Survey, Design, Construction, Testing, Commissioning, Trial Run And Thereafter O&M For 13 Years Of Chlorine Contact Tank ( Cct ) For Disinfection Of Treated Sewageat Outlet Of 4 Mld Stp, Pagal Baba Mandir, Vrindavan, Dist Mathura. Under State Sector- 1 Chlorination Arrangement ( Civil ) 2 Chlorine Contact Tank Excavation Of Soft Soil Lift Upto 1.5 Mtr And Lead Upto 30 Mtr.Including Filling Watering And Ramming Of Excavated Earth Into The Trench And Removal And Disposal Of Surplus Earth As Directed By Eic Upto Distance Of 5.00 Km. From The Trench Including Supply Of All Labours And T&P Etc. Required For The Proper Completion Of Work 3 0.00-1.50 M B.G.L. 4 1.50 - 3.00 M B.G.L. 5 3.00 - 4.50 M B.G.L. 6 Cement Concrete 1:2:4 In Cement Coarse Sand & Stone Grit 12 To 20 Mm Guage In Foundation And Floors Including Supply Of All Material Labour And T&P Etc. Required For Proper Completion Of Work As Per Proposed Drawing And As Per Direction Of E / I 7 1.50 - 3.00 M B.G.L. 8 3.00 - 4.50 M B.G.L. 9 Reinforced Cement Concrete M30 With Src Cement, Coarse Sand And 20Mm Stone Grit In Foundation Footing, Vertical Wall, Slab Etc. Excluding Supply Of Reinforcement And Its Bending But Including Its Haunching And Toe Wall At Startingas Per Proposed Drawingfixing, Bindingthesamewith0.50Mm Thickbindingwire ( Tobesuppliedbythe Contractor ) And Epoxy Paint Inside Of Rcc Verticle Wall Including Of All Materials, Labour, Andt&Petc.Requiredfortheproper Completion Of Work As Per Direction Of E / I. ( Raft, Verticle Wall, Outer Wall Of Cct, Baffel Wall Of Cct, Plateform And Outlet Effulent Channel Etc. ) 10 Mild Steel Or Iron Work In Plane Work Such As In R.C.C Work ( When Not Included In Over All Rates ) Wrought To The Required Shape As Necessary Including Bending For The Completion Of Work And Including Supply Of All Materials, Labours, T&P Etc. Complete. 11 Supply & Fixing Of Footrest, Tiling Work As Per Site Condition In Cct 12 Supply & Fixing Of S.S. Hand Railing 13 Chlorination Room & Toner Yard ( As Per Design & Drawing ) 14 Chlorination Room & Toner Yard As Per Design & Drawing ( Rcc In Frame Structure, Kota Stone Flooring, Aluminium Door And Windows, Nutrailization Pit Including Water Supply Arrangement, Apex Painting And Fixing Of Eot Arrangement Etc.Requiredfortheproper Completion Of Work As Per Direction Of E / I. ) 15 Construction Of C.C.Approach Road Mnumum 150Mm Thickness Including Pcc For Cct, Chlorination Room, Toner Yard And Effluent Channel Etc. As Per Site Condition 16 Site Development ( Horticulture Works, Barbed Wire Fencing Etc. ) 17 E & M Work 18 Design, Supply, Installation, Testing & Commissioning Of Following Equipment / Material With All Required T&P, Material, Labour Etc. Complete At 04 Mld Stp Vrindavan Site As Specified In Bid Document: 19 Chlorinators:Vacuum Feed Gas Chlorinator ( 5Kg / Hr ) With All Assessories Including Supply, Installation Of Trunnion Roller Support, Auxillary Container Valve With Yoke, Flexible Copper Connector Tube, Manifold Valve, 02 Tonner Manifold Pipes, Chlorine Pressure Gauge, Isolation Valve, Gas Filter, 20 Nb Chlorine Gas Pipeline With Fitting, Pressure Reducing Valve, Residual Chlorine Analyzer, 02 Nos. Chlorine Leak Detector With Single Sensor, 02 Nos. Dol / Star-Delta Starter, 02 Nos. Chlorinator With Required Accessories Like Pressure Gauge With Isolation Valve, Vaccume Regulator, Rotameter, Flow Control Valve, Vaccume Relief Valve, Vaccume Gauge, Dain Valve, Injector, Diffuser, Lifting Beam, Load Indicator, 32 Nb Pvc Valve On Injector Inlet & Outlet, 32 Od Upvc Pipe For Chlorine Solution, 40 Nb Mserw Pipe For Pump Suction & Delivery, 40 Nb Gm Gate Valve On Pump Suction & Delivery, 40 Nb Gm Y Type Stainer On Pump Suction, 32 Nb Gm Check Valve On Pump Delivery, Pressure Gauge With Isolated Valve On Pump Delivery And Chlorine Booster Pump With Suitable Motor For 60 Mwc / Required Head And 4 M3 / Hr Capacity Complete In All Respect As Per Specification And The Direction Of The Engineer. ( 1W+1S ) And Packing, Forwarding, Freight And Installation ( Including Required Civil Foundation Etc. ) Charges 20 Filled Chlorine Tonner As Per Specifications With Rollers Complete In All Respect As Per The Direction Of Engineer And Packing, Forwarding, Freight And Installation ( Including Required Civil Foundation Etc. ) Charges 21 Safety Equipment Such As Canister Gas Mask, Air Breathing Apparatus, Emergency Repair Kit-B, Safety Shower And Eye Wash, Residual Chlorine Test Kit, Ammonia Torch, Fire Extinguisher, Insulating Mat, Wind Sock Etc. 22 Cabling, Earthing, Lighting Arrangement And Other Miscellaneous Items Etc. 23 Eot Hoist Of 3 Tonn, 5 M Lift With Electric Trolley, Girder, Beam Etc. Complete 24 Caustic Soda For Neutralization Pit 25 15 Kva, 415V, 3 Phase, Diesel Generating Set With 1500 Rpm Diesel Engine, Alternator, Control Panel ( Plc Compatible ) , Fuel Tank, Canopy, Battery & Battaery Charger Etc.Complete In All Respect 26 Power Cable Of 10 Sq. Mm Size Of 1100 Volt Grade 3.5 Core Armoured Xlpe Sheathed Aluminium Conductor From Alternator Of Dgs To Synchronization Panel To Lt Panel With End Termination / Joints Of The Cable 27 Double Earthing Of Dg Set And All Electrical Equipment As Per Is And Ier 28 12 Mm Thick Electric Resistance Rubber Sheet 29 Trial Months For 3 Months Of Entire Chlorination System 30 O&M Works For 15 Years 31 Operation And Maintenance Of All Civil, Mechanical, Electrical & Instrumentation Works Chlorinating System & Dg Set ( Including Required Manpower, Spares, Refiling Of Chlorine Tonner, Repair, Replacements Etc. Complete. )