Tender For Construction Works Of (A) Dhamatoli Changi Motor Road And (B) Construction Works Of Koti Jakh Dakwangaon Motor Road Transferred From Pmgsy To Pwd After Completion Of Defect Liability Period In Tehsil Bhilagana District Tehri Garhwal. (By
Tender Overview
Project Description
Construction Works Of (A) Dhamatoli Changi Motor Road And (B) Construction Works Of Koti Jakh Dakwangaon Motor Road Transferred From Pmgsy To Pwd After Completion Of Defect Liability Period In Tehsil Bhilagana District Tehri Garhwal. (By P.C. Work)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Jun-2023 | Date and Time extension Ltr | Date | 23-Jun-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Dhamatoli Changi Motor Road |
| 2 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required densityGrading 1 as per Technical Specification Clause 405.[Grading of no-3] (22.4 - 53 mm size). |
| 3 | Tack coat using VG-10 grade bitumen @0.35kg/sqm,over normal bituminous surfaces |
| 4 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade / modified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type Aas per Technical Specification Clause 508. |
| 5 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type Bas per Technical Specification Clause 510 |
| 6 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) |
| 7 | Construction of Embankment with Material Obtained from RoadwayCutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Both Side |
| 8 | Excavation in foundationfor retaining & breast walls in all types of soil and rocks including lead lift and disposal of surplus material as per direction of engineer in charge |
| 9 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 10 | Random Rubble Stone Masonry laid dry,in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) |
| 11 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 |
| 12 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). |
| 13 | Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. (average lead 25 m) as per Technical Specification Clause 307. |
| 14 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 1:3:6(Hand mixing) |
| 15 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 |
| 16 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:5) |
| 17 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M25 |
| 18 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 19 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) |
| 20 | Construction Of Parapets Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications |
| 21 | White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 |
| 22 | Cleaning of fully choked scupper and catchpit complete as directed by the Engineer-in-charge. |
| 23 | Trimming of grass and weeds from theshoulders/berms and disposing off the same to suitable locations as per Direction Of Engineer incharge including supply of all material, labour, T&P etc. required for proper completion of the work |
| 24 | Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side |
| 25 | Koti Jakh dakwangaon Motor Road |
| 26 | WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405.[Grading of no-3] (22.4 - 53 mm size). |
| 27 | Tack coat using VG-10 grade bitumen @0.35kg/sqm,over normal bituminous surfaces |
| 28 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade / modified bitumen) BinderProviding, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 11.2mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type Aas per Technical Specification Clause 508. |
| 29 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type Bas per Technical Specification Clause 510 |
| 30 | Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications) |
| 31 | Construction of Embankment with Material Obtained from RoadwayCutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Both Side |
| 32 | Excavation in foundationfor retaining & breast walls in all types of soil and rocks including lead lift and disposal of surplus material as per direction of engineer in charge |
| 33 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls,retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 34 | Random Rubble Stone Masonry laid dry,in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) |
| 35 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 |
| 36 | Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. (average lead 25 m) as per Technical Specification Clause 307. |
| 37 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 1:3:6(Hand mixing) |
| 38 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 |
| 39 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:5) |
| 40 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M25 |
| 41 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 ( RCCM 30) |
| 42 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 |
| 43 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) |
| 44 | Construction Of Parapets Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications |
| 45 | White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915 |
| 46 | Cleaning of fully choked scupper and catchpit complete as directed by the Engineer-in-charge. |
| 47 | Trimming of grass and weeds from theshoulders/berms and disposing off the same to suitable locations as per Direction Of Engineer incharge including supply of all material, labour, T&P etc. required for proper completion of the work |
| 48 | Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender