Northern Coalfields Limited-NCL has published Tender For Planning, Design, Engineering, Construction And Other Works For Coal Handling Plant At Khadia Project As Per Nit. Submission Date for this Tender is 14-07-2023. Coal Handling Plant Tenders in khadia Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 05-Jun-2023 | PREBID MEET VC LINK | Other | 26-06-2023 |
2 | 24-Jun-2023 | DATE CORRIGENDUM | Date | 10-07-2023 |
3 | 10-Jul-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 14-07-2023 |
Sl. No. | Item Description |
1 | A. WORK & SERVICES |
2 | Detailed survey of the area, within the battery limits & submission of reports |
3 | Sub soil exploration, field and laboratory testing of samples & submission of reports |
4 | 3. Design Engineering Cost |
5 | Preparation and submission of system engineering drawings as per system requirements |
6 | GA & detail engineering designs and drawings of all civil and structurals included in the system and scope of works |
7 | G.A. & detailed engineering designs and drawings including working and maintenance manuals of : i)All individual equipment ( Mechanical & Electricals)ii) Dust Control & Pressurisation system.iii) Fire-fighting and plant cleaning system. iv) Chutes & Liners v)Communication system vi) Power Supply System vii)Illumination system.ix) Plant control system x) OHE System x) Any other system/unit to matchthe scope of work& requirement |
8 | Documentation as per tender specification |
9 | B. CIVIL & STRUCTURAL WORKS |
10 | I. Civil and structural work |
11 | Truck Receving Hopper (4x100 Te) including RCC retaining wall |
12 | Truck Receving Platform including Pavement over approach ramp |
13 | Conveyor Gantry/Gallery with supporting structures |
14 | Transfer House/Drive Houses , Sampling House |
15 | 15000 Te Over Ground Bunker including maintenance bay |
16 | 2x 500 Te Surge Hopper including liftwell |
17 | RCC Rail Over Bridge for 190T dumper including ramp on both side, wing walls and ramp for coal transport road |
18 | Temporary diversion of dumper road to workshop |
19 | CTR and LMV road near Bunker area |
20 | II. Developmental work and infra-structure |
21 | CHP Office Complex: CHP office, Rest Shelter, First Aid centre, Time & Security office, LMV/Car Parking Shed and Scooter/motor cycle Shed. |
22 | Store cum maintenance workshop |
23 | 1 nos. Pump house |
24 | 2 Nos. Electrical Sub-station building |
25 | Lighting Mast |
26 | Internal Approach road/ Service road 3.75m Wide (All Transfer houses, over Ground Bunker, Loading Stations etc. shall be connected with 3.75 m wide carriage way) |
27 | Drain |
28 | RCC Hume Pipe Culvert |
29 | RCC Culvert |
30 | Boundary Wall with gate |
31 | PVC Over Head Tank |
32 | Ground water reservoir |
33 | Filterred Water supply distribution |
34 | Collection sumps and arrangement for conveying of Industrial Effluent to existing ETP |
35 | Sewerage |
36 | Landscaping and Arboriculture |
37 | Site Development (includes Embankment for road, chanellising of nallah, levelling and storm water drains) |
38 | C. PLANT & MACHINERY ( SUPPLY) |
39 | C.(a)SUPPLY : MECHANICAL |
40 | CONVEYORS |
41 | BELTING |
42 | C. EQUIPMEMT |
43 | Receiving Section Mechanical Equipment |
44 | MechanicalEquipment in Storage Section |
45 | Mechanical Equipment at Transfer house |
46 | Mechanical equipment at Loading Complex |
47 | OHE Equipment including mechanical, electrical and civil requirement |
48 | Other mechanical equipment |
49 | Dust suppression system with piping & other accessories. Condition monitoring system, Safety & firefighting system , and other misc. equipment/utility for any more item required to complete the project |
50 | C.(b)SUPPLY : ELECTRICAL |
51 | I. ELECTRICAL |
52 | Substation- A (SS-1) |
53 | Substation-A(SS-1) Power receiving arrangment from substation A(SS-1) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 750 KVA Distribution transformer-2nos. 6.6/0.230 V (L-L), 100 kVALighting Transformer-2nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 1A & 1B (Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs complete with metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-A Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. 6.6 kV Double Circuit Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supply as required. Fire detection, Alarm and Protection system. |
54 | Substation-B (SS-2) |
55 | Substation-B(SS-2) Power receiving arrangment from substation B(SS-2) with Lightning Arrester and Isolator with earth switch as required. 6.6/0.433 kV, 1000KVA Distribution transformer-2 nos. 6.6/0.230 V (L-L), 100 KVA Lighting Transformer-2 nos. 220V Lead Acid Battery complete with Battery Charging unit.-1 no. 6.6 kV 3 Phase, 3 Wire Switchboard 2A(Indoor ) Comprising of Incomer VCB, Buscoupler VCB and Outgoing VCBs/VCPs, Metering and protection as required 415V,Aluminium Bus-duct as required. MCC at Substation-C Comprising of Incomer ACB, Buscoupler ACBs and Outgoing ACBs/MCCB/SFU/ Contactor as required. 6.6 kV and 415 V Capacitor with Automatic power factor correction of required capacity Banks for power factor improvement as required. 6.6 kV Double Circuit Overhead line comprising of AAAC ’Wolf’ equivalent Conductor for power supplyas required. Fire detection, Alarm and Protection system. |
56 | C. Cables |
57 | Power Cables |
58 | Control & Signalling Cables |
59 | Lighting Cables & wires |
60 | Communication Cables |
61 | D. Earthing |
62 | Plant Equipment Earthing |
63 | Structures Earthing |
64 | Earthing for Lightning Protection |
65 | Tranformer neutral Earthing |
66 | Welding Sockets and Electical & Diesel Welding Set |
67 | PLC System for Control & Automation,Interlocks, Signalling and instrumentation of entire CHP. |
68 | Remote and sequence control equipment & Accessories |
69 | Cable Trays, Cable Racks, Cable Trenches, Cable Voults etc. |
70 | Illumination System and Luminaires, Lighting poles & Towers, Lighting DBs etc. |
71 | DG sets for Emergency Power Supply.-2 nos. |
72 | Exhaust Fan, Ceiling Fan, Air Conditioner, insulating Mats etc. |
73 | Computers and Peripherals |
74 | Communication System |
75 | Traffic Control Console |
76 | C1 ERECTION, INSTALLATION & COMMISSIONING |
77 | Erection of mechanical equipment |
78 | Erection of electrical equipment |
79 | Erection of other plant and machining etc. |
80 | Trial run, and commissioning of the plant |
81 | C2 . OTHERS ITEM |
82 | Drinking water system consisting of tanks, pipes, valves, taps etc. |
83 | Plantcleaning system |
84 | Any other item left out for completion of the project |
85 | C3 . MAINTENANCE AND TRAINING |
86 | Operation of the plant for five years as described in Tender document |
87 | Maintenance of the plant for five years as described in Tender document |
88 | Training of the employerpersonnel as per tender document |
89 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail