Tender For Estimate For Construction Of Independent Water Works At Village Khudana Tehsil And Distt.Mohindergarh. Construction Of 1Raw Water Pumping Station, 1 Water Works, Laying The Rawand Clear Water Rising Main Lines Of Different Sizes Supply, Erectio
Tender Overview
Project Description
Estimate For Construction Of Independent Water Works At Village Khudana Tehsil And Distt.Mohindergarh. Construction Of 1Raw Water Pumping Station, 1 Water Works, Laying The Rawand Clear Water Rising Main Lines Of Different Sizes Supply, Erection, Testing And Commissioning Of Horizontal Centrifugal Pumping Sets And Dg Sets As Per Required Capacity. O And M For 12 Months During Defect Liability Period
BOQ
| Sl. No. | Item Description |
| 1 | Provision for providing and fixing of electric LT panel board suitablefor 3 phase 4 wire AC supply along with all material complete in allrespect. |
| 2 | Providing and fixing of LED Light 100 Watt , make of Standard Brand Complete in all respect |
| 3 | Providing and Installing Horizontal Split casing centrifugal RAW water Pumping Set 9000 LPM 170.00 BHP 50.00 meter head. |
| 4 | Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head 12.00 m as per the indicated requirements of discharge in LPM and power capacity in BHPMake: KSB, CRI, Kirlosker,CromptonGreeve, Lubi)` Raw Water Pump Set Head 12.00 Mtr2500 LPM 15 BHP |
| 5 | Supply ,Erection, Testing and Commissioning of Horizontal Split Casing Clear Water Pumping SetDischarge 2500 LPM X 40 m Head |
| 6 | Operation and maintenance for complete scope of work mentioned in the DNIT(Disinfection material supplied by PHED)as per schduled -IV a period of five year after 12 month during defect liability period and 03 month trial run will be charge to the A/mtc. estimate complete in all respect as per approved NIT. Operation and maintenance during defect liability period(operation only) |
| 7 | Operation and Maintenance during 1st year after defect liability period. |
| 8 | Operation and Maintenance during 2nd year. |
| 9 | Operation and Maintenance during 3rd year. |
| 10 | Operation and Maintenance during 4th year. |
| 11 | Operation and Maintenance during 5th year. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender