| 1 | ROUTINE MAINTENANCE OF BOILER UNIT8&9 |
| 2 | ATTENDING BTL OF WW <10 HP WELD JOINTS |
| 3 | ATTENDING BTL OF WW >1O HP JOINTS |
| 4 | ATTENDING BTL OF ECO/LTSH <10 JOINTS |
| 5 | ATTENDING BTL OF ECO/LTSH >10 JOINTS |
| 6 | ATTENDING BTL OF CEILING SH <10 JOINTS |
| 7 | ATTENDING BTL OF CEILING SH >10 JOINTS |
| 8 | ATTENDING BTL OF CRH HRH HANGER FINAL SH |
| 9 | ATTENDING BTL OF CRH HRH HANGER FINAL SH |
| 10 | ATTENDING BTL OF SCW <10 JOINTS |
| 11 | ATTENDING BTL OF SCW >10 JOINTS |
| 12 | ATTENDING LEAKAGE OF HAND HOLE PLATE |
| 13 | ATTENDING LEAKAGE OF HEADER STUBS UP |
| 14 | FIXING OF SKY CLIMBER IN BOILER FURNACE |
| 15 | REPLACEMENT OF U CLAMPS |
| 16 | REPLACEMENT OF SCALLOP BARS |
| 17 | REPLACEMENT OF BINDERS SUPPORT BAND LUGS |
| 18 | REPLACEMENT OF FLEXIBLE CONNECTORS |
| 19 | FABRICATION OF BENDS CARBON STEEL |
| 20 | FABRICATION OF BENDS ALLOY STEEL |
| 21 | STITCH WELDING OF WW FINS SCW |
| 22 | REPLACEMENT OF TUBULAR PROTECTOR PLATEN |
| 23 | REPLACEMENT OF CASSETTE BAFFLE LTSH/ECO |
| 24 | REPLACEMENT OF TUBULAR PROTECTOR LTS/ECO |
| 25 | REPLACEMENT OF CASSETTE BAFFLE PLATEN |
| 26 | ERECTION OF SCAFFOLDING IN ECO HOPPER |
| 27 | ERECTION OF SCAFFOLDING IN S-PANEL |
| 28 | ERECTION OF SCAFFOLDING REHEATER IN &OUT |
| 29 | SCAFFOLDING WW SCREEN TUBE/FSH |
| 30 | BUILD UP OF ERODED PORTION OF THE TUBES |
| 31 | LIFTING LTSH HORIZONTAL COILS |
| 32 | LIFTING COILS OF ECONOMIZER |
| 33 | REPLACEMENT Of BENDS OF LOW ALLOY (T-11) |
| 34 | REPLACEMENT Of BENDS OF HIGH ALLOY T-22 |
| 35 | REPLACEMENT Of BENDS OF SS |
| 36 | SHIFTING OF SKY CLIMBER IN BOILER FUR |
| 37 | REPAIR OF SKIN CASING THICKNESS <15 MM. |
| 38 | REPAIR OF SKIN CASING THICKNESS >15 MM |
| 39 | HARDNESS TESTING |
| 40 | PAINTING |
| 41 | PENTHOUSEDOGHOUSE |
| 42 | Rout Maint HP/LP ,Safety,PRDS Valve |
| 43 | REPLACEMENT OF SAFETY VALVE |
| 44 | REPLACEMENT OF VALVE 15-25 MM |
| 45 | REPLACEMENT OF VALVE 40-50 MM |
| 46 | REPLACEMENT OF VALVE 65-70MM |
| 47 | REPLACEMENT OF VALVE 100 MM |
| 48 | REPLACEMENT OF VALVE 150-200 MM |
| 49 | SERVICING OF FEED LINE VALVES FULL LOAD |
| 50 | SERVICING OF LOW LINE VALVE FD-19, 20,21 |
| 51 | SERVICING OF SPRAY CONTROL & BLOCK VALVE |
| 52 | SERVICING OF MAIN ISO VALVE SD-1 SD-10 |
| 53 | SERVICING OF VALVE MST LINE MS123 124 |
| 54 | SERVICING BYPASS VALVE MST MS-125 126 |
| 55 | SERVICING OF BYPASS VALVE OF FEED STN |
| 56 | SERVICING OF DRUM SAFETY VALVES |
| 57 | SERVICING OF ERV## |
| 58 | SERVICING OF CRH & HRH SAFETY VALVES |
| 59 | SERVICING OF SAFETY VALVE SOOT BLOWER |
| 60 | SERVICING HP VALVE/NRV BOILER 10-100MM |
| 61 | SERVICING VALVES OIL STATION AB /CD/ EF |
| 62 | SERVICING OIL LINE VALVE NRV OIL STATION |
| 63 | SERVICING PNEUMATIC VALVE 150-300MM PRDS |
| 64 | SERVICING MOTORIZED VALVE 100-300MM PRDS |
| 65 | SERVICING MOTORIZED VALV NB- 50MM PRDS |
| 66 | SERVICING PNEUMATIC VALVE 50-100M BOILER |
| 67 | SERVICING HO VALVE/NRV 150-250MM BOILER |
| 68 | SERVICING HO VALVE/NRV 300-350MM BOILER |
| 69 | SERVICING STEAM VALVES & NRV PRDS LINE |
| 70 | REPLACE FLANGE GASKETS OF VALVE & FLANGE |
| 71 | REPLACEMENT OF GLAND PACKING |
| 72 | ATTENDING LEAKAGES OF PIPELINE & HEADERS |
| 73 | SERVICING OF SAFETY VALVE OF AUX. PRDS |
| 74 | REPLACEMENT OF PIPE DIA. 10 MM TO 40MM. |
| 75 | ATTENDING MINOR LEAKAGE FROM PIPE, BEND |
| 76 | REPLACEMENT OF GASKET MANHOLE OF BOILER |