| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light bla |
| 2 | Supplying and filling in foundation andbasement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification. |
| 3 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour chargesetc., complete as per s |
| 4 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting us |
| 5 | A)Without shuttering |
| 6 | B)With shuttering |
| 7 | Plain Cement Concrete 1:2:4using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour chargesetc., complete as per standard specification. |
| 8 | Supply and fixing RCC Pre Cast slab 50mm thick in CC 1:2:4 (one cement, two sand and four aggregates) using 20mm HBGS metal excluding cost of Reinforcement grill in position including moulding curing and finishing etc, complete as per standard specificati |
| 9 | Suppling and fabricating and placing in position MS(or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors. |
| 10 | Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio |
| 11 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour c |
| 12 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand))20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S. |