Tender For 2Nd Call/Construction Of 1 No. Additional Classroom In 1 No. Elementary Level School Under Salema Block Of Dhalai District Under Samagra Shiksha
Tender Value
14.26 Lakhs
Estimated cost
Bid Submission
14 Jun 2023
0 days left
EMD
28528
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
salema → Tripura
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
2Nd Call / Construction Of 1 No. Additional Classroom In 1 No. Elementary Level School Under Salema Block Of Dhalai District Under Samagra Shiksha
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.-All kinds of soil |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.-All kinds of soil |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitablemethod complete. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring andshuttering --All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded stoneaggregate 20 mm nominal size) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars,piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishingand reinforcement- 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) cum |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five levelexcluding the cost of centring, shuttering, finishing and reinforcement-1:1.5:3( 1 Cement: 1.5 fine sand :3 gradedstone aggregate 20 mm nominal size) |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for massconcrete with timber plank |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for:Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for:Lintels, beams, plinth beams, girders, bressumers andcantilevers with wooden plank |
| 11 | Centering shuttering including struttings, propping etc. and removal of form work for:Weather shade, Chajjas, corbels etc., including edges. |
| 12 | Centering shuttering including struttings, propping etc. and removal of form work for:Suspended floors, roofs, landings, balconies and accessplatform with timber planks |
| 13 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D ormore |
| 14 | First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:2 ( 1 cement : 2 fine sand ). Brick work in foundation plinth |
| 15 | Half brick masonry work with first class bricks infoundation and plinth including cost of all materials asrequired complete:-( 1 cement : 4 fine sand ). |
| 16 | Providing and fixing 1mm thick M.S. sheet door withframe of 40x40x6mm angle iron and 3mm M.S. gussetplates at the junctions and corners, & with cleats withbolts & nuts, rivets, locking arrangement, handles, hooks& eyes, pinlets including embedding in cement concreteof required grade for fixing in position, all necessaryfittings, including applying a priming coat of approvedsteel primer etc. complete as required:-Using M.S. angels 40x40x6 mm for diagonal braces. |
| 17 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square orround bars etc. all complete. Fixed to steel windows by welding. |
| 18 | Providing and laying cement concrete 1:2:4 (1 cement : 2fine sand : 4 graded stone aggregate) flooring finishedwith a floating coat of neat cement including cementslurry, rounding of edges and strips etc. complete.40 mm thick with 20 mm stone aggregate |
| 19 | 12 mm cement plaster of mix:Cement mortar 1:4 (1 cement : 4 fine sand) |
| 20 | 15mm cement plaster on the rough side of single or half brick wall of mix:Cement mortar 1:4 (1 cement : 4 fine sand) |
| 21 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade[Payment shall be made after submission of Test Certificate issued by the Manufacturer] : New work ( two or more coats) over and including waterthinnable priming coat with cement primer. |
| 22 | Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture[Payment shall be made after submission of Test Certificate issued by the Manufacturer] :New work ( two or more coats applied @ 1.67 litre/10 sqmover and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
| 23 | Finishing with Epoxy paint ( two or more coats) of approved brand and manufacture at all locationsprepared and applied as per manufacturer\"s specification including appropriate priming coat,preparation of surface etc. complete [Payment shall be made after submission of Test Certificate issued by the Manufacturer].On steel work |
| 24 | Neat Cement Punning |
| 25 | Supplying and fitting fixing of Green Chalk Board of size 1200 x 2400 mm as per specification. |
AI Tender Summary
Tender Timeline
May 24, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJun 14, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 15, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender