}

Tender For Following Works --Multi State

Embassy Of India has published Tender For Following Works -. Submission Date for this Tender is 15-06-2023. Electrical Panel Tenders in Multi State. Bidders can get complete Tender details and download the document.




Tender Notice

37821754
Tender For Following Works -
Open Tender
Indian
Multi State
15-06-2023

Tender Details

Tender For Following Works - 1. Replacement of pressure gauge 0-25 KgF/cm 2 pieces, and 0-16 kgf/cm² 35 pieces 2. Replacement of three-way valves for pressure gauge 37 pieces 3. Replacement of thermometers with oil pouring into casings in boiler room 15 pieces 4. Chemical washing of heat exchangers (heating system and hot water supply system) with testing of heat exchangers in the central heating unit 5. Visit of a specialist to adjust the automation system in the central heating unit 6. Repair electrics of the electric boiler in the central heating unit 7. Replacement of all air filers (administrative building) 10 pieces 8. Replacement of air filers (central heating unit) 9. Wash mud filters and other filters in the central heating 10. Pressure testing of the inner heating system unit 11. Replacement of sewage pipes in central heating unit (50 cm) 20 m 12. Replacement of heating radiator (Naval wing, second floor) 1 piece 13. Replacement of 1/2 ball valve for heating radiator (Naval wing, second floor) 2 pieces 14. Replacement of 1/2 ball valve in DP Dhar Hall toilet 2 pieces 15. Replacement of a metal pipe with a plastic pipe 1 (going from the ER to garage) 80 m 16. Install a new 3 line automation system for boiler in electrical panel C-201 piece 17. New beating pump to Gymn 18. Replacement of a ball valve 15 at the heating exit valve (garage) 1 piece 19. Install a new heating radiator in DP Dhar Hall 1 piece, ½ ball valve 2 pieces 20. Replacement of heating radiators ball valves (DP Dhar Hall) 8 pieces 21. Mark the pipelines, latches and valves in accordance with MOEK requirements 22. Paint the heat exchangers, latches, pipelines (without insulation), hot water and heating hubs 23. Insulate heating (100 cm)-30 m, hot water (50 cm), cold water (1cm) 10 m pipelines in garage wash 1. Replacement of pressure gange 0-25 KgF/cm 2 pieces, and 0-16 kgf/cm² 35 pieces 2. Replacement of three-way valves for pressure gauge 37 pieces 3. Replacement of thermometers 10 pieces 4. Replacement of heat exchanger 5. Chemical washing of hot water heat exchangers 6. Replacement of air valves 10 pieces 7. A new electric boiler (capacity 300-5001) with a new electricity line, automation system, etc Remove the old one. 8. Replacement of heating system electric valve assembly 1 piece 9. Replacement of hot water electric valve assembly 1 piece 10. Replacement of a broken display with control unit for heating system, hot water supply system, replacement of broken electric valve sensors and lines going to the control unit (ECL Comfort 210/310 Base part) 11. Install and adjust heating and hot water automation system 12. Replacement of a heating pump 1 piece 13. Replacement of heating radiator ball valves 10 pieces 14. Washing of mud and other filters 15. Mark the pipelines, latches and valves in accordance with MOEK requirements 1. Replacement of pressure gauge 0-25 KgF/cm 2 pieces and 0-16 kgf/cm² 20 pieces 2. Replacement of three-way valves for pressure gauge 22 pieces 3. Replacement of thermometers 10 pieces 4. Replacement of air filers 5 pieces 5. Chemical washing of heat exchangers (heating system and hot water supply system) with testing of heat exchangers in the central heating unit 6. Replacement of sewage pipe under floor (part starting from 50 cm till 100 cm exit) in yoga area including wall mounts, corners, bends 20 m 7. Wash mud filters and other filters in the central heating unit 8. Replacement of electric valve assembly 9. Replacement of 1/2 ball valve for heating radiator 16 pieces 10. Replacement of hot water pumps 2 pieces 11. Replacement of hot water and cold water pipelines in underground channel between the buildings (340 m) 120 m 12. Heating radiator covers on the first floor (yoga and dance halls, corridor, tabla room) 13. A new electric boiler (capacity 300-500 () with a new electricity line, automation system, etc 14. Replacement of inbuilt latch in the heating system 1 piece 1. Replacement of pressure gauge 0-25 KgF/cm 2 pieces, and 0-16 kgf/cm 30 pieces 2. Replacement of three-way valves for pressure gauge 32pieces 3. Replacement of thermometers 10 pieces 4. Replacement of air valves 5 pieces 5. Chemical washing of hot water beat exchangers 6. Washing of mud and other filters 7. Replacement of low exit valves 1/2, 3/4, 1 B. Check and adjust hot water and heating automation systems. If needed replace sensors including outdoor sensor 9. Inner heating system pressing test 10. Install a new 3 line automation system for heating C-16 C-20 11. Replacement of inbuilt latches in the heating system 2 piece, replacement of heating tube (32 cm) 10-15 m

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail