| 1 | Dismanling existing damaged C-Croad as specified for the departmental engineers includig cost of conveyance etc.complete |
| 2 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by thedepartmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 3 | Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50minterval and including removing the sheet piles after the pipelines are 302laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths (i) 0-3mts.,(ii) 0-4mts.,(iii) 0-5mts., (iv) 0-6mts.,(v) 0-7mts. and (vi) 0-8mts |
| 4 | Supplying and Erecting ofshuttering for sides and so fits including necessary supports and shuttering to the required height for RCC works with standard Specifications etc. completecomplete |
| 5 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 6 | Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
| 7 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 8 | Supply and fixing of 150mm dia D.I pipe k9 using in water source including all material and labour cost etc.Complete as per standard specification. |
| 9 | Lowering of D.I Pipes and specials in the trenches and laying to proper grade andalignment and as directed by the TWAD Officers.150mm D.I pipe |
| 10 | Baling out of motorfor UGSS pumping water outlet using 125KVA jenset with 15HP nonclock swepage type motor including cost of delivery 110mm HDPE pipe, fuel charges labour charges and transport charges etc, Complete asper standard specification. |
| 11 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 12 | Providing and laying in position READY MIX CONCRETE M20 grade using ordinary portland cement with a minimum cement content of 430kg/cum with water cement ratio not exceeding 0.45 including the use of plasticizer of approved make & disage of required grade at all locations and levels using 20mm stone jelly |
| 13 | For GST 18% |