Tender For Supply And Repair Of Over Head Lines And Tpn And Electrical Materials-1 S / F Of L.T. 3 Phase Ocb Indoor Type 1000 / 1200 Amp. / 415 V Capacity With Catalogue And Operation Manual Complete Gec. Easun Alstom Etc. Each 2 S / F Of L.T. 3 Phase.Ocb 400 Amp. / 415 V Capacity With Catalogue Gec Easun Alstom Etc. Each 3 S / F Of Over Head Line With Acsr Reccoon Conductor On Pole With Binding Complete 3 Phase 6 Wire System 40 Mtrs. Span. Each 4 Dismantling Of Lt Over Head Line Each Span 3 Phase 6 Wire System Complete Each 5 S / E Of Danger Board Complete According To Indian Electricity Rules. Each 6 S / F Of Over Head Lines Following Size Gi Wire On Pole Service Bracket Including Binding Complete. 1- Gi Wire 4 Swg Complete 2- Gi Wire 6 Swg Complete 3- Gi Wire 8 Swg Complete 4- Gi Wire 7 / 6 Swg Complete Each Kg Each Kg Each Kg Each Kg 7 Making Of Foundation And Electric Pole With Cement, Concrete And Sand 1:3:6 Including Around The Pole And Filling Properly Complete. Each 8 S / F Of Mccb 3 Phase 600 Amp / 500 V 800 Amp / 500 V With Cabinet Crompton Lt / Lk, Hawells Each 9 Numbering Of Electric Pole With Enamel Paint As Directed By J.E.And O / I Each 10 Excavation Of Old Cement Pole And Carriage From Site To Department Store. Each 11 Back Filling Of Earth Due To Heavy Rain Fall Of Lt Line Poles. Each 12 Resetting Of Following Lt Overhead Line Including Opening Of Binding Of All Insulator And Jumper And Rebinding Of Insulator Including Jumper Complete. 1- L.T. Over Head Line 5 Wire 3 Phase. 2- L.T. Over Head Line 4 Wire 3 Phase. 3- L.T. Over Head Line 3 Wire 3 Phase. 4- L.T. Over Head Line 3 Wire Single Phase . 5- L.T. Over Head Line 2 Wire Single Phase. 6- L.T. Over Head Line 4 Wire Panther 3 Phase. Each 13 S / E Of 1 Meter Long Cross Arm Of 65 Mm X 65 Mm X 06 Angle Iron On Pore Complete. Each 14 S / E Of 1 Meter Long Cross Arm Of 65 Mm X 60 Mm X06 For Cross And Service Bracket. Each 15 Excavation Of Underground Cable L.T. And Its Carriage From Site To Departmental Store Complete. Each 16 S / F Of Pcc Pole 9 Mtrs. Long Complete With Excavation And Back Filling And Grouting In 1:3:6: C.C. Complete17 S / F Of Holding Pipe With Clamp And Nut Bolt For Tabular Pole Holding Pipe 1.5 Mtrs Long Gi 2” Dia With Bend And Welding. Each 18 S / F Of Holding Pipe 1 Mtrs. Bended 2” Dia Or Grounting In Cement Motor Complete. Each 19 S / F Weather Proof Pvc Ai. 2 Core Conductor 3Sq. Mm With 10 Swg Gi Wire Catenary Wire Complete. Each 20 S / F Weather Proof Pvc Ai. 2 Core Conductor 4Sq. Mm With 10 Swg Gi Wire Catenary Wire Complete. Each 21 S / F Weather Proof Pvc Ai. 2 Core Conductor 10 Sq. Mm With 10 Swg Gi Wire Catenary Wire Complete. Each 22 S / F Of Pvc Spacers For Following Lt Overhead Line With Binding Complete. As Directed. J.E. 1 L.T. Over Head Line 6 Wire 3 Phase. 2 L.T. Over Head Line 5 Wire 3 Phase. 3 L.T. Over Head Line 4 Wire 3 Phase. 4 L.T. Over Head Line 3 Wire 3 Phase. 5 L.T. Over Head Line 3 Wire Single Phase . Each 23 Construction Of Plingth For Transformer With Cement And Stone Ballast 180X180x180 Cm Size Top Of The Plingth Grouted Ms Channel As Transformer Base Required Complete Of Hydel Design, Labour, Material T&P Complete Each 24 S / F Of 11 Kva Fuse Set On Transformer Complete In All Material, Labour And T&P Complete Each 25 S / F Of 11 Kva Tpmo With Jaw And Blad Copper Fabricated And Copper Spring For Connection Complete Each 26 S / F 11 Meter Steel Tubular Pole As Per Hydel And Pwd Design Norms. Each 27 S / F Of Steel Arms 11 Kv St Pole V Type Complete Each 28 S / F Of Ms Double Pole Top Ms Channel 100X50x90 Mm Complete Each 29 S / F Of Ms Angle 50X50x6mm Complete Each 30 S / F Of 11 Kva Pin Insulator Complete Each 31 S / F Of 11 Kva Ms Disc Insulator Complete Each 32 S / F Of 11 Kva Ms Dis Fitting For Rabbet Conductor Complete Each 33 S / F Of Dropper Ms Channel For Double Pole Complete Each 34 S / F Of Cross X Arm Ms Clamps For St Pole Complete With Nut Bolt Complete Each 35 S / F Of Top Channel Clamps With Nut Bolt Complete Each 36 S / F Of Top Channel Complete 160X180 Mm Complete With Fitting Complete Each 37 S / F Of G.I. Wire 8 Swg For Electric Line Guarding Complete. Each 38 S / F Of Ht 11 Kva Line On Pole Including Binding Acsr, Rabbet Conductor Complete. Each 39 Carriage Of Transformer In Medical College Campus With Loading, Unloading T&P Labour Complete. Each 40 S / F Of M.S Box For Meter With Locking System 4”X3”- 120Cm X90 Cm Almirah Type With Grouting & Painting Etc. Each 41 Supply And Fixing Of Steel Tubular Pole 11 Meter Long Designated 410 Sp-56 In 1:3:6 Cement Concrete Foundation Including Excavation Back Killing Etc. Complete In All Respect With Pole Cap. Each 42 Supply And Fixing Of 6 Arms Angle Iron Hexagonal Bracket With Ms Pipe Colloar With Support Of 40 Mm Dia Gi Pipe 6 No Also Providing Structure For Hanging Iron Box Of Fitting As Per Direction Drawing, Designed Of E / I To Give Uniformity Light To Round Surface. Each 43 Supply And Laying 75 Mm Dia Gi Pipe For Laying In Of Road Cutting. Crossing Each 44 Supply And Fixing Of Ms Box Of Size 600 Mm X 480Mm X 200Mm Deep In Sunk For Housing 63 Amp, Tpn Fabricated For 16 Guage Ms Sheet And 13Mm X 2.5 Mm Flat Iron Etc. Painted With Red Oxide Primer And Two Enamel Coat P.S. No. 1114 ( B ) Each 45 Supply And Fixing An Fabrication Of 600Mm X 600Mm X 300Mm Mini Bus Bar For Connecting The Gear Bos Of The Fitting ( Near The Gear Box Fitting ) Including 4 Nos Aluminum Strip Of 2” X ½ Size And 500 Mm Long Supported On ½” Back Light Hylam In Insulated Sheet Duly Grouted By Nut And Bolts, Water And Warning Proof Having Front Hinged Door With Locking Arrangement Duly Painted With Two Enamel Coat And Red Oxide Primer. 