Power Development Department has published Tender For Labour Rate Contract For The Financial Year 2023-24 For Material Handling Job & Allied Works Such As Loading, Un-Loading, Carriage, Verification And Stackingofline, Sub-Station Materials And Equipment Viz. Power & Distribution Transformers, Acs. Submission Date for this Tender is 09-06-2023. Labour Work Tenders in jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Poles: Unloading of Steel Tubular/ Cement Poles by Manual/ Mechanical means, verification and stacking of same. |
2 | ST Poles 8 Mtr |
3 | ST Poles 9 Mtr |
4 | ST Poles 11 Mtr |
5 | ST Poles 13 Mtr |
6 | PCC Poles 8 Mtr |
7 | PCC Poles 9 Mtr |
8 | PCC Poles 11Mtr |
9 | Poles: Carriage of Steel Tubular/ Cement Poles by Manual/ Mechanical means, from sacking site and loading of same on trucks |
10 | ST Poles 8 Mtr |
11 | ST Poles 9 Mtr |
12 | ST Poles 11 Mtr |
13 | ST Poles 13 Mtr |
14 | PCC Poles 8 Mtr |
15 | PCC Poles 9 Mtr |
16 | PCC Poles 11Mtr |
17 | Poles: Physical Verification, Carriage and Stacking Back Steel Tubular/Cement Poles |
18 | ST Poles 8 Mtr |
19 | ST Poles 9 Mtr |
20 | ST Poles 11 Mtr |
21 | ST Poles 13 Mtr |
22 | PCC Poles 8 Mtr |
23 | PCC Poles 9 Mtr |
24 | PCC Poles 11Mtr |
25 | Condcutor: Unloading of ACSR Conductor Drums by Mannual/Mechanical means, verification and storage of same |
26 | ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum |
27 | ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum |
28 | ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum |
29 | ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum |
30 | ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum |
31 | ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum |
32 | ACSR Zebra Conductor Avg 1.0 Km/Drum |
33 | Condcutor: Carriage of ACSR Conductor Drums from storage site to loading site and loading of same into truck |
34 | ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum |
35 | ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum |
36 | ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum |
37 | ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum |
38 | ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum |
39 | ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum |
40 | ACSR Zebra Conductor Avg 1.0 Km/Drum |
41 | Condcutor: Physical verification, carriage & stacking back ACSR Conductor |
42 | ACSR 0.02 Cond (Panther) Avg 1.3 Km/Drum |
43 | ACSR 0.02 Cond (Squirrel) Avg 11 Km/Drum |
44 | ACSR 0.03 Cond (Weasel) Avg 8.0Km/Drum |
45 | ACSR 0.01 Cond (Dog) Avg 2.5 Km/Drum |
46 | ACSR 0.5 Cond (Rabbit) Avg 5.0 Km/Drum |
47 | ACSR 0.15 Cond (Wolf) Avg 1.5 Km/Drum |
48 | ACSR Zebra Conductor Avg 1.0 Km/Drum |
49 | Transformers: Unloading of Transformers by Mannual/ Mechanical means, verification and carriage to storage site including storage of same |
50 | 10 MVA/33/11KV Power Transformers |
51 | 6.3 MVA/33/11KV Power Transformers |
52 | 10 MVA/66/11 KV Power Transformers |
53 | 3.15 MVA/33 KV Power Transformers |
54 | 630 KVA Distribution Transformers |
55 | 400 KVA Distribution Transformers |
56 | 250 KVA Distribution Transformers |
57 | 200 KVA Distribution Transformers |
58 | 100 KVA Distribution Transformers |
59 | 63 KVA Distribution Transformers |
60 | 25 KVA Distribution Transformers |
61 | Transformers: Carriage of Transformers from storage sie to loading site and laoding of same into truck. |
62 | 10 MVA/33/11KV Power Transformers |
63 | 6.3 MVA/33/11KV Power Transformers |
64 | 10 MVA/66/11 KV Power Transformers |
65 | 3.15 MVA/33 KV Power Transformers |
66 | 630 KVA Distribution Transformers |
67 | 400 KVA Distribution Transformers |
68 | 250 KVA Distribution Transformers |
69 | 200 KVA Distribution Transformers |
70 | 100 KVA Distribution Transformers |
71 | 63 KVA Distribution Transformers |
72 | 25 KVA Distribution Transformers |
73 | Transformers: Physical verification, carriage and stacking back transformers. |
74 | 10 MVA/33/11KV Power Transformers |
75 | 6.3 MVA/33/11KV Power Transformers |
76 | 10 MVA/66/11 KV Power Transformers |
77 | 3.15 MVA/33 KV Power Transformers |
78 | 630 KVA Distribution Transformers |
79 | 400 KVA Distribution Transformers |
80 | 250 KVA Distribution Transformers |
81 | 200 KVA Distribution Transformers |
82 | 100 KVA Distribution Transformers |
83 | 63 KVA Distribution Transformers |
84 | 25 KVA Distribution Transformers |
85 | Unloading of PVC / XLPE/LT/HT Aluminium Cable Drums by mannual/mechanical means, verification and carriage to storage site including storage of the same. |
86 | 95 sqmm 1 core PVC Cable |
87 | 120 sqmm 1 core PVC Cable |
88 | 185 sqmm 1 core PVC Cable |
89 | 240 sqmm 1 core PVC Cable |
90 | 300 sqmm 1 core PVC Cable |
91 | 400 sqmm 1 core PVC Cable |
92 | 630 sqmm 1 core PVC Cable |
93 | 400 sqmm XLPE Cable 11 KV Grade 3 Core |
94 | 300 sqmm XLPE Cable 11 KV Grade 3 Core |
95 | 240 sqmm XLPE Cable 11 KV Grade 3 Core |
96 | 185 sqmm XLPE Cable 11 KV Grade 3 Core |
97 | 120 sqmm XLPE Cable 11 KV Grade 3 Core |
98 | 11 KV Single Core XLPE 630 mmsq |
99 | 33 KV Single Core XLPE 630 mmsq |
100 | 185 mmsq 3.5 core PVC Cable |
101 | 300 mmsq 3.5 core PVC Cable |
102 | ABC 120 mmsq 5 Core PVC Cable |
103 | LT ABC 3Cx120 mmsq |
104 | LT ABC 3Cx50 mmsq |
105 | LT ABC 3Cx35 mmsq |
106 | LT ABC 3Cx25 mmsq |
107 | HT Cable 3Cx185 mmsq |
108 | HT Cable 3Cx120 mmsq |
109 | HT Cable 3Cx50 mmsq |
110 | Carraige of PVC / XLPE/LT/HT Aluminium Cable Drumsfrom storage site to loading site/Unrolling, Measurement, Cutting and loading of same into truck |
111 | 95 sqmm 1 core PVC Cable |
112 | 120 sqmm 1 core PVC Cable |
113 | 185 sqmm 1 core PVC Cable |
114 | 240 sqmm 1 core PVC Cable |
115 | 300 sqmm 1 core PVC Cable |
116 | 400 sqmm 1 core PVC Cable |
117 | 630 sqmm 1 core PVC Cable |
118 | 400 sqmm XLPE Cable 11 KV Grade 3 Core |
119 | 300 sqmm XLPE Cable 11 KV Grade 3 Core |
120 | 240 sqmm XLPE Cable 11 KV Grade 3 Core |
121 | 185 sqmm XLPE Cable 11 KV Grade 3 Core |
122 | 120 sqmm XLPE Cable 11 KV Grade 3 Core |
123 | 11 KV Single Core XLPE 630 mmsq |
124 | 33 KV Single Core XLPE 630 mmsq |
125 | 185 mmsq 3.5 core PVC Cable |
126 | 300 mmsq 3.5 core PVC Cable |
127 | ABC 120 mmsq 5 Core PVC Cable |
128 | LT ABC 3Cx120 mmsq |
129 | LT ABC 3Cx50 mmsq |
130 | LT ABC 3Cx35 mmsq |
131 | LT ABC 3Cx25 mmsq |
132 | HT Cable 3Cx185 mmsq |
133 | HT Cable 3Cx120 mmsq |
134 | HT Cable 3Cx50 mmsq |
135 | Physical Verification, carriage and stacking backPVC / XLPE/LT/HT Aluminium Cable Drums |
136 | 95 sqmm 1 core PVC Cable |
137 | 120 sqmm 1 core PVC Cable |
138 | 185 sqmm 1 core PVC Cable |
139 | 240 sqmm 1 core PVC Cable |
140 | 300 sqmm 1 core PVC Cable |
141 | 400 sqmm 1 core PVC Cable |
142 | 630 sqmm 1 core PVC Cable |
143 | 400 sqmm XLPE Cable 11 KV Grade 3 Core |
144 | 300 sqmm XLPE Cable 11 KV Grade 3 Core |
145 | 240 sqmm XLPE Cable 11 KV Grade 3 Core |
146 | 185 sqmm XLPE Cable 11 KV Grade 3 Core |
147 | 120 sqmm XLPE Cable 11 KV Grade 3 Core |
148 | 11 KV Single Core XLPE 630 mmsq |
149 | 33 KV Single Core XLPE 630 mmsq |
150 | 185 mmsq 3.5 core PVC Cable |
151 | 300 mmsq 3.5 core PVC Cable |
152 | ABC 120 mmsq 5 Core PVC Cable |
153 | LT ABC 3Cx120 mmsq |
154 | LT ABC 3Cx50 mmsq |
155 | LT ABC 3Cx35 mmsq |
156 | LT ABC 3Cx25 mmsq |
157 | HT Cable 3Cx185 mmsq |
158 | HT Cable 3Cx120 mmsq |
159 | HT Cable 3Cx50 mmsq |
160 | C&R Panels: Unloading of 11 KV VCB Panels by mannual/ mechanical means, verification and carriage to storage site including storage of same |
161 | 11 KV VCB Panels Sets (1+3) |
162 | 11 KV VCB Panels Sets (1+4) |
163 | 11 KV VCB Panels Sets (1+5) |
164 | 11 KV VCB Panels Sets (2+5) |
165 | 11 KV VCB Panels (Incomer) |
166 | 11 KV VCB Panels (Outgoing) |
167 | 33 KV C&R Panels |
168 | Line Panels |
169 | Transformer Panels |
170 | C&R Panels: Carriage of 11 KV VCB Panels from storage site to loading site and loading of same into truck. |
171 | 11 KV VCB Panels Sets (1+3) |
172 | 11 KV VCB Panels Sets (1+4) |
173 | 11 KV VCB Panels Sets (1+5) |
174 | 11 KV VCB Panels Sets (2+5) |
175 | 11 KV VCB Panels (Incomer) |
176 | 11 KV VCB Panels (Outgoing) |
177 | 33 KV C&R Panels |
178 | Line Panels |
179 | Transformer Panels |
180 | C&R Panels: Physical verification, carriage and stacking back 11 KV VCB Panels |
181 | 11 KV VCB Panels Sets (1+3) |
182 | 11 KV VCB Panels Sets (1+4) |
183 | 11 KV VCB Panels Sets (1+5) |
184 | 11 KV VCB Panels Sets (2+5) |
185 | 11 KV VCB Panels (Incomer) |
186 | 11 KV VCB Panels (Outgoing) |
187 | 33 KV C&R Panels |
188 | Line Panels |
189 | Transformer Panels |
190 | Other Key Materials: Unloading of below key materials by mannual/ mechanical means, verification and carriage to storage site including storage of same. |
191 | Transformer Oil Fresh (in barrels of 210 ltrs) |
192 | 11 KV Hor Gap Fuse Sets |
193 | Portable Oil Filtration Plant |
194 | 33 KV Isolators with E/B |
195 | 33 KV Isolators without E/B |
196 | 11 "KV Disc Insulators |
197 | 33 KV Disc Insulators |
198 | 11 KV Pin Insulators with Pins |
199 | 33 KV Pin Insulators with Pins |
200 | LT Shackle Insulators |
201 | Sundary Materials/Un-Serviceable Material |
202 | 33 KV VCB |
203 | 33 KV LA"s |
204 | 33 KVCT""s |
205 | 66 KV SF-6 Breaker |
206 | 66 KV CT"s |
207 | 66 KV Isolators with E/B |
208 | 66 KV Isolators without E/B |
209 | Battery Charger 36 V |
210 | IPC for phases (120.120) |
211 | IPC for bare messanger (70-70) |
212 | IPC for street lighteningwire (16-16) |
213 | IPC for phase (50-50) |
214 | IPC for messenger (35-35) |
215 | IPC for phases (120-50) Pole DB |
216 | IPC for bare messenger (70-50) Pole DB |
217 | Pole DB Three Phase |
218 | DB (LT)100 KVA with MCCB with 2 Ckts |
219 | DB (LT) 250 KVA with MCCB with 2 Ckts |
220 | DB (LT) 400 KVA with MCCB with 2 Ckts |
221 | 11 KV 3-Phase Isolaors (800 Amps) |
222 | 11 KV 3 Phase Gang Operated Switch (600 Amps) |
223 | 11 KV 3 Phase DO Fuse Set |
224 | 11 KV LA"s Sets |
225 | Dead end clamp with mounting arrangement for HT AB Cable |
226 | Suspension clamp with mounting arrangement for HT AB Cable |
227 | Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm |
228 | Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm |
229 | Suspension clamp with mounting arrangement for LT AB Cable |
230 | End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable |
231 | End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable |
232 | End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable |
233 | Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable |
234 | Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable |
235 | Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable |
236 | Mid Span joints for LT AB Cable 3C x 50 Sqmm |
237 | Mid Span joints for LT AB Cable 50 Sqmm |
238 | Mid Span joints for LT AB Cable 35 Sq mm |
239 | Mid Span joints for LT AB Cable 16 Sq mm |
240 | Mid Span joints for LT AB Cable 3C x 120 Sqmm |
241 | Mid Span joints for LT AB Cable 120 Sqmm |
242 | Mid Span joints for LT AB Cable 70 Sq mm |
243 | Mid Span joints for LT AB Cable 16 Sq mm |
244 | Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete |
245 | 7/3.15 mm dia GI stranded wire |
246 | GI Earthing Rods |
247 | S.W.G. 6 |
248 | Other Key Materials: Carriage of material from storage site to loading site and loading of same into truck |
249 | Transformer Oil Fresh (in barrels of 210 ltrs) |
250 | 11 KV Hor Gap Fuse Sets |
251 | Portable Oil Filtration Plant |
252 | 33 KV Isolators with E/B |
253 | 33 KV Isolators without E/B |
254 | 11 "KV Disc Insulators |
255 | 33 KV Disc Insulators |
256 | 11 KV Pin Insulators with Pins |
257 | 33 KV Pin Insulators with Pins |
258 | LT Shackle Insulators |
259 | Sundary Materials/Un-Serviceable Material |
260 | 33 KV VCB |
261 | 33 KV LA"s |
262 | 33 KVCT""s |
263 | 66 KV SF-6 Breaker |
264 | 66 KV CT"s |
265 | 66 KV Isolators with E/B |
266 | 66 KV Isolators without E/B |
267 | Battery Charger 36 V |
268 | IPC for phases (120.120) |
269 | IPC for bare messanger (70-70) |
270 | IPC for street lighteningwire (16-16) |
271 | IPC for phase (50-50) |
272 | IPC for messenger (35-35) |
273 | IPC for phases (120-50) Pole DB |
274 | IPC for bare messenger (70-50) Pole DB |
275 | Three Phase |
276 | 100 KVA with MCCB with 2 Ckts |
277 | 250 KVA with MCCB with 2 Ckts |
278 | 400 KVA with MCCB with 2 Ckts |
279 | 11 KV 3-Phase Isolaors (800 Amps) |
280 | 11 KV 3 Phase Gang Operated Switch (600 Amps) |
281 | 11 KV 3 Phase DO Fuse Set |
282 | 11 KV LA"s Sets |
283 | Dead end clamp with mounting arrangement for HT AB Cable |
284 | Suspension clamp with mounting arrangement for HT AB Cable |
285 | Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm |
286 | Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm |
287 | Suspension clamp with mounting arrangement for LT AB Cable |
288 | End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable |
289 | End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable |
290 | End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable |
291 | Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable |
292 | Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable |
293 | Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable |
294 | Mid Span joints for LT AB Cable 3C x 50 Sqmm |
295 | Mid Span joints for LT AB Cable 50 Sqmm |
296 | Mid Span joints for LT AB Cable 35 Sq mm |
297 | Mid Span joints for LT AB Cable 16 Sq mm |
298 | Mid Span joints for LT AB Cable 3C x 120 Sqmm |
299 | Mid Span joints for LT AB Cable 120 Sqmm |
300 | Mid Span joints for LT AB Cable 70 Sq mm |
301 | Mid Span joints for LT AB Cable 16 Sq mm |
302 | Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete |
303 | 7/3.15 mm dia GI stranded wire |
304 | GI Earthing Rods |
305 | S.W.G. 6 |
306 | Other Key Materials: Physical verification carriage and stacking back |
307 | Transformer Oil Fresh (in barrels of 210 ltrs) |
308 | 11 KV Hor Gap Fuse Sets |
309 | Portable Oil Filtration Plant |
310 | 33 KV Isolators with E/B |
311 | 33 KV Isolators without E/B |
312 | 11 "KV Disc Insulators |
313 | 33 KV Disc Insulators |
314 | 11 KV Pin Insulators with Pins |
315 | 33 KV Pin Insulators with Pins |
316 | LT Shackle Insulators |
317 | Sundary Materials /Un-Serviceable Material |
318 | 33 KV VCB |
319 | 33 KV LA"s |
320 | 33 KVCT""s |
321 | 66 KV SF-6 Breaker |
322 | 66 KV CT"s |
323 | 66 KV Isolators with E/B |
324 | 66 KV Isolators without E/B |
325 | Battery Charger 36 V |
326 | IPC for phases (120.120) |
327 | IPC for bare messanger (70-70) |
328 | IPC for street lighteningwire (16-16) |
329 | IPC for phase (50-50) |
330 | IPC for messenger (35-35) |
331 | IPC for phases (120-50) Pole DB |
332 | IPC for bare messenger (70-50) Pole DB |
333 | Three Phase |
334 | 100 KVA with MCCB with 2 Ckts |
335 | 250 KVA with MCCB with 2 Ckts |
336 | 400 KVA with MCCB with 2 Ckts |
337 | 11 KV 3-Phase Isolaors (800 Amps) |
338 | 11 KV 3 Phase Gang Operated Switch (600 Amps) |
339 | 11 KV 3 Phase DO Fuse Set |
340 | 11 KV LA"s Sets |
341 | Dead end clamp with mounting arrangement for HT AB Cable |
342 | Suspension clamp with mounting arrangement for HT AB Cable |
343 | Dead end clamp with mounting arrangement for LT AB Cable 3C x 50 sqmm |
344 | Dead end clamp with mounting arrangement for LT AB Cable 3C x 120 sqmm |
345 | Suspension clamp with mounting arrangement for LT AB Cable |
346 | End Termination (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV ) AB Cable |
347 | End Termination (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV ) AB Cable |
348 | End Termination (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV ) AB Cable |
349 | Straight through joint (Heat Shrinkable type) Kit for 3C x 185 Sqmm (11 KV) AB Cable |
350 | Straight through joint (Heat Shrinkable type) Kit for 3C x 120 Sqmm (11 KV) AB Cable |
351 | Straight through joint (Heat Shrinkable type) Kit for 3C x 50 Sqmm (11 KV) AB Cable |
352 | Mid Span joints for LT AB Cable 3C x 50 Sqmm |
353 | Mid Span joints for LT AB Cable 50 Sqmm |
354 | Mid Span joints for LT AB Cable 35 Sq mm |
355 | Mid Span joints for LT AB Cable 16 Sq mm |
356 | Mid Span joints for LT AB Cable 3C x 120 Sqmm |
357 | Mid Span joints for LT AB Cable 120 Sqmm |
358 | Mid Span joints for LT AB Cable 70 Sq mm |
359 | Mid Span joints for LT AB Cable 16 Sq mm |
360 | Galvanised stay set with 50 x 8 mm stay clamp, guy insulators (02 Nos) anchor plate (200x200x6mm) nut bolts 2 Nos turn buckles 1.8m long 16mm diameter solid GS stay rod complete |
361 | 7/3.15 mm dia GI stranded wire |
362 | GI Earthing Rods |
363 | S.W.G. 6 |
364 | Personnel Protective Equipments: Unloading of following Personnel Protective Equipments by Mannual/mechanical means. Verification and carriage to storage site including storage of the same. |
365 | Full body safety harness, |
366 | workman safety shoes, |
367 | safety helmets, |
368 | high voltage gloves, |
369 | high voltage detector sets 220/132 KV |
370 | high voltage detector sets33/11 KV |
371 | Earthing discharge rods 11/33 KVKV System |
372 | Earthing discharge rods 132-220 KV System |
373 | Carriage of Personnel Protective Equipments from storage site to loading site and loading of same into truck. |
374 | Full body safety harness, |
375 | workman safety shoes, |
376 | safety helmets, |
377 | high voltage gloves, |
378 | high voltage detector sets 220/132 KV |
379 | high voltage detector sets33/11 KV |
380 | Earthing discharge rods 11/33 KVKV System |
381 | Earthing discharge rods 132-220 KV System |
382 | Physical Verification, carriage and stacking back personnel protective equipments |
383 | Full body safety harness, |
384 | workman safety shoes, |
385 | safety helmets, |
386 | high voltage gloves, |
387 | high voltage detector sets 220/132 KV |
388 | high voltage detector sets33/11 KV |
389 | Earthing discharge rods 11/33 KVKV System |
390 | Earthing discharge rods 132-220 KV System |
391 | Unloading of Control Cable Drums by mannual/ mechanical means. Verification and carriage to storage site including storage of the same. |
392 | 2 Core 2.5 mm sq Control Cable |
393 | 4 Core 2.5 mm sq Control Cable |
394 | 6 Core 2.5 mm sq Control Cable |
395 | 8 Core 2.5 mm sq Control Cable |
396 | 10 Core 2.5 mm sq Control Cable |
397 | 12 Core 2.5 mm sq Control Cable |
398 | Carriage of Control Cable Drums from storage site to loading site and loading of same into truck |
399 | 2 Core 2.5 mm sq Control Cable |
400 | 4 Core 2.5 mm sq Control Cable |
401 | 6 Core 2.5 mm sq Control Cable |
402 | 8 Core 2.5 mm sq Control Cable |
403 | 10 Core 2.5 mm sq Control Cable |
404 | 12 Core 2.5 mm sq Control Cable |
405 | Physical verification, carriage and stacking back Control Cable Drums |
406 | 2 Core 2.5 mm sq Control Cable |
407 | 4 Core 2.5 mm sq Control Cable |
408 | 6 Core 2.5 mm sq Control Cable |
409 | 8 Core 2.5 mm sq Control Cable |
410 | 10 Core 2.5 mm sq Control Cable |
411 | 12 Core 2.5 mm sq Control Cable |
412 | Unloading of XLPE Twin Core Cable Drums by mannual/ mechanical means. Verification and carriage to storage site includig storage of the same. |
413 | 10 mm sq Twin Core Cable (Armoured) |
414 | 10 mm sq Twin Core Cable (Un-Armoured) |
415 | 16 mm sq Twin Core Cable (Armoured) |
416 | 16 mm sq Twin Core Cable (Un-Armoured) |
417 | Carriage of XLPE Twin Core Cable Drums from storage site/Unrolling, Measurement, Cutting to loading site and loading of same into truck |
418 | 10 mm sq Twin Core Cable (Armoured) |
419 | 10 mm sq Twin Core Cable (Un-Armoured) |
420 | 16 mm sq Twin Core Cable (Armoured) |
421 | 16 mm sq Twin Core Cable (Un-Armoured) |
422 | Physical verification carriage and stacking backXLPE Twin Core Cable Drums |
423 | 10 mm sq Twin Core Cable (Armoured) |
424 | 10 mm sq Twin Core Cable (Un-Armoured) |
425 | 16 mm sq Twin Core Cable (Armoured) |
426 | 16 mm sq Twin Core Cable (Un-Armoured) |
427 | Unloading/ Loading/ Physical Verification by mannual/mechanical means of the following material: |
428 | 10-60 Amp 1 Phase Energy Meters |
429 | 3-Phase Energy Meters |
430 | Prepaid/ Smart Energy Meters |
431 | 33 KC Ct/PT Units |
432 | Earth Wire |
433 | 11 KV 630 Amp Isolator with Earth Switch |
434 | Misc. items like fittings, nuts bolts, MCB"s etc |
435 | Surface Dressing/ ground clearance within store area, including uproating of unwanted vegetation, thorny bushes, small trees etc, & then its disposal properly for smooth handling of material. |
436 | Repair and maintenance of existing illumination in store yard and divisional permises viz: Tighteneing of loose conductor including straightening of fexisting poles and providing of spacers between the conductors (Line length 1 Km 3 wire LT Line) |
437 | Providing and fixing of one No street light LED 90 watts of reputed make with hardware fitting complete job having warranty as per firms norm. |
438 | Repair and maintenance of existing non-functional street lights installed in store yard. |
439 | AMC for the existing 30 MT Electronic Weigh Bridge (through authorized service provider) installed in the store yard. Load Cells 30 MT Make Multi Weigh. a) AMC Changes will be paid annually after verification from concerned AEE. b) AMC will be comprehensive nature including all parts except load cell & PCB. c) Provide two routine maintenance per year besides breakdown. d) Specially trained mechanic be sent fortnightly for routine calibration. e) In case of breach of contract, division has the right to terminate the contract without any liability on it to get same done from other source at the cost and risk of the contractor. |
440 | Unloading by mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts. |
441 | Loadingby mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts. |
442 | Physical Verification, Carriage by mannual / Mechanical means for items Tor Steel, Angle, Channel, Nuts and Bolts. |
443 | Providing and fixing of 0.8 KVA Invertor alongwith maintenance free 12 Volt Battery of reputed make |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy