|
| 1 | RWSS Bagheri ka Naka |
| 2 | Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-2000 (amended up to date), with internal cement mortarlining suitable for potable water with rubber ring (EPDM) joints as per IS: 5382-1985 including all taxes (Central and local), transportation and freight charges, inspection charges, loading/unloading charges, including cost of labour and material, specials (Tee, bend etc.) satisfactory hydraulic testing, disinfection, commissioning etc. complete as per technical specifications and direction of Engineer-in-charge. (excluding earth work)Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid separately. |
| 3 | 350 mm |
| 4 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming ofbottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and disposal of surplus excavated soil as directed within a lead of 50 Mtr. including required all safety provisions etc.:All kinds of soil |
| 5 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in trenches of required width and gradient for laying and jointing of pipe line including excavation for sockets, and dressing of sides, ramming ofbottoms, depth up to 1.5 Mtr. including taking out the excavated soil, and then returning the soil as required in layers not exceeding 20cm in depth including consolidating each deposited layer by ramming, watering etc. and stackingserviceable material for measurements and disposal of unserviceable material as directed, with in a lead of 50 Mtr. including all safety provisions required .: |
| 6 | Ordinary rock |
| 7 | Construction of RCC Sluice valve chamber for different type of valves including earthwork excavation, 100mm PCC M15 as leveling course,RCC M25 grade for base slab, side wall & cover slab , including cost of steel reinforcement , form work, Pre-cast, Plastic encapsulated CI/MSFoot Rest, MS flats for the support of pre-cast, proper curing of concrete work complete in all respect as per specifications and standard drawings and as directed by Engineer-in-Charge. |
| 8 | Sluice valve chamber of size 1.39m x1.43m x2.245m for pipe size-from 350-to-450mm |
| 9 | Providing, lowering, laying, aligning, fixing in position CI D/F short body pattern type butterfly valves having body, disc and end cover in graded cast iron generally conforming to (IS13095/1991amended up to date), synthetic rubber faced ring secured on disc by retaining ring with SS steel screw stub shaft of SS riding in Teflon bearing including C.C. foundation/ structural steel support, material, labour, testing along with pipe line and commissioning as perTechnical Specifications and as per direction of Engineer in charge. Note: Rates are exclusive of tail piece/ dismantling joints and earth work |
| 10 | Manually Operated Butterfly Valve PN-1.0 |
| 11 | 350 mm dia (With Gear Operated) |