Water Resources Department-WRD has published E-Quotation For Framing Rates (Non Schedule Items) For Installation Of Solar Pump Under Lift Irrigation Schemes.. Submission Date for this Tender is 09-06-2023. Electrification Work Tenders in Saraikela Kharsawan Jharkhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | For 20 HP SPV AC Surface Pump |
2 | Solar module Mounting (Galvanised Steel) surface structure (for 50 kW) having Hot deep galvanised of Zinc thickness 80 micron and as per IS4759 with C Channel and anti theft with nut bolt of grade SS304, which should also withstand high wind velocity upto 150km/hr or as per MNRE. |
3 | 50kWp SPV module of 330wP or higher rating, which must have Specification as per IS 14286/IEC 61215. The module must have to quility IS/IEC 61730 part I and II (or having mechanical load test of 5400 Pa) for safety purpose. Module to Module wattage mismatch in SPV Array shall be +/-3% and to quality IEC TS 62804-2015 for detection of potential Induced degradation and warranted for output wattage not less than 90% in 10yrs abd 80% at the end of 25yrs as per MNRE. |
4 | SPV controller/VFD integrated with GPRS,having MPPT,Protection IP 65 or above as per MNRE to run 20HP AC Solar Pump. |
5 | Solar cable 4 mm2 used as per IS 694 or as per MNRE. |
6 | Copper cable 95 mm2 used as per IS 694 or as per MNRE. |
7 | Arrangement of Lightening Arrestor excluding Earthing for 50kW & 3 nos. 20HP solar Pump. |
8 | 20 H.P AC solar pump set of having performance with respect to Total Head. Maximum Current,Capacity, Voltage Range etc as per MNRE guidelines. |
9 | Array juction box ( IP 65 or above) as per MNRE for 50kW SPV. |
10 | Miscllaneous Accessories for Installation of 20H.P. solar pump |
11 | Supplying,Installation and commissioning Charge of Module and Structure for 50kW. |
12 | Maintenance for atleast 5 years or as per MNRE guidelines for 50kW SPV module & 3 nos. 20HP AC solar Pump with all accessories |
13 | For 10 HP SPV DC Surface Pump Solar Module Mounting (Galvanised Steel) surface structure for 50kW having Hot deep galvanised of Zinc thickness 80micron and as per IS4759 with C Channel & anti theft with Nut Bolt of grade SS304 which should also withstand high wind velocity upto 150km/hr or as per MNRE. |
14 | 50 kWp SPV module 330wP or higher which must have Specification as per IS 14286/IEC 61215. The module must have to quility IS/IEC 61730 part I $ II (or having mechanical load test of 5400Pa) for safety purpose. Module to Module wattage mismatch in SPV Array shall be +/-3% and to quality IEC TS 62804-2015 for the detection of potential Induced degradation and warranted for output wattage not less than 90% In 10yrs and 80% at the end of 25yrs as per MNRE. |
15 | SPV controller/VFD integrated with GPRS,having MPPT,Protection IP 65 or above as per MNRE to run 10HP DC Solar Pump. |
16 | Solar cable 4 mm² used as per IS 694 or as per MNRE. |
17 | copper cable 25 mm² used as per IS 694 or as per MNRE. |
18 | Arrangement of Lightening Arrestor excluding Earthing as per MNRE for 50kW SPV & 5 nos. 10HP DC solar Pump. |
19 | 10 H.P. D.C. (PMSM/BLDC/SRM) Solar pump set of having perfomance with respect to Total Head. Maximum Current,Capacity,Voltage Range etc as per MNRE guidelines. |
20 | Array juction box ( IP 65 or above) as per MNRE for 50kW SPV. |
21 | Miscllaneous Accessories for Installation of 10H.P. solar pump |
22 | Supplying, Installation and commissioning Charge of Module and Structure for 50kW. |
23 | Maintenance for atleast 5 years or as per MNRE guidelines for 50kW SPV module & 5 nos. 10HP solar Pump with all accessories |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail