| 1 | DSR 20182.31 Cleaning jungle, brushes including uprooting of rank vegetations, grass bush wood tree & sapling of gift up to 30 cm. removal or rubbish up to a distance of 50 cm. outside the periphery of areas cleared. |
| 2 | DSR 20182.32 Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 3 | DSR 20181.1Carrage of material up to 04 km by mechanical transport including loading unloading and stacking |
| 4 | DSR 2018 1.1.2Earth |
| 5 | DSR 20182.6 Earth work in excavation over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal ofexcavated earth, lead up to 50m and lift up to 1.5m; disposed earth to be levelled and neatly dressed |
| 6 | DSR 20182.6.1All kinds of soil |
| 7 | Attending petty maintenance services like Plumber services, Mason services, Carpenter services, Welder services, required as below for 8, hours. |
| 8 | Welder, Mason, Carpenter, Plumber1st class. |
| 9 | Beldar |
| 10 | DSR 201816.6 Supplying, stacking and Spreading 6 mm thick red bajri, watering and rolling complete including preparation of the surface and rolling |
| 11 | With road roller/ hand roller |
| 12 | DSR 201816.73Dry stone pitching 22.5cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20cm including preparing the bedding surface etc. all complete.(Payment for Stone to be made separately) |
| 13 | DSR 2018 16.72 Supplying and stacking of hard stone (for stone pitching) 22.5 cm thick at site. |
| 14 | DSR 20184.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level |
| 15 | DSR 20184.1.3 1:2:4 (1 Cement : 2 coarse sand : 4 graded stoneaggregate 20 mm nominal size) |
| 16 | DSR 20184.1.8 1:4:8 (1 Cement : 4 coarse sand : 8 graded stoneaggregate 40 mm nominal size) |
| 17 | DSR 20185.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets,columns, pillars, piers, abutments, posts and struts, etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : |
| 18 | DSR 20185.2.2 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 19 | DSR 20185.9 Centering and shuttering including strutting, propping etc. andremoval of form for : |
| 20 | DSR 20185.9.1 Foundations , Footings, bases for columns |
| 21 | DSR 20185.22 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. |
| 22 | DSR 20185.22.3 Cold twisted bars |
| 23 | DSR 20186.1 Brickwork with common burnt clay FPS(non-modular) bricks of class designation 7.5 in foundation and plinth: |
| 24 | DSR 20186.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 25 | DSR 20186.4 Brickwork with common burnt clay FPS(non-modular) bricks of class designation 7.5 in super structure above plinth level up to floor v level in all shapes and size |
| 26 | DSR 20186.4.2 Cement mortar 1:6 (1:cement : 6coarse sand ) |
| 27 | DSR 20187.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with : |
| 28 | DSR 20187.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 29 | DSR 2018 14.1 Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead |
| 30 | DSR 2018 14.1.2 With cement mortar 1:4(1cement :4 coarse sand) |
| 31 | DSR No.16.3-Supplying and stacking at site |
| 32 | DSR No.16.3.2-63 mm to 45 mm size stone aggregate |
| 33 | DSR No.16.3.10-Moorum |
| 34 | DSR No.16.4-Laying spreading and compaction stone aggregate of specified sizes to water bound macadam specification including in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tone in stages to proper grade and camber, applying and broomingrequisite type of stone screeningand blinding material including to fill up interstices of coarse aggregate water and compacting to the required density. |
| 35 | Providing and placing in position mechanically woven double twisted hexagonal shaped, zinc plus aluminium alloy and PVC coated steel gabion units of mesh type 10x12 in accordance with international standard EN-10223, EN 10244 of following size:- |
| 36 | 1mx1mx1m |
| 37 | DSR 2018 10.22 Welding by Gas or electric plant including transportation of plant at site etc. complete |
| 38 | Provision of stone ballast for gabion box filling |
| 39 | Providing & Placing empty cement bag of approved quality filled with fly ash , mouth stitched as per direction as per direction of engineer in charge, including cost of all materials , labour T&P etc. required for proper completion of work. |
| 40 | Cleaning the Decantation well includingtaking out rubbish etc. Including all labour T&P etc required for proper completion work. |
| 41 | Engagement ofHydraulic Excavator / J.C.B machine for misc. Required work along with operator & fuel complete. The rate include all required T&P etc. For Hydraulic Excavator / J.C.B machineper hour. The time shall be calculated from starting the work at site. |
| 42 | Engagement oflight crane including cost of services of operating staff, Cost of lubricating oil, diesel / Petrol/ Kerosene oil , other consumables for running the plant and machinery for single shift of eight working hours. |
| 43 | Engagement of Tractor with trolley including cost of services of operating staff, Cost of lubricating oil, diesel / Petrol/ Kerosene oil , other consumables for running the plant and machinery for single shift of eight working hours. |
| 44 | Engagement of Dewatering pump setcap. 4000 lit. Per hour including cost of services of operating staff, Cost of lubricating oil, diesel / Petrol/ Kerosene oil , other consumables for running the plant and machinery for single shift of eight working hours. |
| 45 | Flat brick pitching with 25mm thick cement mrter 1:4 including filling the joint with same morter with fly ash bricks. |