|
| 1 | MATERIALS |
| 2 | Distribution Box LT Outdoor 4 Way 200 A |
| 3 | End Cap for ABC 50 Sq mm |
| 4 | End Cap for ABC 70 Sq mm |
| 5 | IPC FOR LT ABC3X70+1X50+1X16 Tap4 - 50 sq .mm |
| 6 | IPC for LT ABC 3X70 + 1X50 + 1X16 Tap 16-70sqmm |
| 7 | IPC FOR LT ABC3X70+1X50+1X16 Tap1.5 - 10 sq .mm |
| 8 | INSULATION TAPE for ABC |
| 9 | Cable Tie UV Plastic Heavy Duty 250 mm Length |
| 10 | Earthing set (spiral) |
| 11 | Satellite connector – Main : 16 sq mm to 95 sq mm; Tap :1.5 sq mm to 35 sq mm (4 way) |
| 12 | Pre-Insulated Midspan Joints and Terminal Lugs 70 Sq.mm |
| 13 | Pre- Insulated Crimping Socket Palm Type 70 Sq.mm-Bimetallic (For ABC) |
| 14 | Pre- Insulated Crimping Socket Palm Type 16 Sq.mm-Bimetallic (For ABC) |
| 15 | Pre- Insulated Crimping Socket Palm Type 50 Sq.mm -Bimetallic (For ABC) |
| 16 | IPC FOR ABC 3X95+1X70+1X16 Tap 4-16sqmm |
| 17 | Pre-Insulated Midspan Joints and Terminal Lugs 16 Sq.mm |
| 18 | Anchoring /Dead end Clamp Assembly for LT AB Cables up to 50 sq.mm |
| 19 | Suspension Clamp Assembly for LT AB Cables up to 50 sq.mm |
| 20 | Stainless Steel Strap [20 mm x 0.7 mm] |
| 21 | Stainless steel Buckles [20.5 mm x 1.5 mm; thickness 1.2 mm] |
| 22 | Cable 1.1kV PVC AL 3.5c x 16 sq mm (Un Armoured) |
| 23 | Aerial Bunched Cable LT 3x70 + 1x50 + 1x16 sq.mm (Insulated Messenger) |
| 24 | End Cap for ABC 16 Sq mm |
| 25 | Pre-Insulated Midspan Joints and Terminal Lugs 50 Sq.mm |
| 26 | LABOURS |
| 27 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 28 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70+ 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 29 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 30 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 31 | Fitting of one No. pole top service connection box of standard size (up to 4 way) using ss strap/B&N of suitable size in to the PSC/A poles at the standard height excluding giving connections |
| 32 | Providing End Caps |
| 33 | Installation of Insulation piercing connector for main to service line main :25-95 sqmm, Tap : 25-95 sqmm |
| 34 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 35 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 36 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 37 | Erection of suspension clamp for LT ABC of any size |
| 38 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 39 | Installation of Pre-insulated straight through joints for 50sqmm cable |
| 40 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 41 | Installation of Pre-insulated lugs for 16sqmm |
| 42 | Installation of Pre-insulated lugs for 50sqmm |
| 43 | Installation of Pre-insulated lugs for 70sqmm |
| 44 | Providing Cable Tie |
| 45 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 46 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 47 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
| 48 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 49 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 50 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 51 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 52 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 53 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 54 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 55 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 56 | Providing Stay for LT poles incl. digging & back filling pit. |