46 Supply And Fixing 25 Mm Pvc Flexible Pipe Required For Covering The Connecting Wire Between Fitting, Gear Box And Bus Bar Complete In All Respect. Each 47 Supply Of Copper Wire 3 / 20 Required Making Connection Between Fittings, Gear Box And Bus Bar Each 48 Supply And Fixing Of Control Panel 11 Kva Each 49 S / F Of 11 Kv, Vcb I / C Ctr400 / 200 / 5A Each 50 S / F Of 11 Kv, Vcb O / C Fdr Ctr200 / 100 / 5A Each 51 S / F Of 11 Kv, Vcb B / C 200 Mva Each 52 S / F Of 11 Kv, Vcb I / C 600 / 300 / 5A Each 53 S / F Of 11 Kv, Vcb B / C 250 Mva Each 54 S / F Of 11 Kv, Vcb Fdr Ctr200 / 100 / 5A Each 55 S / F Of 11 Kv, Vcb Fdr B / C 350Mba Each 56 S / F Of 11 Kv, Vcb I / C Ctr400 / 200 / 5A Repairing & Installation 57 S / F Of 11 Kv, Vcb O / C Fdr Ctr200 / 100 / 5A Repairing & Installation 58 S / F Of 11 Kv, Vcb B / C 200 Mva Repairing & Installation 59 S / F Of 11 Kv, Vcb I / C 600 / 300 / 5A Repairing & Installation 60 S / F Of 11 Kv, Vcb B / C 250 Mva Repairing & Installation 61 S / F Of 11 Kv, Vcb Fdr Ctr200 / 100 / 5A Repairing & Installation 62 S / F Of 11 Kv, Vcb Fdr B / C 350Mba Repairing & Installation 63 S / F Of Battery Ni-Co With Cabinet 24 V Each 64 S / F Battery Charger 2472 V Each 65 S / F Of Battery 24 Flat Plate Lead Acid Each 66 S / F Cable Ai 1 X 240 Sq. Mm.N Pvc Each 67 S / F Cable Ai 1 X 400 Sq. Mm.N Pvc Each 68 S / F Cable Ai 1 X 630 Sq. Mm.N Pvc Each 69 S / F Of Copper Strip As Required Size And Capacity For Transformet And Bus Fas Cutting Ad Holes Etc. Each 70 S / F Of Ai. Strip As Required Size And Capacity For Transformet And Bus Fas Cutting Ad Holes Etc Each 71 Chopping / Cutting Of Electric Over Head Line Touching Trees. T&P And Labour Coverage And Store Of Each 72 11 Kva Breaker C.T. Ro Ho 50 / 5A Each 73 11 Kv X 2 Pe Cable 3X120 Mm Each 74 Cable Box Outdoor Type 3X 120Mm Each 75 Cable Box Indoor Type 3X 120Mm Each 76 Cable Box Indoor Type 3X 185Mm Each 77 Repairing Of Vcb 50 Mva Crompton Make Each 78 S / F L.E.D Light 20, 35, Watts Etc. Each 79 S / F L.E.D Light 45, 65, Watts Etc. Each 80 630 Kva Transformer Etc. Each 81 400 Kva Transformer Etc. Each 82 250 Kva Transformer Etc. Each 83 100 Kva Transformer Etc. Each 84 630 Amp.Ka, Fpmccb Etc. Each 85 400 Amp.Ka, Fpmccb Etc. Each 86 250 Amp.Ka, Fpmccb Etc. Each 87 70 To 100 Watts Led Street Pole Light ( Syska, Havells, Metador, Orient ) Each 88 70 To 100 Watts Led Street Pole Light Repairing ( Prima, Havells, Metador ) Each 89 09 Watt Led Bulb ( Syska, Philips, Havells, Surya, Bajaj ) Each 90 14 Watt Led Bulb ( Syska, Philips, Havells, Surya, Bajaj ) Each 91 20 To 24 Watt Led Tube Light ( Syska, Philips, Havells, Surya, Bajaj ) Each 92 1 Sqmm Copper Wire Single Core Supply Each 93 1.5 Sqmm Copper Wire Single Core Supply Each 94 2.5 Sqmm Copper Wire Single Core Supply Each 95 4 Sqmm Copper Wire Single Core Supply Each 96 4 Sqmm Aluminium Wire 2 Core Supply Each 97 6 Sqmm Aluminium Wire 2 Core Supply Each 98 10 Sqmm Aluminium Wire 2 Core Supply Each 99 5 Amp. Switch Supply Each 100 5 Amp. Soket Supply Each 101 15 Amp. Switch Supply Each 102 15 Amp. Soket Supply Each 103 100 Kva Transformer Repairing & Binding & Installation ( All Requirement ) Each 104 160 Kva Transformer Repairing & Binding & Installation ( All Requirement ) Each 105 250 Kva Transformer Repairing & Binding & Installation ( All Requirement ) Each 106 400 Kva Transformer Repairing & Binding & Installation ( All Requirement ) Each 107 630 Kva Transformer Repairing & Binding & Installation ( All Requirement ) Each 108 1600 Kva Transformer Repairing & Binding & Installation ( All Requirement ) Each 109 Transformer Oil Fresh Supply Per Liter 110 240 Sqmm Lug Supply Each 111 300 Sqmm Lug Supply Each 112 150 Sqmm Lug Supply Each 113 120 Sqmm Lug Supply Each 114 40 / 76 Core Copper Wire Each 115 Geyser ( Havells, Crompton, Bajaj ) Each 116 Meter Supply & Fixing ( Single Phase Digital Meter ) Each 117 Meter Supply & Fixing ( Three Phase Digital Meter ) Each 118 32Amp. Complete Mcb Box Each 119 Stabilizer For Ac ( 170V To 270V ) - Microtek, V-Guard, Bluebird Each 120 Single Battery Inverter 900 Va ( Luminous, V-Guard, Microtek ) Each 121 Double Battery Inverter 1500 Va ( Luminous, V-Guard Microtek ) Each 122 Exhaust Fan 18 Inch 450Mm ( Make Bansal, Havells, Crompton ) Each 123 Exhaust Fan 12 Inch 300Mm ( Make Bansal, Havells, Crompton ) Each 124 Exhaust Fan 18 Inch 450Mm Binding & Repairing Each 125 Exhaust Fan 12 Inch 300Mm Binding & Repairing Each 126 1 Hp Submersible Pump Single Phase ( Make Kirloskar, Crompton, Cri ) Each 127 1.5 Hp Submersible Pump Single Phase ( Make Kirloskar, Crompton, Cri ) Each 128 2 Hp Submersible Pump Single Phase ( Make Kirloskar, Crompton, Cri ) Each 129 3 Hp Submersible Pump Three Phase ( Make Kirloskar, Crompton, Cri ) Each 130 5 Hp Submersible Pump Three Phase ( Make Kirloskar, Crompton, Cri ) Each 131 7 Hp Submersible Pump Three Phase ( Make Kirloskar, Crompton, Cri ) Each 132 10 Hp Submersible Pump Three Phase ( Make Kirloskar, Crompton, Cri ) Each 133 1 Hp Moter Three Phase ( Make Kirloskar, Crompton ) Each 134 2 Hp Moter Three Phase ( Make Kirloskar, Crompton ) Each 135 3 Hp Moter Three Phase ( Make Kirloskar, Crompton ) Each 136 5 Hp Moter Three Phase ( Make Kirloskar, Crompton ) Each 137 7 Hp Moter Three Phase ( Make Kirloskar, Crompton ) Each 138 10 Hp Moter Three Phase ( Make Kirloskar, Crompton ) Each 139 1 Hp Submersible Pump Single Phase Binding & Repairing Each 140 1.5 Hp Submersible Pump Single Phase Binding & Repairing Each 141 2 Hp Submersible Pump Single Phase Binding & Repairing Each 142 3 Hp Submersible Pump Three Phase Binding & Repairing Each 143 5 Hp Submersible Pump Three Phase Binding & Repairing Each 144 7 Hp Submersible Pump Three Phase Binding & Repairing Each 145 10 Hp Submersible Pump Three Phase Binding & Repairing Each 146 1 Hp Moter Three Phase Binding & Repairing Each 147 2 Hp Moter Three Phase Binding & Repairing Each 148 3 Hp Moter Three Phase Binding & Repairing Each 149 5 Hp Moter Three Phase Binding & Repairing Each 150 7 Hp Moter Three Phase Binding & Repairing Each 151 10 Hp Moter Three Phase Binding & Repairing Each 152 Pliers, Pechkas 18 Inch, 12 Inch, Tester Make Tapariya, Each 153 Tools Kit 10 To 36 No. Make Tapariya Each 154 Lineman For 11Kva Per Day 155 Rain Coat Each 156 Bettan Holder ( Make Havells, Anchor, Kent