| 1 | (A) EQUIPMENT - MPS 56 MLD |
| 2 | 12KV HT Panel ,800amp,20KIncomer Make-ABBRepair/ overhaul works with protection relay replacement and control wiring correction/change to make it working and testing and calibration required |
| 3 | HT Pan12KV HT Panel ,800amp,20K Make-ABB VCB, traffofeeder -1Repair/ overhaul works with protection relay replacement and control wiring correction/change to make it working and testing and calibration required |
| 4 | HT 12KV HT Panel ,800amp,20K Make-ABB VCB Traffofeeder -2Repair/ overhaul works with protection relay replacement and control wiring correction/change to make it working and testing and calibration required |
| 5 | Transformer-1 1600 KVARepair/ overhaul works required. Replacement of OTI, WTI & Buchholz Relay is necessary. |
| 6 | Transformer-2 1600 KVARepair/ overhaul works required. Replacement of OTI, WTI & Buchholz Relay is necessary. |
| 7 | PLC Section-I/O Card replacement required along with SCADA licence for make it in working condition. |
| 8 | Raw Sewage Pump-1(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation. |
| 9 | Raw Sewage Pump-2(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation. |
| 10 | Raw Sewage Pump-3(160 HP), 1166M3/HR, Head-24M, Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation. (Pump is sent for repair & Maintenance as told by authorities of GDA) |
| 11 | Raw Sewage Pump-4(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of metering considered for trouble free operation. |
| 12 | Raw Sewage Pump-5(160 HP)Repair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation. |
| 13 | Raw Sewage Pump-6(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation. |
| 14 | MPS EOT CraneRepairing & complete overhauling required with motor replacement and preventive repair along with replacement of critical parts |
| 15 | APFC PANEL-1Replacement of weak capacitor and contactors with non functioning relays |
| 16 | APFC PANEL-2Replacement of weak capacitor and contactors with non functioning relays |
| 17 | (B) EQUIPMENT - STP 56 MLD |
| 18 | Mechanical Fine Bar Screen ARepairing & complete overhauling required with panel replacement and level sensor replacement considered for trouble free operation. |
| 19 | Mechanical Fine Bar Screen BRepairing & complete overhauling required with panel replacement along with replacement of hydraulic cylinder, level sensors, spring, locks, rollers, bearings and panel component with wiring as well as cabinet considered for trouble free operation. |
| 20 | Belt Conveyor Fine Bar Screen Re-wiring and new enclosure considered.Gear-Box overhaul required,Replacement of gear &motor cover with canopy. |
| 21 | Grit scrapper motor ARepalcement of Chain with sprocket, scrapper body crack and need to repair of gear box foudation condition is not good,LPB is not working,flow-diverter valve also broken condition. |
| 22 | Grit scrapper motor BRepalcement of Chain with sprocket, scrapper body crack and need to repair of gear box foudation condition is not good,LPB is not working,flow-diverter valve also broken condition. |
| 23 | Grit Classifier AReplacement of faulty Switch gear+ wiring considered.Classifier is not working properly as grit is not lifting,gap is more between classifier screw and bottom surface.Canaopy is not available for motor.LPB is not working. |
| 24 | Grit Classifier BReplacement of faulty Switch gear+ wiring considered.Classifier is not working properly as grit is not lifting,gap is more between classifier screw and bottom surface.Canaopy is not available for motor.LPB is not working. |
| 25 | Organic Return pump AReplacement of faulty switch gear cost +wiring considered. Bearing issues so vibration and noise is higher side,Discharge line also chocked/LPB is not working, |
| 26 | Organic Return pump BReplacement of faulty switch gear cost +wiring considered. Bearing issues so vibration and noise is higher side,Discharge line also chocked/LPB is not working, |
| 27 | Air Blower 1, Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor. Make-Swam (VFD Operated)Repair & overhauling of critical parts along with replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation. |
| 28 | Air Blower 2, Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor. Make-SwamRepair & overhauling of critical parts along with replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation. |
| 29 | Air Blower 3, Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor. Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Exhaust fan is not working. Cooling fan panel is not working. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation. |
| 30 | Air Blower 4, , Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor . Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Exhaust fan is not working. Cooling fan panel is not working. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation. |
| 31 | Air Blower 7, , Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor . Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Exhaust fan is not working. Cooling fan panel is not working. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation. |
| 32 | Air Blower 8, , Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor . Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation. |
| 33 | Blower vent valve 2 (MOV)Actuator repairing & wiring work considered for making it functional. |
| 34 | Blower vent valve 3 (MOV)Actuator repairing & wiring work considered for making it functional. |
| 35 | Blower vent valve 4 (MOV)Actuator is missing so new actuator need to be considered & wiring work considered for making it functional. |
| 36 | Blower vent valve 6 (MOV)Actuator repairing & wiring work considered for making it functional. |
| 37 | Surplus Activated Sludge Pump 3 (SAS)Replacement of faulty switchgear, Local push button (LPB) and wiring work considered. |
| 38 | Surplus Activated Sludge Pump 4 (SAS)Replacement of faulty switchgear, Local push button (LPB) and wiring work considered. |
