Tender For Special Repair On Isru To Payal Odr 24 Including Cost Of Five Years Maintenance One Yeardlp And 4 Years Maintenance
Tender Value
7.11 Crore
Estimated cost
Bid Submission
22 Jun 2023
0 days left
EMD
14.23 Lakhs
Bank guarantee accepted
Document Fee
30000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
payal → Punjab
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Special Repair On Isru To Payal Odr 24 Including Cost Of Five Years Maintenance One Yeardlp And 4 Years Maintenance
BOQ
| Sl. No. | Item Description |
| 1 | Scarifying Existing Bituminous Surface to a depthof 50mm by Mechanical MeansScarifying the existing Bituminous road surface to a depth of 50mm and disposal of scarified material with in all lifts and lead upto 1000 meters |
| 2 | Providing and laying of Brick on end edging Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications |
| 3 | Dismantling Brick Edging |
| 4 | Credit of Material |
| 5 | Brick Bats |
| 6 | Bricks |
| 7 | Providing, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications |
| 8 | Patch work with Water Bound Macadam Grading II (With Screening)Providing and laying patch work with stone aggregates of Grading II laid to water bound macadam specification after trimming the pot hole, removal of failed material, hand packing, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and rolling with smooth wheeled roller 8-10 tonnes to match the adjoining surface complete as per technical clause 404 of MORT&H specifications |
| 9 | Providing and laying surface dressing Providing and laying surface dressing in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG-10 @ 1kg per sqm laid on prepared surface after cleaning the road surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications |
| 10 | Tack Coat @ 0.40kg per sqm Providing and applying tack coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specifications |
| 11 | Bituminous Concrete 50mm to 65mm thickness (Grading I) - Providing and laying bituminous concrete 50mm to 65mm thick with Continuous type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.2%, laying with a Paver Finisher Mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications |
| 12 | TECHNICAL NOTE:-i.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for bituminous concrete shall meet all requirements set forth clause 507 of MORT&H specifications.ii.) The final grading for the aggregates required for bituminous concrete confirming to table 500.17 of MORT&H specifications shall be determined after getting the bituminous concrete designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).iii.) The approved mix shall exhibit the following details, source and location of all material:-(a) Binder expressed as percentage by weight of total mix.(b) Course expressed as percentage by weight of total mix.(c) Crushed bajri expressed as percentage by weight of total mix.(d) Fine aggregate expressed as percentage by weight of total mix.(e) A single definite percentage passing each sieve for mixed aggregates(f) Density of bituminous concrete after compaction will be not less than 2.35 gm/CC. |
| 13 | Construction of shoulders with good quality earth workConstruction of shoulders with good qulaity earth work obtained from borrow pits including compensation of earth, loading, unloading, carriage to site of work, spreading, grading to required slope an compacting to meet requirement as per clause 3003 of MORT&H specifications. |
| 14 | Road marking with thermoplastic paint |
| 15 | Advance Direction Board 1200x900 Square |
| 16 | Ordinary Kilometer Stone for Plan Roads |
| 17 | Village Board |
| 18 | Place Identification sign board 900x600mm rectangular .Using high intensity Microprismatic grade retro reflective Sheeting Type IV as per ASTM D 4956 09 and as per IRC 67 2012 as CSR 24.47 b |
| 19 | Cautionary sign board 600x600x600mm triangular as per IRC 67- 2012 with high intensity Microprismatic Using high intensity Microprismatic grade retro reflective Sheeting Type IV as per ASTM D 4956 09 and as per IRC 67 2012 complete as per CSR 24.44 b |
| 20 | Boundary Pillar |
| 21 | Road Studs |
| 22 | Construction of 20\" slab type Culvert |
| 23 | Culture Cess @ 1.00% |
| 24 | Routine Maintenance Work |
| 25 | Routine Maintenance of Construction Work As per Periodically to routine maintenance mentioned in the technical specifications (For 2nd Year) |
| 26 | Routine Maintenance of Construction Work As per Periodically to routine maintenance mentioned in the technical specifications (For 3rd Year) |
| 27 | Routine Maintenance of Construction Work As per Periodically to routine maintenance mentioned in the technical specifications (For 4th Year) |
| 28 | Routine Maintenance of Construction Work As per Periodically to routine maintenance mentioned in the technical specifications (For 5th Year) |
AI Tender Summary
Tender Timeline
Jun 03, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJun 22, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 22, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender