|
| 1 | Service and replacement of scrubbing unit made of MS304 with Thickness 2mm, and Pipelines, Design & fabrication of high- speed impellor made of Material SS310 grade, Dimensions 500mm dia 150mm height and 3mm thickness – 1No. Design and manufacturing of impellor matching shaft of 65mm dia, 600 mm long, to match suitable bearing, Pulley, slated keyway, High speed SS Bearing UCB type – 2Nos, Matching pulley, matching poring and Slate keyway drilling Balancing of impellor at 1400 RPM Service of water spray and fixing of pipelines Coil winding of 5HP motor and replacement of Suitable bearings. Service and replacement of ID Blower MS. main door with open and close gear motor system connectedto Control panel at your existing Crematorium furnace. (As Per Quotation) |
| 2 | Service and replacement of body crematorium area bottom place Fire refractory bricks grade suitable size. Supply and fixing of body Placing bed IS8 slabs 40%aluminum 24 x 12 x 3(inches). Bed size 300mm height and2-meter long 600mm width body placing bed by fixing cast-ironframes. Removal of old damaged body placing bed. (As Per Quotation) |
| 3 | Supply and fixing of Pipelines and ducting-fixing and welding. 20 mtr long, 300 mm dia, 4mm thick, flanges, boltnut,gasket, 90-degree bend including all labor charges etc. (As Per Quotation) |
| 4 | Design, fabrication, Supply and fixing of furnace Manual Operated main door Door dimension 1200mm x 1400mm x 225mm Door support given by MS Angles. Providing door Insulation material 96 grade fiber Blanket up to 1260 Deg Celsius lining fully supported by stainless steel studs 304 grade.Covering the door fully using mild steel. Handing over in smoothrunning condition. (Up and down movements) (As Per Quotation) |
| 5 | Providing LPG manually firing system, includes following items,a) Supply and fixing of 10 cylinders manifold -1No,4 burners Non-return valve -10Nos, Metallic flexible hose -10 Nos, Main ball valve -1No, high Pressure regulator -1No,Needle valve with copper tube -1No, Pressure dial Gauge -1No,Flow control valve (1”) -1 No,High velocity burners (Ni-21% Cr-25%) -6 Nos,LPG pipeline 1” Dia -1Set, 1” Pipe flanges -1Set l), LPG pipeline ¾” Dia -1 Set,¾” Pipe flanges -1Set, Suitable Fasteners(Bolts, Nuts, & washers) -1Set, ¾” Ball valve -1No, 4” Dia 1 meter long 304 pipe -6Nos, 1” Dia 1 meter long 304-6 Nos, Hex Nipple 3mm Dia -6 Nos, 1’ union -4 Nos, Copper tube 1-meter long 8mm Dia -6 Nos,Copper tube 1 meter long 10 mm Dia -1No, ¾” Pipe nipple-10 Nos, Burner covering insulation material 1260 Deg C grade ceramic fibers work. The rate inclusive of all Materials and all labor charges etc. Providing burnerfixing Holes of 4” dia at both sides of the wall atyour existing gasifier crematorium furnace (As Per Quotation) |
| 6 | Semi Automatic LPG fired burner (35000 Cal) 4 nos. Electrical Control Panel features:• 5hp blower- 1no• 2hp water pump 1no• Burner Outputs 4nos• Temp Controller 1nos• Temperature couple 1nos• Compensating cable 1set• Burner to panel cables 10 core.75sqmm 4set (65MTRS)• Sensor K-TYPE 1set •Automatic door up to down 0.5HP 3PH (As Per Quotation) |
| 7 | Supply and fixing operating control panel backup DG set, temperature controller, voltmeter, ammeter, main on off switch, MCB relay, on off indicator switches, indicatorlamps, connecting wires and cables . (As Per Quotation) |
| 8 | Providing Through Vertical Joint with 12mm space filled with bitumenous compound running from bottom of foundation upto the top of parapet wall as directed- 10 m2 (S.I.149) |