| 1 | Earthwork open excavation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and depositing the excavated earth within the compound in places shown by departmental officers with an initial lead of 10m and lift of 2m and clearing and leveling etc. complete complying with standard specification. |
| 2 | Cement concrete 1:4:8 mix (One cement four Crushed Stone Sand and eight aggregate) using 40 mm ISS metal including mixing, laying, consolidating curring cost and conveyance of all materials to site and all labour charges etc., complete as per standard speicification |
| 3 | Brick work in cement mortar 1:5 mix using(One cement and five Crushed Stone Sand) using best quality of country second class ground moulded chamber burnt bricks of size (9\"x4 3/8\"x2 3/4\") for foundation including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification - |
| 4 | Brick partition wall 11.50 cm thick in cement mortar 1:3 mix (One cement and three Crushed Stone Sand) mix using (9\"x4 3/8\"x2 3/4\") cm best country bricks with Plastering with C.m 1:3 including cost and conveyance of all materials and labour cost and etc., complete as per standard specification . .Without Plastering |
| 5 | Supplying and erecting, centering for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of 90cm x60cm BG 10 gauge stiffened with welded M.S. angle of 25 x 25 x 3mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10 cm to 13 cm dia spaced at not less than 75 cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification.(The payment for centeringshall be made only after the concrete is laid. The retrieved materials should be taken back by the contractor)Plane surfaces such as RCC floor slab, roof slab, rectangular square Tee or Ell beam, lintels, bed blocks staircase waist slab, landing slab, landing beams, portico beams, portico slab, etc. |
| 6 | Supplying and fabrication placing in position of M.S. (or) RTS rods for required size and length as directed by the deparmental officers approved design including bending cutting tying and cost of binding wire cost and conveyance of all materials to site etc., complete as per standard specification |
| 7 | Plastering with cement mortar 1:3 mix (One cement and three Crushed Stone Sand) to 12 mm thick including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification |
| 8 | Reinforced cement concrete 1:1 1/2:3 mix using 20 mm ISS metal (One cement one and half Crushed Stone Sand and three aggregate) from the approved quarry including mixing, laying, consolidating curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification |
| 9 | Plastering with cement mortar 1:4 mix (One cement and three Crushed Stone Sand ) to 20 mm thick mixing curring cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification |
| 10 | Supplying and fixing in position C.I.Manhole covers (light or heavy duty) mof various sizes of best approved quality and as per standard specifications etc.,complete. |
| 11 | Supplying and filling in foundation andbasement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification. |
| 12 | Supply and Filling of 40 mm & 20 mm ISS Metal 1:1, including curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification |
| 13 | Supply and fixing of RCC precast slab in cement concrete 1:1.5:3 mix (One cement one and half Crushed Stone Sand and three aggregate) using 20 mm ISS metal including cost of moulding charges mixing, laying and curing cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification but excluding cost of reinforcement (50mm thick) |
| 14 | Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m |
| 15 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. |
| 16 | Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works includingcutting, threading and fixing charges etc., |
| 17 | 1000 litres |
| 18 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A FT switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for light point / fan point (for electronic regulator) |
| 19 | GST 18% |