| 1 | Rates forSupplying ,carting , laying and jointing of G.I pipe (M), Source work ,Reservoir& Providing Functional House Hold Tap Connection (FHTC) for appropriate & qualitative drinking water for each house hold and all other appurtenantworks etc complete KANDA GOV water Supply scheme Under Jahirikhal blocks in District Pauri. All rates shall be included all types of taxes and G.S.T. It is necessary the contractor will start the work from source to Distribution System. If any dispute in the source than other workwill not done by the contractor |
| 2 | Diversion of Gadhera including supply of all materials, labour, T&P etc. required for proper completion of work (as per detail attached) |
| 3 | Construction of Boulded Filled Gallery 4m wide including inlet chamber and supply of all materials, labour, T&P etc. required for proper completion of work (as per type design) |
| 4 | Construction ofExtra Cross wall . including supply of all materials, labour, T&P etc. required for proper completion of work (as per type design) |
| 5 | Execution, testing & commissioning of water treatment plant (0.10 mld) construction of floculator unit, setteling tank, R.C.C Post setteling tank, Rapid gravitysand filter unit, alum dozing cum mixing chamber of specifice size intak chamber, Back washing tank, fixing of blower compressuer etc all necessary machanicalequipement as per drawing and designincluding excavition P.C.C 1:2:4 (as per detail attached) |
| 6 | Supply of all materials, labour and T & P etc. and construction of R.C.C. Sump / Clear Water Reservoir of following Capacity in K.L. as perdesign and drawing including fixing of pipes and fittings including cartage of materials etc. completeClear Water Sump 55 KL Capacity at MPS |
| 7 | Clear Water Sump 50 KL Capacity at IPS |
| 8 | RCC CWR 3.0 KL |
| 9 | RCC CWR 4.0 KL |
| 10 | RCC CWR 7.5 KL |
| 11 | Supply and fixing ofPVC tank type chlorinator of 50 Liter capacity at top of all service raservoirs. |
| 12 | Providing of all materials, Carting from site store to site of work,Lowering into trenches with true to alignment, Laying ofMS ERW YST 210, Jointingby electric welding process with proper grade ofeletrodes suitable for jointing of water supply pipe lines (Ador,L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete in repairFrom MPS to I.P.S. MSERW Pipe 80 mm Dia, 4.8 mm Thickness |
| 13 | From IPSto TOP CWR MSERW Pipe 65 mm Dia, 4.8 mm Thickness |
| 14 | Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I. medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.15 mm dia (For FHTC) |
| 15 | 20 mm dia |
| 16 | 25 mm dia |
| 17 | 32 mm dia |
| 18 | 40 mm dia |
| 19 | 80 mm dia from BFG to MPS |
| 20 | Excavation of earth for pipeline trench in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 95% excavation will be in soilmixed with shingle, bajari and boulders and rest 5% will be in medium rock (trench 0.60 m wide and 0.60 m deep)Soil Mixed with boulder and bajari |
| 21 | Medium Rock |
| 22 | Supply & fixing of following sizes of valves including carting the same up to side of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respectReflux Valve80 mm dia (CS D/F Class 300 ASA) |
| 23 | Reflux Valve65 mm dia (CS D/F Class 300 ASA) |
| 24 | C.I. Air valve (Double Acting) 50mm |
| 25 | Supply of all materials, labour, T & P etc. and Construction of size Air valve/Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete (1.2x1.2x1.2) |
| 26 | Supply of all materials, labour, T & P etc. and Construction ofR.C.C Anchor Block (size 0.75 m x 0.75 m x 0.75 m) as per type design complete |
| 27 | Making 2 M wide Briddle path forrising main including hill side cutting and coolie walling of all materials, labour, T & P etc. |
| 28 | Painting of MSERW Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) (Dia of pipe in mm)80 mm dia |
| 29 | 65 mm dia |
| 30 | Supply and fixing of the following fittings including cartage of materials, labour, T&P etc. completeGate/Wheel Valve ( Brass )/G.M.Valve20 mm dia |
| 31 | 25 mm dia |
| 32 | 32 mm dia |
| 33 | 40 mm dia |
| 34 | 50 mm dia |
| 35 | 80 mm dia |
| 36 | Supply of all materials, labour, T&P etc. and construction of0.9 m x 0.9 m x 0.9 m size Gate Valve chamber with FPS bricks |
| 37 | Providing and fixing brass bib cock of approved quality :15 mm nominal bore |
| 38 | Providing and fixing brass ferrule with C.I. mouth cover including boring and tapping the main15 mm nominal bore |
| 39 | C.I.Mouth, brass ferrule 15 mm dia |
| 40 | Providing G.I.Tee (equal) |
| 41 | Providing G.I.Union(15 mm dia) |
| 42 | C.P.Brass extension Nipple |
| 43 | Providing G.I.elbow (15 mm dia) |
| 44 | Excavation for foundation in Soil mixed with boulders for protection work |
| 45 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P etc. complete in Intake work, along the Rising main, Supply/feeder main, distribution system, storage reservior etc |
| 46 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P etc. completein Intake work, along the Rising main, Supply/feeder main, distribution system, storage reservior etc |
| 47 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wireconforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in-charge. (As per PWD Uttarakhand specifications) |
| 48 | PCC 1:2:4 including supply of all materials, labour, T&P etc. complete |
| 49 | Cartage of Material from foot hill Kotdwar to Site Store at Road head by truck in Pucca & Kachcha Road & also including by head load & stacking of materials(as per annexure) |
| 50 | Supply of all materials, labour and T & P etc. and construction of Staff quarter for Chaukidar as per type design and drawing including water supply work and necessary fitting (as per annexure)AtMPS |
| 51 | Repair of existing Staff Quarter Type- Ist at IPS including supply of all materials, labour and T & P etc (as per annexure) |
| 52 | Supply of all materials, labour and T & P etc. and construction of Pump House as per type designAtMPS (size 8.0 x 7.0 x 5.0) |
| 53 | Repair of existing pump house 6mx5m in size at IPS including supply of all materials, labour and T & P etc. (as per annexure) |
| 54 | Provision of 1.5 m high Boundary Wall in brick masonry including supply of all materials, labour, T&P etc. complete (as per annexure)At MPS campus |
| 55 | Provision of Barbed Wire Fencing through angle iron posts around the water works site (as per annexure)At MPS campus |
| 56 | Provision of Iron Gate with Pillars of following sizes complete (3.6 m wide) |
| 57 | E&M WORKSITC of electric driven multi-stage horizontal clear water centrifugal pumps withbronze impellers, stainless steel shaft cable to deliver clear water 250 LPM discharge at 300 Mt. head 2900 r.p.m. at MPS |
| 58 | Supply of M.S fabricated base plate and coupling for above pumps and motors. At MPS & IPS |
| 59 | SITC of horizontal shaft TEFC electric motors suitable to run on 415 +-10% volts, 3 phase, 50 Hz A.C supply and suitable motor, 2900 r.p.m. at MPS & IPS |
| 60 | SITC of electric driven multi-stage horizontalclear water centrifugal pumps withbronze impellers, stainless steel shaft cable to deliver clear water 150 LPM discharge at 310 Mt. head 2900 r.p.m. at IPS |
| 61 | Supply of MS sheet fabricated, dust and vermin proof cubical floor mounting type control panelmade out from 14 SWG MS sheet, copper bush bars, having 1 no. incoming and 2 nos. outgoing at MPS & IPS (as per annexure) |
| 62 | Supply of fully automatic auto transformer type starter suitable for above motors having airbreak contactors, electroni timer, thermal over load relay, adequate size Aluminum bus bars, copper wound auto transformer and dulywired by copper leads/ wire, lugs, ON/OFF andreset switches and indicators etc. completein all respects. at MPS & IPS |
| 63 | Supply of power wiring material such as 25 sq.m.m 3 Core copper conductor cable XLPE insulated cable for power wiring between the control panel and starter to motor. (FOR TWO RUNS) |
| 64 | Supply of power wiring material such as 70 sq.mm. 3 and half Core aluminum onductor cable XLPE insulated, cable for power wiring between power transformer and contrl panel |
| 65 | Jointing material for wiring connection including lugs, thimble, insulation tapes, nutt bolts etc. |
| 66 | Doubleloop earthing of all electrical equipmentswith supply of material such as G.I earth strip, earth plate, GI funnel, charcoal, Salt watering pipe etc. including digging of pits and refilling complete |
| 67 | Supplyof main piping spair and valves (as per annexure) |
| 68 | Supplyof main piping spair and valves (as per annexure) |
| 69 | Supply of a set of pressure gauges (0-56) kg/cm^2 complete with control cocks and nipples including all necessary fitting etc. |
| 70 | Supply of Tools (as per annexure) |
| 71 | Rubber insulationsheet 2.0mx0.1mx25mm thick |
| 72 | Installation, commissioning and testing work of entire equipment including pumps, motors, control panel, starter, and power wiring etc, |
| 73 | Provision of Sign Board |
| 74 | Provision of Material Testing |