Tender For Sector 9 (Incl.) Of Elevated Corridor (28.5 Km) From Huda City Centre To Cyber City.
Tender Overview
Project Description
Sector 9 ( Incl. ) Of Elevated Corridor ( 28.5 Km ) From Huda City Centre To Cyber City.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Jun-2023 | Corrigendum 1 | Other | 30-Jun-2023 |
| 2 | 27-Jun-2023 | Corrigendum 2 | Date | 07-Jul-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | IMobilization and Barricading |
| 2 | II Drilling and Sample Collection |
| 3 | 1. Drilling of bore hole in all types of strata |
| 4 | a) GL to 10m |
| 5 | b) 10m to 20m |
| 6 | c) more than20m |
| 7 | 2. Drilling in rock required cutting by diamond bits/cutters |
| 8 | a) In weathered Rock |
| 9 | b) In Hard Rock |
| 10 | 3. Carry out SPT tests |
| 11 | 4. Collecting disturbed samples |
| 12 | 5. Collecting Undisturbed samples |
| 13 | 6. Conducting Permeability test |
| 14 | a) In over burden using falling head |
| 15 | b) In Rock with Packers |
| 16 | 7. Collecting water samples |
| 17 | 8. Survey all bore holes including plotting of coordinate (XYZ) on alignment plan |
| 18 | IIILaboratory Test |
| 19 | ASoil Samples |
| 20 | 1. Sieve Analysis |
| 21 | 2. Hydrometer Analysis |
| 22 | 3. Specific Gravity |
| 23 | 4. Moisture Content |
| 24 | 5. Dry Density |
| 25 | 6. Atternberg limits |
| 26 | 7. Direct Shear Tests |
| 27 | 8. Triaxial Shear Tests |
| 28 | 9. Chemical Analysis |
| 29 | a) Soil |
| 30 | b) Water |
| 31 | B. Rock samples |
| 32 | 1.Density tests |
| 33 | 2.Water absorption and Porosity |
| 34 | 3.Determination of Hardness |
| 35 | 4.Unconfined compression tests |
| 36 | 5.Carry out point load index |
| 37 | 6. Modulus of elasticity |
| 38 | 7. Abrasion Testing |
| 39 | IV. Report |
| 40 | 1.Draft report |
| 41 | 2.Provide final report 1 set (6 copies) |
| 42 | V.Provisionof barricading as per tender drawing at the location of each bore hole, provision of lighting, traffic marshals etc. as per the safety manual, maintaning, shifting the entire set up to next location including all incidentals |
| 43 | For Adjusting error |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender