| 1 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., includingall incidental charges etc., complete as per standard specification . for FoundationsSS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9 |
| 2 | Supply filling of Stone Dust in layer of not more than 15 cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyence of sand to Site and all labour charges and all other incidential charges etc,. complete as per Standard Specification TNDSS NO. 24 &25 NBC Part VI (S2) 8 |
| 3 | Plain Cement concrete of mix 1:4:8 (One cement four M-sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.TNDSS NO.28 V,VI S25 |
| 4 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A |
| 5 | Without Strutting |
| 6 | With Strutting |
| 7 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc.Complete with std.Specifications. TNDSS NO: 30 V, VI (S3), VII-3. |
| 8 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complyingwith standard specifications and as directed by the deparmental engineers. TNBP No:30.- |
| 9 | Plain Cement Concrete 1:3:6 (One Cement three M-sand and six aggregate) using 20mm hard broken granite stone jelly for foundation includingdewatering and wherever necessarylaying in layers of 15cm thick and consolidated and curing complying with standard specification and as directed by the departmental officers etc., complete.- TNDSS NO.28 V,VI S25 |
| 10 | Earth work excavation deploying earth moving machineries for desilting pond having a width upto 2.50m and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete complying with standard specification and as directed by the Departmental Engineer. As per PWD Shedule of Rates |