| 39 | Return Sludge pump 3Replacement of faulty switchgear, Local push button (LPB) and wiring work considered. |
| 40 | Sludge Feed pump 2Pump needs to be replaced with new one. Overhauling of motor if required. |
| 41 | Sludge Feed pump 3Pump needs to be replaced with new one. Overhauling of motor if required. |
| 42 | PAV Valve 2Preventive repair required along with replacement of damaged worm gear teeth with new one. |
| 43 | SBR selector zone & BasinFine bubble difusers 15% replacement with new one in 04 Nos. reactor basin and erection with saddle etc. along with proper dewatering of basin during erection and successfully testing. |
| 44 | Centrifuge 1. Model -ALDEC-45. Coupled motor -30 KW.Overhauling required starter, switch gear replacement with servicing of tripping sensor, ammeter & overload protection relay as such they are defunct at the moment. |
| 45 | Centrifuge 2. Model -ALDEC-45. Coupled motor -30 KW.Overhauling required starter, switch gear replacement with servicing of tripping sensor, ammeter & overload protection relay as such they are defunct at the moment. |
| 46 | Centrifuge 3. Model -ALDEC-45. Coupled motor -30 KW.Overhauling required starter, restoration of control supply, switch gear replacement with servicing of tripping sensor, ammeter & overload protection relay as such they are defunct at the moment. |
| 47 | Chlorine Tonners filling - 06 No. tonners are empty. Refilling of tonners with all freight and transit charges is considered. |
| 48 | Connection in between frontal hoods and header pipe by 100mm. PVC pipe with required fitting & fitments. |
| 49 | Blower Room Acoustic Hood Exhaust Fan -1 ,2,3,4,5,6,7 (16 Inch)Repairing / overhauling required |
| 50 | Blower Room Acoustic Hood Exhaust Fan -8(16 Inch)01 No. new exhaust fan is considered. |
| 51 | HT Room Exhaust Fan -2 (20 Inch)Preventive maintenance and critical part replacement work considered for trouble free operation |
| 52 | MCC-3 Exhaust Fan (20 Inch)Preventive maintenance and critical part replacement work considered for trouble free operation |
| 53 | MS pipe 200NB damaged at each connection of Air header from Main air distribution pipe at SBR.- (Length= 150 m.)- Underground pipe line need to be replaced with M.S. pipe with erection work along with fitting and wrapping coating including commissioning and erection charges complete in all respect. |
| 54 | Air blower discharge underground pipe line(600 NB) damaged at several points. Leakage observed at several points.(Length= 60 m.) Underground pipe line need to be replaced with M.S. pipe with erection work along with fitting and wrapping coating including commissioning and erection charges complete in all respect. |
| 55 | Laboratiory EquipmentsLaboratory Equipments & Glassware: Replacement ofCOD Digestor & Water Bath which are being Non-Functional along with required Chemicals and consumbales. Dedicated Lab Refrigerator is also provided as of suitable capacity. |
| 56 | ELECTRICAL & INSTRUMENTATION |
| 57 | Scada systemOnly SBR Tank process is in automation except the automation of all D.O. analysers. Other section working in manual mode. SBR Technology provider (C-TECH) shall entertained the work related to automation of instruments, analysers and other necessary equipments by linking them to PLC section and make programmable with all required accessories and manpower. |
| 58 | Incomer VCB12KV HT Panel ,800amp,20K Make-ABB.Relay calibration,programming and VCB service work is considered. HT breaker testing and overhauling, CRM testing, |
| 59 | HT Panel12KV, VCB,800amp,20K Make-ABB traffic-feeder -1Relay calibration,programming and VCB service work is considered. HT breaker testing and overhauling, CRM testing. Replacement of multi function meter. |
| 60 | HT panel 12KV, VCB 800amp,20K Make-ABB Traffo-feeder -2Relay calibration,programming and VCB service work is considered. HT breaker testing and overhauling, CRM testing, |
| 61 | Transformer-1 1600 KVAReplacement cost of OTI, WTI & Buchholz Relay is considered. |
| 62 | Transformer-2 1600 KVAReplacement cost of OTI, WTI & Buchholz Relay is considered. |
| 63 | ACB FOR I/C-1 (2500 A)ACB feeder servicing work along with Relay testing and calibration,breaker testing and overhauling, CRM testing. |
| 64 | ACB FOR I/C-2 (2500 A)ACB feeder servicing work along with Relay testing and calibration,breaker testing and overhauling, CRM testing. |
| 65 | ACB FOR BUSCOUPLER (2500A)ACB feeder servicing work along with Relay testing and calibration,breaker testing and overhauling, CRM testing. |
| 66 | APFC panel 1 (550 KVAR)Complete servicing or overhauling of panel is considered to make it operational. |
| 67 | APFC panel 2 (100 KVAR)Complete servicing or overhauling of panel is considered to make it operational. Replacement of cooling fan |
| 68 | Incoming ACB -1 (800A) For MCC-1Repair & overhauling work with replacement of critical parts such as shut coil protection relays, MFM etc. complete in every aspect for trouble free operation. |
| 69 | Outgoing ACB 1000A for 750 KVA DGRepair & overhauling work with replacement of critical parts such as shut coil protection relays, MFM etc. complete in every aspect for trouble free operation. |
| 70 | DO AnalyserReplacement with new ones along with erection ofcomplete equipment with panel to make it operational. |
| 71 | Decanter Level sensor 1New level sensor considered along with erection. |
| 72 | Decanter Level sensor 2New level sensor considered along with erection. |
| 73 | Decanter Level sensor 3New level sensor considered along with erection. |
| 74 | Decanter Level sensor 4New level sensor considered along with erection. |
| 75 | Flow meter at Inlet.Factory calibration considered along with erection. |
| 76 | Eye-Shower of chlorine house, Total = 02 nos.New system to be installed for both cases |
| 77 | Cable Tray Perforated, MOC-G.I.Servicing or replacement of damaged cable trays at some places. |