Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #37969829

Providing, Laying And Jointing Of Di / Hdpe Pipeline Under Jurisdiction Of Phed Dn. Taranagar

Issued by Government Departments · Taranagar, Rajasthan
Tender Value
92.60 Lakhs
Estimated cost
Bid Submission
15 Jun 2023
0 days left
EMD
1.85 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Taranagar → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Providing, Laying And Jointing Of Di / Hdpe Pipeline Under Jurisdiction Of Phed Dn. Taranagar

BOQ

Name of Work:Providing,Laying and Jointing ofDI/HDPE Pipeline under jurisdiction ofPHEDDn. Taranagar.”
Sl. No. Item Description
1Providing, lowering, laying in trenches, aligning, fixing in position and jointingDuctileIron(DI)ISI markedK-7 gradeS&Spipesas per IS:8329-2000 (amendedup todate),withinternalcementmortar liningsuitable forpotablewaterwithrubberring (EPDM) jointsas perIS:5382-1985includingalltaxes(Centralandlocal), transportation and freight charges, inspection charges, loading/ unloadingcharges, includingcostoflabourandmaterial,specials (Tee,bendetc.)satisfactoryhydraulictesting,disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge. (excluding earth work)Note:Providingandfixingofallrequisitespecialsasperdrawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.
2200 mm
3Providing,lowering,layingandjointing intrenches, standard lengths HDPEISI marked Pipes as per IS-4984: 1995 (amended up to date) withnecessaryjointingmateriallikemechanicalconnectors,i.e.thread/insertjoint/quickreleasecouplerjoint/compression fittingjointorflangedjointandspecialsjointingpipeby electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer in-charge of following class and diameter. (excluding earth work) . Note:Providingandfixingofallrequisitespecialsasperdrawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.Supply may be in coil or straight length in 6 M/12 M.
4HDPE PE-80PN-6
590 mm dia
6110 mm dia
7Providing,lowering,layingandjointing intrenches, standard lengths HDPEISI marked Pipes as per IS-4984: 1995 (amended up to date) withnecessaryjointingmateriallikemechanicalconnectors,i.e.thread/insertjoint/quickreleasecouplerjoint/compression fitting joint or flanged joint and specials jointing pipe by butt fusion/ electrofusionweldingmethod,includingalltaxes,transportation andfreight charges, inspectioncharges, loading/unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer in-charge of following class and diameter. (excluding earth work). Note:Providingandfixingofallrequisitespecialsasperdrawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately.Supply of pipe shall be in straight length in 6/12 M.
8HDPE PE-80PN-6
9140 mm dia
10160 mm dia
11180 mm dia
12225 mm dia
13Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:All kinds of soil
14De-jointingandremovingofalreadylaid CI/DIpipesoffollowing diameters in excavated trenches with care, without damaging pipes, CID joints, valves, specials etc. and other materials and then refilling of soil after de-laying and de-jointing of pipelines with proper compaction and disposing of all surplus soil as directed with in a lead of 30 mtr. This also include stacking the pipes with care and transporting the same to div./sub div. store or as directed by EIC with in the division. (Rates are Exclusive of Earth Work)
15200 mm
16Laying, Jointing, Testing and Commissioningof Ductile Iron (DI) Pipes of any class in assorted length with specials, valves etc. including local handling and transportation from PHED store and then refilling of soil with proper compaction and disposing of all surplus soilas directed with in a lead of 30 mtr as per satisfaction of EIC. (Rates are Exclusive of Earth Work and jointing materials)
17200 mm
18Laying,Jointing,TestingandCommissioning ofHDPEpipesofany gradein assorted length with specials, valves etc. with jointing material/ fixing of necessary jointing material like mechanical connector i.e. thread/ insert joint/quick release coupler joint compression fitting joint or flanged joint and jointing pipe in proper positionandjointingofallspecialsbybuttfusion/electrofusion weldingmethod,includinglocalhandlingandtransportationfrom PHEDstoreandthenrefillingofsoilwithpropercompactionand disposing of all surplus soil as directed with in a lead of 30 mtr as per satisfactionofEIC.(RatesareExclusiveofEarthWorkandjointing materials)
1990 mm
20110 mm
21140 mm
22180 mm
23225 mm
24Providing,lowering,laying,aligning,fixinginpositionatalllevel/ depths CI Class - Bspecials as per IS : 1538, amended up to date in trenches completeincluding all material, labour, testing and commissioningalongwithpipeline/appurtenanceasperTechnical Specifications and as per direction of Engineer.Note : E/w to be measured and paid separately.
25Plain ended CI specials including tail piece, spigot end and socket end.
26Up to 300 mm dia

AI Tender Summary

OUR REF NO 37969829
AUTHORITY Government Departments
TENDER VALUE 92.60 Lakhs
LAST DATE 15-06-2023
Authority
Authority Name Public Health Engineering Department
Work Description Providing, Laying And Jointing Of Di / Hdpe Pipeline Under Jurisdiction Of Phed Dn. Taranagar
Basic Detail
Tender No 16/2023-2024
Bidding Type Tender
Location
City Taranagar
State Rajasthan
Key Dates
Publish Date 01 Jun 2023
Submission Date 15 Jun 2023
Open Date 16 Jun 2023
Finance
Tender Value 92.60 Lakhs
Tender Fee 1000
EMD 1.85 Lakhs
Exemption Not Available
Document List
c13b8250-27d6-4011-913f-29bdbf829816.html
BOQ_603193.xls
TD16pdf.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 01, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 15, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 16, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

c13b8250-27d6-4011-913f-29bdbf829816.html

xls

BOQ_603193.xls

pdf

TD16pdf.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders