Name of work: Construction of Strom Water Drain inLakshmi Venkedeshwara Nagar @ Ward No.09 in KarumathampattiMunicipality
Sl. No.
Item Description
1
Earthwork open excavation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and depositing the excavated earth within the compound in places shown by departmental officers with an initial lead of 10m and lift of 2m and clearing and leveling etc.complete complying with standard specification. For Drain work
2
Cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40 mm ISS metal including mixing, laying, consolidating curring cost and conveyance of all materials to site and all labour charges etc., complete as per standard speicification
3
Supplying and erecting steel centering including necessary supports for plane surfaces in foundation and basement for reinforced cement concrete works such as column footings, plinth beam, grade beam, stair case steps, bed blocks etc. which require only normal strutting using M.S. sheets of size 90cm x60cm BG 10 gauge of stiffened with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak joists of size 10 x 6.50cm spaced at about 90 cm centre to centre and supported by the casurina props of 10cm to 13cm dia spaced at 75cm centreto centre atsuitableintervals etc. complyingwithstandardspecification.
4
Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20 mm ISS metal including mixing, laying, consolidating, curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
5
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two m.sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panellingwherever necessary and as directed by the departmental officers) 25mm thick
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.