| 1 | Demolishing R.C.C. work Manually by mechanical means Including Stacking of Steel bars and disposal of unseviceable material within 50 metres lead as per direction of Engineer-in-charge. As per 39 Circle Sor Ch-17 Item no.-1 |
| 2 | Providing & Fixing R.C.C M-25 Bollard having 150mm dia & 1200mm height including two coat cement putty and two or more coats acrylic smooth exterior paint over RCC Bollard, labour, material etc for proper completion of the work. |
| 3 | Removal of unserviceable soil including excavation, loading and disposal upto 8000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. As per SOR Ch-25 item No.-25 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 6 | Providing and applying primer coat with SS-2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 7 | Providing and laying dense graded bituminous macadam with higher capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 8 | Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 9 | Providing and laying bituminous concrete withhigher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 10 | Fixing of cut Stone (100x100x75)mm size . Providing and laying 100x100x75 mm size cut stone over 50 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-39, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface having 10mm spacing around cut stone for pouring mastic asphalt, pressed into surface when the temperature of surfaces is not less than 1000C, including all complete as per clause 516. |