingsand the like floor etc. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 8 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in stairs cases with slopping or stepped soffits, excluding, landing in all floor. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 9 | Providing form work with steel plates of 3.15mm (three decimal one five milimeter)thick, welded with angle iron in frames of 30x30x5mm (thirty into thirty into five milimeter)so as to give a fair finish including centring, shuttering strutting and propping etc, with wooden battens and ballies for all heights/depths of propping and centring below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in edges of slabs and breaks in floors and walls upto any width. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 10 | Random rubble masonry with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (one cement isto six sand isto Twelve graded stone aggregate) 20 mm (Twenty millimetre nominal size) at plinth level in cement mortar 1:6 (one cement isto six sand ). The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate is inclusive of toll tax, GST and any other taxes imposed by the government. |
| 11 | Providing and laying cement concrete 1:4:8 (One Cement isto Four Sand isto eight) graded stone aggregate 40mm (Forty millimetre) nominal size for haunching of pipes of the 150 mm ( One hundred fifty millimetre) internal diameters, necessary form work and curing complete within all leads, lifts of materials and other incidentals, as per the direction and entire satisfaction of Engineer-in-Charge. Rate is inclusive of sale tax, toll tax, GST and any other taxes imposed by the government. |
| 12 | Providing and laying cement concrete work M20 mix design to obtain the minimum compressive strength 20N/mm2 ( twenty newton per square millileter) to obtain the minimum compressive strength not less than 330 kg/ cum with mechanically mixed and vibrated curing complete excluding cost of form work and reinforcement for reinforced concrete work in foundation footing, base of colums, and the like mass cooncrete as per approved specification, drawing and design including entire carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-in-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 13 | Providing and laying cement concrete work M-20 design mix to obtain the minimum compresive strength of 20N/mm2( twenty newton per square millimetre) and minimum cement content not less than 320 kg/cubic meter mechanically mixed and vibrated includingcuring complete as per PWD specification, drawing and design excluding cost of form work and reinforcement for reinforced concrete work incoulmn, pillers posts and struts upto any floor level. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 14 | Providing and laying cement concrete workM-20 design mix to obtain the minimum compresive strength 20N/mm2 (20 newton per square millimeter) and minimum cement content not less than 320 kg/cubic meter and curing complete and mechanically mixed and vibrated as per approved specification, drawing and design, excluding cost of form work and reinforcement for reinforced concrete work in suspended floor roofs, landing and shelves and their supports balconies, beams, girder, bressumers and cantiliver upto any floor level. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge.Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 15 | Providing and laying cement concrete grade M-25 (M-Twenty five) design mix with minimum compressive strength 25N/mm2 with cement contents not less than 400 Kg (Four hundred kilogram) (Four hundredkilogram per Cubicmetre)mechanically mixed and vibrated including curing complete as per PWD specification, drawing and design excluding the cost of form work and reinforcement for cement concrete workinstair cases (except spiral stair cases) excluding landings, but including preparing of top surfaces and finishing of nosing upto all floor levels. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-In-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
| 16 | Providing and laying tor steel of TISCO, SAIL reinforcement for reinforced cement concrete work including bending, binding and placing in position complete in all respects as per approved drawing, design, and specification in all floor levels including the cost of binding wire and cost of dewatering if arrisen during placement of reinforcement as per PWD specification and approved, drawing design. The rates are inclusive cost and carriage of materials with in all leads, lifts and other incidentals, as per the direction and entire satisfaction of Engineer-in-Charge. Rate inclusive toll tax, GST and any other taxes imposed by the government. |
AI Tender Summary
Tender Timeline
Jun 08, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJun 15, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 15, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender