| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge; Ordinary rock. For 13 Nos FDLs which are located up to 1.00 Km from road head |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge; Ordinary rock. For 11 Nos FDLs which are located above 1.00 Km up to 4.00 Km from road head |
| 3 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m; All kinds of soil. For 13 Nos FDLs which are located up to 1.00 Km from road head |
| 4 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m; All kinds of soil. For 11 Nos FDLs which are located above 1.00 Km up to 4.00 Km from road head |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 7 Nos FDLs which are located up to 0.20 Km from road head |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 6 Nos FDLs which are located above 0.20 Km up to 1.00 Km from road head |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 5 Nos FDLs which are located above 1.00 Km up to 2.50 Km from road head |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for; Foundations, footings, bases of columns, etc. for mass concrete. For 7 Nos FDLs which are located up to 0.20 Km from road head |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for; Foundations, footings, bases of columns, etc. for mass concrete. For 6 Nos FDLs which are located above 0.20 Km up to 1.00 Km from road head |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for; Foundations, footings, bases of columns, etc. for mass concrete. For 5 Nos FDLs which are located above 1.00 Km up to 2.50 Km from road head |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for; Foundations, footings, bases of columns, etc. for mass concrete. For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 7 Nos FDLs which are located up to 0.20 Km from road head |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 6 Nos FDLs which are located above 0.20 Km up to 1.00 Km from road head |
| 15 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 5 Nos FDLs which are located above 1.00 Km up to 2.50 Km from road head |
| 16 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head |