Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #37914464

Tender For Restoration And Rehabilitation Of Electrical And Mechanical Works At 56 Mld Mps And 56 Mld Stp Sbr Technology In Indirapuram Ghaziabad

Issued by Government Departments · indirapuram, Uttar Pradesh
Tender Value
1.40 Crore
Estimated cost
Bid Submission
22 Jun 2023
0 days left
EMD
2.81 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
indirapuram → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Restoration And Rehabilitation Of Electrical And Mechanical Works At 56 Mld Mps And 56 Mld Stp Sbr Technology In Indirapuram Ghaziabad

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 13-Jun-2023 Corrigendum Date 16-Jun-2023
2 16-Jun-2023 Corrigendum-2 Date 22-Jun-2023

BOQ

Name of Work:“Restoration & Rehabilitation of Electrical & Mechanical works lying in disorder due to ailing equipments at 56 MLD MPS & 56MLD STP (SBR Technology) in Indirapuram, Ghaziabad currently running under the supervision and limit of G.D.A., Ghaziabad in Deposite Programme.”
Sl. No. Item Description
1(A) EQUIPMENT - MPS 56 MLD
212KV HT Panel ,800amp,20KIncomer Make-ABBRepair/ overhaul works with protection relay replacement and control wiring correction/change to make it working and testing and calibration required
3HT Pan12KV HT Panel ,800amp,20K Make-ABB VCB, traffofeeder -1Repair/ overhaul works with protection relay replacement and control wiring correction/change to make it working and testing and calibration required
4HT 12KV HT Panel ,800amp,20K Make-ABB VCB Traffofeeder -2Repair/ overhaul works with protection relay replacement and control wiring correction/change to make it working and testing and calibration required
5Transformer-1 1600 KVARepair/ overhaul works required. Replacement of OTI, WTI & Buchholz Relay is necessary.
6Transformer-2 1600 KVARepair/ overhaul works required. Replacement of OTI, WTI & Buchholz Relay is necessary.
7PLC Section-I/O Card replacement required along with SCADA licence for make it in working condition.
8Raw Sewage Pump-1(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation.
9Raw Sewage Pump-2(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation.
10Raw Sewage Pump-3(160 HP), 1166M3/HR, Head-24M, Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation. (Pump is sent for repair & Maintenance as told by authorities of GDA)
11Raw Sewage Pump-4(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of metering considered for trouble free operation.
12Raw Sewage Pump-5(160 HP)Repair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation.
13Raw Sewage Pump-6(160 HP), Make AquaRepair/ overhaul including S.S. lifting system and Replacement of soft starter module and displayconsidered for trouble free operation.
14MPS EOT CraneRepairing & complete overhauling required with motor replacement and preventive repair along with replacement of critical parts
15APFC PANEL-1Replacement of weak capacitor and contactors with non functioning relays
16APFC PANEL-2Replacement of weak capacitor and contactors with non functioning relays
17(B) EQUIPMENT - STP 56 MLD
18Mechanical Fine Bar Screen ARepairing & complete overhauling required with panel replacement and level sensor replacement considered for trouble free operation.
19Mechanical Fine Bar Screen BRepairing & complete overhauling required with panel replacement along with replacement of hydraulic cylinder, level sensors, spring, locks, rollers, bearings and panel component with wiring as well as cabinet considered for trouble free operation.
20Belt Conveyor Fine Bar Screen Re-wiring and new enclosure considered.Gear-Box overhaul required,Replacement of gear &motor cover with canopy.
21Grit scrapper motor ARepalcement of Chain with sprocket, scrapper body crack and need to repair of gear box foudation condition is not good,LPB is not working,flow-diverter valve also broken condition.
22Grit scrapper motor BRepalcement of Chain with sprocket, scrapper body crack and need to repair of gear box foudation condition is not good,LPB is not working,flow-diverter valve also broken condition.
23Grit Classifier AReplacement of faulty Switch gear+ wiring considered.Classifier is not working properly as grit is not lifting,gap is more between classifier screw and bottom surface.Canaopy is not available for motor.LPB is not working.
24Grit Classifier BReplacement of faulty Switch gear+ wiring considered.Classifier is not working properly as grit is not lifting,gap is more between classifier screw and bottom surface.Canaopy is not available for motor.LPB is not working.
25Organic Return pump AReplacement of faulty switch gear cost +wiring considered. Bearing issues so vibration and noise is higher side,Discharge line also chocked/LPB is not working,
26Organic Return pump BReplacement of faulty switch gear cost +wiring considered. Bearing issues so vibration and noise is higher side,Discharge line also chocked/LPB is not working,
27Air Blower 1, Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor. Make-Swam (VFD Operated)Repair & overhauling of critical parts along with replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation.
28Air Blower 2, Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor. Make-SwamRepair & overhauling of critical parts along with replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation.
29Air Blower 3, Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor. Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Exhaust fan is not working. Cooling fan panel is not working. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation.
30Air Blower 4, , Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor . Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Exhaust fan is not working. Cooling fan panel is not working. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation.
31Air Blower 7, , Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor . Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Exhaust fan is not working. Cooling fan panel is not working. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation.
32Air Blower 8, , Capacity -5500Cm3, 6000MMWC.Coupled with 160KW induction motor . Make-SwamRepair & overhauling of critical parts. Soft starter is defunct so starter display & ammeter need to be replaced. Oil leakage from body. Replacement of filters with coupling guards, blower hood make it operational considered for trouble free operation.
33Blower vent valve 2 (MOV)Actuator repairing & wiring work considered for making it functional.
34Blower vent valve 3 (MOV)Actuator repairing & wiring work considered for making it functional.
35Blower vent valve 4 (MOV)Actuator is missing so new actuator need to be considered & wiring work considered for making it functional.
36Blower vent valve 6 (MOV)Actuator repairing & wiring work considered for making it functional.
37Surplus Activated Sludge Pump 3 (SAS)Replacement of faulty switchgear, Local push button (LPB) and wiring work considered.
38Surplus Activated Sludge Pump 4 (SAS)Replacement of faulty switchgear, Local push button (LPB) and wiring work considered.
39Return Sludge pump 3Replacement of faulty switchgear, Local push button (LPB) and wiring work considered.
40Sludge Feed pump 2Pump needs to be replaced with new one. Overhauling of motor if required.
41Sludge Feed pump 3Pump needs to be replaced with new one. Overhauling of motor if required.
42PAV Valve 2Preventive repair required along with replacement of damaged worm gear teeth with new one.
43SBR selector zone & BasinFine bubble difusers 15% replacement with new one in 04 Nos. reactor basin and erection with saddle etc. along with proper dewatering of basin during erection and successfully testing.
44Centrifuge 1. Model -ALDEC-45. Coupled motor -30 KW.Overhauling required starter, switch gear replacement with servicing of tripping sensor, ammeter & overload protection relay as such they are defunct at the moment.
45Centrifuge 2. Model -ALDEC-45. Coupled motor -30 KW.Overhauling required starter, switch gear replacement with servicing of tripping sensor, ammeter & overload protection relay as such they are defunct at the moment.
46Centrifuge 3. Model -ALDEC-45. Coupled motor -30 KW.Overhauling required starter, restoration of control supply, switch gear replacement with servicing of tripping sensor, ammeter & overload protection relay as such they are defunct at the moment.
47Chlorine Tonners filling - 06 No. tonners are empty. Refilling of tonners with all freight and transit charges is considered.
48Connection in between frontal hoods and header pipe by 100mm. PVC pipe with required fitting & fitments.
49Blower Room Acoustic Hood Exhaust Fan -1 ,2,3,4,5,6,7 (16 Inch)Repairing / overhauling required
50Blower Room Acoustic Hood Exhaust Fan -8(16 Inch)01 No. new exhaust fan is considered.
51HT Room Exhaust Fan -2 (20 Inch)Preventive maintenance and critical part replacement work considered for trouble free operation
52MCC-3 Exhaust Fan (20 Inch)Preventive maintenance and critical part replacement work considered for trouble free operation
53MS pipe 200NB damaged at each connection of Air header from Main air distribution pipe at SBR.- (Length= 150 m.)- Underground pipe line need to be replaced with M.S. pipe with erection work along with fitting and wrapping coating including commissioning and erection charges complete in all respect.
54Air blower discharge underground pipe line(600 NB) damaged at several points. Leakage observed at several points.(Length= 60 m.) Underground pipe line need to be replaced with M.S. pipe with erection work along with fitting and wrapping coating including commissioning and erection charges complete in all respect.
55Laboratiory EquipmentsLaboratory Equipments & Glassware: Replacement ofCOD Digestor & Water Bath which are being Non-Functional along with required Chemicals and consumbales. Dedicated Lab Refrigerator is also provided as of suitable capacity.
56ELECTRICAL & INSTRUMENTATION
57Scada systemOnly SBR Tank process is in automation except the automation of all D.O. analysers. Other section working in manual mode. SBR Technology provider (C-TECH) shall entertained the work related to automation of instruments, analysers and other necessary equipments by linking them to PLC section and make programmable with all required accessories and manpower.
58Incomer VCB12KV HT Panel ,800amp,20K Make-ABB.Relay calibration,programming and VCB service work is considered. HT breaker testing and overhauling, CRM testing,
59HT Panel12KV, VCB,800amp,20K Make-ABB traffic-feeder -1Relay calibration,programming and VCB service work is considered. HT breaker testing and overhauling, CRM testing. Replacement of multi function meter.
60HT panel 12KV, VCB 800amp,20K Make-ABB Traffo-feeder -2Relay calibration,programming and VCB service work is considered. HT breaker testing and overhauling, CRM testing,
61Transformer-1 1600 KVAReplacement cost of OTI, WTI & Buchholz Relay is considered.
62Transformer-2 1600 KVAReplacement cost of OTI, WTI & Buchholz Relay is considered.
63ACB FOR I/C-1 (2500 A)ACB feeder servicing work along with Relay testing and calibration,breaker testing and overhauling, CRM testing.
64ACB FOR I/C-2 (2500 A)ACB feeder servicing work along with Relay testing and calibration,breaker testing and overhauling, CRM testing.
65ACB FOR BUSCOUPLER (2500A)ACB feeder servicing work along with Relay testing and calibration,breaker testing and overhauling, CRM testing.
66APFC panel 1 (550 KVAR)Complete servicing or overhauling of panel is considered to make it operational.
67APFC panel 2 (100 KVAR)Complete servicing or overhauling of panel is considered to make it operational. Replacement of cooling fan
68Incoming ACB -1 (800A) For MCC-1Repair & overhauling work with replacement of critical parts such as shut coil protection relays, MFM etc. complete in every aspect for trouble free operation.
69Outgoing ACB 1000A for 750 KVA DGRepair & overhauling work with replacement of critical parts such as shut coil protection relays, MFM etc. complete in every aspect for trouble free operation.
70DO AnalyserReplacement with new ones along with erection ofcomplete equipment with panel to make it operational.
71Decanter Level sensor 1New level sensor considered along with erection.
72Decanter Level sensor 2New level sensor considered along with erection.
73Decanter Level sensor 3New level sensor considered along with erection.
74Decanter Level sensor 4New level sensor considered along with erection.
75Flow meter at Inlet.Factory calibration considered along with erection.
76Eye-Shower of chlorine house, Total = 02 nos.New system to be installed for both cases
77Cable Tray Perforated, MOC-G.I.Servicing or replacement of damaged cable trays at some places.

AI Tender Summary

OUR REF NO 37914464
AUTHORITY Government Departments
TENDER VALUE 1.40 Crore
LAST DATE 22-06-2023
Authority
Authority Name Uttar Pradesh Jal Nigam
Work Description Restoration And Rehabilitation Of Electrical And Mechanical Works At 56 Mld Mps And 56 Mld Stp Sbr Technology In Indirapuram Ghaziabad
Basic Detail
Tender No NIT No. 310 / Nivida / 33 Dated 23-05-2023
Bidding Type Tender
Location
City indirapuram
State Uttar Pradesh
Key Dates
Publish Date 16 Jun 2023
Submission Date 22 Jun 2023
Open Date 23 Jun 2023
Finance
Tender Value 1.40 Crore
Tender Fee 11800
EMD 2.81 Lakhs
Exemption Not Available
Document List
44a21334-3b03-4b6a-93e2-4fdbf5184f20.html
BOQ_1351486.xls
Tenderdoc.pdf.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 16, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 16, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 22, 2023
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jun 22, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 23, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

44a21334-3b03-4b6a-93e2-4fdbf5184f20.html

xls

BOQ_1351486.xls

pdf

Tenderdoc.pdf.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders