National Thermal Power Corporation Limited has published Tender For Revised Grid Complience System Study In Ntpc And Ngel Spv Plant(S). Submission Date for this Tender is 05-07-2023. Solar Power Plants Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 09-Jun-2023 | CARIFICATION1 | Technical Bid | 14-06-2023 |
2 | 09-Jun-2023 | CLRF-02 | Technical Bid | 14-06-2023 |
3 | 14-Jun-2023 | EXTN1 | Date | 28-06-2023 |
4 | 22-Jun-2023 | CLRF03 AND AMNDT01 | Technical Bid | 28-06-2023 |
5 | 28-Jun-2023 | BODEXTN2 | Date | 05-07-2023 |
Sl. No. | Item Description |
1 | NTPC Gandhar 20 MW Solar |
2 | REACTIVE CAPABILITY STUDY |
3 | POWER QUALITY STUDY |
4 | VOLTAGE RIDE THROUGH STUDY |
5 | NON-CONV. SOURCE FAULT CURRENT STUDY |
6 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
7 | POST COMMG PLANT MODEL VALIDATION REPORT |
8 | NTPC Auraiya Floating Solar 20 MW |
9 | REACTIVE CAPABILITY STUDY |
10 | POWER QUALITY STUDY |
11 | VOLTAGE RIDE THROUGH STUDY |
12 | NON-CONV. SOURCE FAULT CURRENT STUDY |
13 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
14 | POST COMMG PLANT MODEL VALIDATION REPORT |
15 | NTPC Solapur 23 MW Solar |
16 | REACTIVE CAPABILITY STUDYSANJEEVSINGH05@ |
17 | POWER QUALITY STUDY |
18 | VOLTAGE RIDE THROUGH STUDY |
19 | NON-CONV. SOURCE FAULT CURRENT STUDY |
20 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
21 | POST COMMG PLANT MODEL VALIDATION REPORT |
22 | NTPC Simhadri Floating Solar 25 MW |
23 | REACTIVE CAPABILITY STUDY |
24 | POWER QUALITY STUDY |
25 | VOLTAGE RIDE THROUGH STUDY |
26 | NON-CONV. SOURCE FAULT CURRENT STUDY |
27 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
28 | POST COMMG PLANT MODEL VALIDATION REPORT |
29 | NTPC Kawas 56 MW Solar |
30 | REACTIVE CAPABILITY STUDY |
31 | POWER QUALITY STUDY |
32 | VOLTAGE RIDE THROUGH STUDY |
33 | NON-CONV. SOURCE FAULT CURRENT STUDY |
34 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
35 | POST COMMG PLANT MODEL VALIDATION REPORT |
36 | NTPC Kayamkulam-Floating Solar 92 MW |
37 | REACTIVE CAPABILITY STUDY |
38 | POWER QUALITY STUDY |
39 | VOLTAGE RIDE THROUGH STUDY |
40 | NON-CONV. SOURCE FAULT CURRENT STUDY |
41 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
42 | POST COMMG PLANT MODEL VALIDATION REPORT |
43 | NTPC Ramagundam Floating Solar 100 MW |
44 | REACTIVE CAPABILITY STUDY |
45 | POWER QUALITY STUDY |
46 | VOLTAGE RIDE THROUGH STUDY |
47 | NON-CONV. SOURCE FAULT CURRENT STUDY |
48 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
49 | POST COMMG PLANT MODEL VALIDATION REPORT |
50 | NGEL Devikot Solar-I & II240 MW |
51 | REACTIVE CAPABILITY STUDY |
52 | POWER QUALITY STUDY |
53 | VOLTAGE RIDE THROUGH STUDY |
54 | NON-CONV. SOURCE FAULT CURRENT STUDY |
55 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
56 | POST COMMG PLANT MODEL VALIDATION REPORT |
57 | NGEL Shimboo Ka Burj Solar-I250 MW |
58 | REACTIVE CAPABILITY STUDY |
59 | POWER QUALITY STUDY |
60 | VOLTAGE RIDE THROUGH STUDY |
61 | NON-CONV. SOURCE FAULT CURRENT STUDY |
62 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
63 | POST COMMG PLANT MODEL VALIDATION REPORT |
64 | NGEL Fatehgarh Solar 296 MW |
65 | REACTIVE CAPABILITY STUDY |
66 | POWER QUALITY STUDY |
67 | VOLTAGE RIDE THROUGH STUDY |
68 | NON-CONV. SOURCE FAULT CURRENT STUDY |
69 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
70 | POST COMMG PLANT MODEL VALIDATION REPORT |
71 | NGEL Nokhra Solar 300 MW |
72 | REACTIVE CAPABILITY STUDY |
73 | POWER QUALITY STUDY |
74 | VOLTAGE RIDE THROUGH STUDY |
75 | NON-CONV. SOURCE FAULT CURRENT STUDY |
76 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
77 | POST COMMG PLANT MODEL VALIDATION REPORT |
78 | NGEL Shimboo Ka Burj Solar-II300 MW |
79 | REACTIVE CAPABILITY STUDY |
80 | POWER QUALITY STUDY |
81 | VOLTAGE RIDE THROUGH STUDY |
82 | NON-CONV. SOURCE FAULT CURRENT STUDY |
83 | ACTIVE AND REACTIVE POWER RESPONSE TEST |
84 | POST COMMG PLANT MODEL VALIDATION REPORT |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail