|
| 1 | DIGESTER TANK FULL CLEANINGTANK WORKOld silory mixing & removing , Recycling tank inside process, Primary tankcleaning work, Secondary tank cleaning work , Centre soft pipeline workPrimary digester tank work , Digester tank welding work |
| 2 | FRP WORK DIGESTER FULL TANKLeakage packing work , Glassroof mat work1×2 coating insideSurface grainmat work 1×2 coating outside ,Rasin layer past work Rubber chemical paste coating, Green past liquid coating work |
| 3 | GENSET ENGINE SERVICE14w40 engine oil 15 litters , Radiator service , Coolant oil 2 litter engine head and spark plug 4num , Speed control unit service Electric drives service , Self motor Service,Dynamo and power coil checking |
| 4 | FULL ELECTRICAL WORK Shredder room electric work ,Motor MCV regulator switch changing , Relay panel box switch changing |
| 5 | PIPE GATE VALVE CHANGINGNumber gate valve |
| 6 | COW DUNG WEST3ton LABOUR AND ALL TRANSPORTS INCLUDING |
| 7 | Dismantling ofBrick / Stone Masonry in cement mortar walls under 3m highas per standard specification |
| 8 | Supplying and Erecting Pull and Push Type Rolling Shutter with ISI make of approved size and section using 18 GI sheet. The shutter shall be painted with one coat of red oxide primer and the rate is inclusive of hood covers, transportation charges etc |
| 9 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 10 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour chargesetc., complete as per standard specification |
| 11 | Brick work in CM 1:5 (one cement & five sand) using II nd class ground moulded bricks of size 9\"X43/8\"X 2 3/4\" including finishing, curing,etc., complete complying with standard specification |
| 12 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) |
| 13 | Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour,including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. |
| 14 | Paving the floor with design Antiskirt ceramic tiles (colour and shade as directed) of size 305 mm x 305mm x 6 mm in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick laid in-situ and pointed with same coloured cement |