| 1 | Earth work in Excavation in foundation in ordinary soil (loam clay, or sand) including lift upto 1.5 metre and lead upto 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space bwtween the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge of 30 m from the foundation trenches.si 251 ch-4 page 27 |
| 2 | Providing and injecting chemical for pre-constructional antitermite treatment and creating and chemical barrier under and around the column pitt wall. CH.08 |
| 3 | Providing and laying cement concrete in 1:6:12 (1Cement : 6 Coarse Sand : 12 Graded Stone aggregate 40mm nominal size) including supply of all materials, labour and T & P etc. required for comletion of work and curing complete, including cost of form work. In foundation and floors. Same as above but in 40mm Brick Ballast Sl. 273 |
| 4 | RCC Work Providiing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering fininshing and excluding reinforcement - All work upto plinth level in 1:1.5:3 (1Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) SL. Ch-5 287 + (289-288) |
| 5 | RCC Work with cement approved coarse sand 2cm gauge approved stone ballast in 1:1.5:3 (1 cement : 1.5 coarse sand: 3 stone ballast) in columns including all material labour T & P but excluding supply of reinforcement and its bendiing the same with 24 BWG binding wire necessary centering and shuttering etc. Sl. 289 CH-5 |
| 6 | RCC Work with cement approved coarse sand 2cm gauge approved stone ballast in 1:1.5:3 (1 cement : 1.5 coarse sand: 3 stone ballast) in beam including all material labour T & P but excluding supply of reinforcement and its bendiing the same with 24 BWG binding wire necessary centering and shuttering etc. Sl. 289 CH-5 |
| 7 | RCC Work with cement approved coarse sand 2cm gauge approved stone ballast in 1:1.5:3 (1 cement : 1.5 coarse sand: 3 stone ballast) in columns including all material labour T & P but excluding supply of reinforcement and its bendiing the same with 24 BWG binding wire necessary centering and shuttering etc. Sl. 289 CH-5 |
| 8 | RCC Work with cement approved coarse sand 2cm gauge approved stone ballast in 1:1.5:3 (1 cement : 1.5 coarse sand: 3 stone ballast) in slab including all material labour T & P but excluding supply of reinforcement and its bendiing the same with 24 BWG binding wire necessary centering and shuttering etc. Sl. 283 CH-5 |
| 9 | Mild steel or Iron in plain work such as reinforced concrete or reinforced brick work (when not wroughtto included in an over all rates) wrought to required shape as necessary including bending for proper completion of work andincluding supply of steel its wastage bends, hooks and authorised over lapping shall be measured upto floor two level (S.I.No. 504) .ch-10 page 29 |
| 10 | Class-150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of work sl. 303 (305A-305) CH-6 |
| 11 | Earth work in filling with carted earth including cost of earth loading unloading and dressing etc complete. As per AR |
| 12 | Sand filling in plinth including supply of necessary quantity of lacel sand from a distance not exceeding 8 kms from the site of work and including watering dressing etc. required for proper completion of work sl. 255 ch-4 |
| 13 | Class-150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of work sl. 303 (305A-305) CH-6 |
| 14 | 12 mm thick plaster 1:6 cement and corase sand mortar including supply of all material labour T&P etc.as perch-13 ,13.1 |
| 15 | 15 mm thick plaster 1:6 cement and corase sand mortar including supply of all material labour T&P etc.as perch-13 ,13.1 |
| 16 | Providing and laying vertified tiles in floor with out lean concreteof 600x600 mm size (thickness 10 mm ), withwater absorption less than 0.08% and confirming to IS 156522 , of approovedbrand & manufacturer,in desired colours and shades, laid with cement based high polymer modified quick set tile adhesive water (based) confirming to IS:15477 , including grouting of joints yI/c.rubbing & polishing complete as par new item.ch.-14si.11.41A |
| 17 | Cement concrete flooring 1:2:4 |
| 18 | Finishing walls with putty and approved brand and manufacture and of required shade on undacoated wall surface to give even shade over including curing and cost all material,, labour. |
| 19 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on coated wall surface to give even shade over @1.25Ltr/10sqm including one coat of primer applied @ 0.75Ltr/10sqm coat curing and cost of all material, labour |
| 20 | Earrth work in cutting or In embankment Filling In ordinary soll, excavation to be in the form of regular pits not exceeding 1/2 metre (20\") in depth and earthwork in embankment to be in 20 cm (8\") layers, including ramming and dressing the surface to be required levels and slops and also including 1.5 metre (5 fts) lifts and 30 m. (100\") lead. The earth from cutting to be used in making filling or to be disposlted as spoil banks within 30 metres (100 fts) distance as directed by engineer-in-charge. (Rate is Including Royality.) SI253 |
| 21 | Laying and consolidation of av 10cm. Loss 45-63 mm gauge granite stone ballast with 21% stone dust by road roller including supply all materals labour And T&P. |
| 22 | Providing and laying 80mm thick I shaped interlocking cement concrete brick laid on 125 mm GSB with sand filling etc including complete withh all material labour .MORD 1500(6.7) CH-26,SI.22 |
| 23 | Steel work built tubular (round and square or rectangular hollow tubes etc.) trusses etc. CH.10,s.l. 10.16.1 |
| 24 | Garden Chairs as per MR |
| 25 | LED Solarmax. 12W |
| 26 | Culture Board ofstone with written work ,T & F . |
| 27 | Supply and fixing of electronic fan regulater (modular) 120-280V isi marked on the existing switch bourd including making connection complete in all respect.1203C |
| 28 | S/F of LED tube light with batten suitable for up to 1X22 watt. LEDtube light complete including tube etc on surface complete in all respect. CAT-AAA 1413 |
| 29 | S/F of 40 Amp DP MCB (10 KA). C Curve, CAT- A1010 |
| 30 | S/F of 6 Amp-32 Amp SP MCB (10 KA). C Curve, CAT -A 1002 |
| 31 | S/Wiring of submain with 2 nos. 2.5 sq. mm. FRLSH PVC insulated 1100 V grademultistrand single core copper conductor cable in 20 mm dia heavy duty (2 mm thick) PVC conduit with 1no.1.5 sq. mm Sl 1304c |
| 32 | Wiring point for light with 1.5 sqmm P.V.C. insulated multistrand copper conductor cable in PVC concealed in wall. Complete with 1.5 sq. mm FRPVCinsulated multistrained copper earth continuity wire tc complete in all respects as directed including matching colour wash. add for modular type switch in place of piano type switch. 122c- |
| 33 | Supply and fixing of batten/angle holder complete in all respects Sl 405 |
| 34 | S/F Socket 5pin6A Shuttered socket(M.R.Orient) |
| 35 | S/F Switch 10A 1 way (M.R. Orient) |
| 36 | S/F12M combined cover plate White (M.R. Orient) |
| 37 | S/F indicator lamp |
| 38 | S/F Plastic box 12 module (M.R. Orient) |
| 39 | S/F 8M combined cover plate White (M.R. Orient) |
| 40 | S/F Plastic box 8 module (M.R. Orient) |
| 41 | MCB Distribution box 8way (M.R. Orient) |