Tender For Strengthening Of Hoisting Arrangement By Replacing Of Wire Rope Shaft Pin Poul Ratchet Locking Arrangementrubber Seal Etcat Spillway Gate Of Tarragona I Scheme Distpuruliawest Bengal
Tender Value
4.14 Lakhs
Estimated cost
Bid Submission
07 Jun 2023
0 days left
EMD
8292
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
purulia → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Strengthening Of Hoisting Arrangement By Replacing Of Wire Rope Shaft Pin Poul Ratchet Locking Arrangementrubber Seal Etcat Spillway Gate Of Tarragona I Scheme Distpuruliawest Bengal
BOQ
| Sl. No. | Item Description |
| 1 | Cost for arrangement of holding the Dam / Barrage gate and its counter weight by special fixures, tools and tackles, chain pulley block and heavey scaffolding etc as per requirement for performing repairing works at the site. The cost includes cost of mampowers, hire charges of T&P, chain pulley blocks, scaffolding, and overhead cost etc to complete the job as per direction of Engineer in charge. |
| 2 | b) Gate shuteer size above 10 sq.m upto 20 Sq.m |
| 3 | Supply & fitting fixing of round strand (steel core/fibre core) steel wire rope (ungalvanised,IWRC) of 6x36 construction of 1960 tensile designation as per IS-2266 (make: Usha Martin,Bharat Wire Ropes ltd or BIS approved makes), rope clamp with Dishakle and fitting fixing of said material with correct alignment and position inclusive of all cost of labour, T&P,scaffolding charges & all other incidental charges as necessary to complete the job in all respect upto the satisfaction of E.I.C.t) 30 mm dia (steel core) |
| 4 | Supply, installation, testing and commisioning of following items for rope drum hoisting system as mentioned below as per direction including cost of Materials, Machinaries , Manpower, Cutting, Machining, Aligning, Anchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as perspecification (without painting) |
| 5 | Turn Buckle (MS) |
| 6 | Rope Clamp(MS) |
| 7 | Dismantling of following items of rope drum hoisting system for replacement by new one as mentioned below as per direction including cost of Materials, Machinaries , Manpower, T & P and all overheads with all leads and lifts complete as per specification .(ix) Sheave/Pulley |
| 8 | Supply, installation, testing and commisioning of following items for hoisting system and gear box as mentioned below as per direction including cost of Materials, Machinaries ,Manpower, Cutting, Machining, Aligning, Anchoring, Welding, Finishing,Consumables,Carriage and all overheads with all leads and lifts complete as per specification (without painting) |
| 9 | xxxii) Poul Ratchet Locking Arrangement |
| 10 | v)Shaft /Pin with key ways made of c. SS-304 |
| 11 | Supplying of cage frame and installation of the same made by Suitable section and all hot deep galvanized cover MS and fastened by nuts and bolts and side covered with 75mm×75mm poly coated link mesh proper fixing of poly coated mesh with the structural members including lapping & setting by MS flat including cost of galvanized MS, cost of Poly coated link mesh, cost of drill hole for fixing nuts&bolts, cost of fixing poly coated link mesh with members, cost of labour , hire charges of T&P, transportation cost etc to complete the job for Barabhum Dam as per direction of EIC. by following materials: (This item may be used for repairing.a) Galvanized MS materials |
| 12 | Cost for dismantling different types rubber seal from gate shutter as per direction of E.I.C.The cost includes cost of man power employed for dismantling, hire charges of tools & tackles,scaffolding and safety equipments etc including carriage loading & unloading.b) Gate shuteer size above 10 sq.m upto 20 Sq.m |
| 13 | Cost for supplying and fitting fixing of Flat rubber seal (Make : Universal Moulders & Engineer/Popular Rubber Works (Pvt) Ltd/SAB Industries/Unique Polymer Works/equivelant approved make conforming to lS : 11855 -2011/Latest Revision) for different types of gate shutter as per direction of E.I.C. The cost includes cost of man power employed for fitting fixing, cost of rubber seal, hire charges of tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading but excluding supply of ms clamp/ flat plate, bolts, nuts and washer.f) 100 x 14 mm |
| 14 | Cost for replacement of new flat type neoprene side rubber seal of size 150mm(w)×12mm(t)as per IS-11855-1986 with M.S. Flat of size50 mm. x 06mm. , G.I. CS Bolts & Nuts with wahser of size dia = 1/2\" L=2.5\", araldite for rubber seal corner joint as required rubber seal as given below, the cost includes materials cost, welding & drilling cost, hire charges of T&P, transportation, man power etc. to complete the job at site as per direction of E.I.C. |
| 15 | Supplying of M.S flat for clamping Rubber seal with hole as per direction of EIC |
| 16 | Supplying of M.S bolts with nut for clamping Rubber seal as per direction of EIC |
| 17 | Servicing & maintenance of winch M/C i.e. cleaning the gears, plummer block including bearings , rope drum etc with the help of Kerosine, jute, cloth, sand paper, emery paper etc, application of grease, mobil oil in the bearings of plummer b l o c k f o r proper lubricating and supply and fitting, fixing of damaged oil seals & missing Nut & Bolts etc. to complete the job at site as per direction of Engineer in charge. |
| 18 | Scraping, cleaning of wire rope, rope drum, pulley and lubricating the wire rope with rope compound servo coat-140 or approved wire rope compound including setting the wire rope in proper alignment and position as necessary as per direction of EIC. The Cost includes cost of manpower employed, scaffolding charges, cost of kerosine, jute, wire brush, cloth, wire rope compound & all other incidental charges to complete the job in all respect. |
| 19 | f) 20 mm dia |
| 20 | i) 30mm dia |
AI Tender Summary
Tender Timeline
May 25, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJun 07, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 08, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer