| 1 | Earthwork excavation in all classes soils and subsoils except hard rock requiring blasting with initial lead and lift as initial lead of 10.0 m and lift 0f 2.00 m including re-filling the sides of foundation in layer of 15cm.thick watering ramming depositing the surplus earth in the premises as directed by the departmental officers etc., complete complying with standard specification. |
| 2 | Supplying and filling of clean river sandfrom approved quarry including cost of convayance of all materials to working site and all labour charge for filling, watering, ramming and consolidation by the direction of departmental engineers instruction etc, complete and as per standard specification. |
| 3 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 4 | Refilling the excavated earth for foundation including cost of all materials and all labours charges etc.,complete as per standard specifications. |
| 5 | Supplying and errection of centring to the sides and soffits including strutting arrangements upto 3.00m height of all pain surface for all RCC works such as beams, slabs, staircase, lintel and column in proper position by the direction of departmental engineers instruction etc, complete and as per standard specification. |
| 6 | for plinth beam |
| 7 | for plaine surface |
| 8 | For column |
| 9 | Supplying, and fabrication of MS/RTS bar including cost of convayance of all materials to working siteand all labour charge for cutting, bending, strighting and placing inproper positionand tying with binding wire by the direction of departmental engineers instruction etc, complete and as per standard specification. |
| 10 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCCitemsof works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and alsoincluding fixingfan clamps and fixtures in rccworkswherever necessary as directed by departmentalofficer etc., complete. |
| 11 | Brick work in following Cement Mortar using Fly Ash Bricks of 230 x 110 x 70mm size conforming to IS: 12894-1989 Class designation not less 50 kg./ sq.cm. average compressive strength in cement mortar 1:5 for load bearing structures for foundation and basement and for superstructure including curing, etc., complete complying with standard specifiction. |
| 12 | for super structure |
| 13 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. |
| 14 | Plastering with cement mortar 1:3,10 mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) |
| 15 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) |
| 16 | R.C.C.Jolly by a new of followingsize in R.C.C. 1:1.5:3 using 20mm gauge hard broken granite stone jelly and river sand excluding cost of reinforcement but includingcharges,fabrication chargescuring neat finishing and labour charges for fixing the jolly in position with standard spefication |
| 17 | Provision for pipe connection arrangement for inlet, outlet, scour and overflow etc.., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading , fixing and painting of GI pipe with two coats of approved quality enamel paint etc.., complete as detailed below. |
| 18 | 65mm $ GI pipes for inlet connection |
| 19 | 65mm $ GI pipes for over flow & rain water harvesting pipe |
| 20 | 63 HDPE Pipe Pn8 |
| 21 | 40mm GI Pipe |
| 22 | 40mm GI Elbow |
| 23 | 40mm GI Coupling |
| 24 | 40mm GI Union |
| 25 | 4omm GI Bend |
| 26 | 50mm GI Pipe |
| 27 | 50mm GI Union |
| 28 | 50mm GM Gate vale |
| 29 | 20MM GI TNT ISIPipe |
| 30 | 20mm dia GI coupling |
| 31 | 20mm dia GI Elbow |
| 32 | 20mm dia GI Tee |
| 33 | 20mm dia GI Bend |
| 34 | 20mm dia GI Hex Nipple |
| 35 | 20mm GM Ball valve |
| 36 | 40MM Non Return valve |
| 37 | Bore clamp set |
| 38 | bore well cover in MS |
| 39 | Solvent cement |
| 40 | Laying and jointing of PVC pipe with necessary PVC specials with proper and alignment as directed by departmental officers |
| 41 | 20MM GI TNT ISIPipe |
| 42 | 63mmHDPE PIpe |
| 43 | 50mm GI Pipe |
| 44 | 40mm GI Pipe |
| 45 | Refilling the foundation with excavated earth including consolidation as directed by the Municipal officers |
| 46 | Wiring with 2 x 1.5sq.mm(22/0.3) PVC insulated unsheathed Sc.Cu.conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with TW switch box with 5A.F.T switch in flush with wall, covered with hylem sheet of 3mm thick with painting of suitable colour for open PVC light point/fan point by the direction of departmental engineers instruction etc, complete and as per standard specification. (SD.NO.21) |
| 47 | Supply and fixing of single box type of 40W 4\"-0\" flu.fitting complete with copper chock and condenser with TW round block on wall or ceiling with flu.tube with PVC unsheathed copper leads from terminals to the fittingby the direction of departmental engineers instruction etc, complete and as per standard specification. (SD.NO.88) |
| 48 | Plastering with cement mortar (1:4) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) |
| 49 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:1.5:3 (one cement, one an dhalf sand and three aggregates), using following HBGS jelly incuding cost of reinforcement steel, cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. |
| 50 | Painting 2 coats with approved cement paint over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete. |
| 51 | Painting two coat for new iron work using best quality ready mixed enamel paintof approved colour and quality by thedepartmental engineers including cost and conveyance of all materials and all labour charge etc, complete by the direction of departmental engineers instruction etc, complete and as per standard specification. |