Department of Cooperation has published Tender For Fabrication And Erection Work. Submission Date for this Tender is 15-06-2023. Pipe Laying Tenders in Jalandhar Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 08-Jun-2023 | Date corrigendum | Date | 15-06-2023 |
Sl. No. | Item Description |
1 | FABRICATION AND ERECTION |
2 | Dismantling of MS/GI/SS pipe line size--1/2" to 12" Erection of MS/GI/SS pipe line size--1/2" to 12" |
3 | Dismantling ofMS/SS pipe line size--14" to 50" Fabrication ofMS/SS pipe line size ---14" to 50" 3mm/6mm/8mm/10mm/12mm Erection of faricated MS/SS pipe line size--14" to 50" |
4 | Dismantling of C I pipe line upto 12" Erection of C I pipe line upto 12" |
5 | Dismentalling of MS/SS Nipple upto 12"dia and upto 1 meter long Fabrication of MS/SS Nipple upto 12"dia and upto 1 meter long Erection of MS/SS Nipple Nipple upto 12"dia and upto 1 meter long |
6 | Dismentalling of faricated MS/GI/SS Nipple size--14"to 50"and upto 1 meter long Fabrication ofMS/GI/SS Nipple size ---14" to 50" and upto 1 meter long Erection of faricated MS/GI/SS Nipple size--14" to 50" and upto 1 meter long |
7 | Dismentalling of MS/SS Bend upto 12"dia Fabrication of MS/S Bend upto 12"dia Erection of MS/SS Bend upto 12"dia |
8 | Dismentalling of MS/GI/SS Bend size--14"to 50" Fabrication ofMS/GI/SS Bend size ---14" to 50" Erection of faricated MS/GI/SS Bend size--14" to 50" |
9 | Dismentalling of MS/SS Cone size--upto 100" Fabrication of MS/SS Cone size--upto 100" Erection of MS/SS Cone size--upto 100" |
10 | Dismentalling of C I Bend upto 12" Erection of C I Bend upto 12" |
11 | Dismantling of C I Tee upto 12" Erection ofC I Tee upto 12" |
12 | Dismantling of C I Cross upto 12" Erection ofC I Cross upto 12" |
13 | Dismantling of MS/SS Tee size--upto 100" Fabrication of MS/SS Tee size--upto 100" Erection of MS/SS Tee size--upto 100" |
14 | Dismantling of MS/SS Crosssize--upto 100" Fabrication of MS/SS Cross size--upto 100" Erection of MS/SS Cross size--upto 100" |
15 | Dismantling of railing of pipe. -Fabrication of railing pipe -Erection of railing pipe |
16 | Fixing of G.I wire weaved fencing around cold water reservoir |
17 | Dismantling and washing of old flange |
18 | Fabrication and Drilling of flange from MS plate |
19 | Replacement of Square bar/Rail 40mm/50mm |
20 | Replacement of Runner Flat of Cane Carrier/Secondary cane carrier/IRC/Bagasse Elevator/MBC/RBC 65mm/75mm |
21 | Replacement of Angle of Cane Carrier/Secondary cane carrier/IRC/Bagasse Elevator/MBC/RBC 65mm/75mm/90mm |
22 | Replacement of Side plate of Cane Carrier/Secondary cane carrier/IRC/BagasseElevator / MBC / RBC Chains6mm/8mm |
23 | Dis.Fab. and Erection of hood of Cane Leveller/Cane Chopper with supporting angle 10mm/12mm |
24 | Dis.Fab. and Erection of both side plate of hood of Cane Leveller/Cane Chopper with supporting angle 10mm/12mm |
25 | Dis.Fab. and Erection of both side plate ( MS/SS 10mm/12mm) of Fibrizer with supporting angle |
26 | Dis.Fab. and Erection of front side plate ( MS/SS 10mm/12mm) of Fibrizer with supporting angle |
27 | Dis. Fab. and Erection of roundTrough of Secondary cane Carrier/IRC/Bgasse Elevator/MBC/RBC 8mm/10mm/12mm plate |
28 | Dis. Fab. and Erection of base plate( MS/SS-- 8mm/10mm/12mm) of Secondary cane Carrier/IRC/Bagasse Elevator/MBC/RBC |
29 | Fabrication of Rakesof Secondary cane Carrier / IRC with attachmentfrom MS pipe Size-- 4" and 1" |
30 | Fabrication of Rakes of Bagasse Elevator/MBCwith attachmentfrom MS pipe Size-- 3" and 1" |
31 | Dismentalling of MS/SS Round/Square tank Fabrication of MS/SS Round/Square tank Erectionof MS/SS Round/Square tank |
32 | Dismentalling Bagacilo Screen frame Fabrication Bagacilo Screen frame Erectiontion Bagacilo Screen frame |
33 | DismentallingBagacilo Railing frame FabricationBagacilo Railing frame ErectiontionBagacilo Railing frame |
34 | Dismentalling of CI/GM Sluice/Angle/Butterfly Valve Size upto---16" Erection of CI/GM Sluice/Angle/Butterfly Valve Size upto---16" |
35 | Dismentalling of Pan Discharge Butterfly valve Erection of Pan Discharge Butterfly valve |
36 | Dismentalling of SS/Brass tube of Evaporators (S.K,V.C,Quads) Fitting of SS/Brass tube of Evaporators (S.K,V.C,Quads) |
37 | Dismentalling of SS/Brass tube of Pans Fitting of SS/Brass tube of Pans |
38 | Dismentalling of SS/Brass tube of Juice Heaters Fitting of SS/Brass tube of Juice Heaters |
39 | MS Straight/Right angle valve Size-300mm,350mm,400mm,450mm,600mm,700mm,900mm and 1000mm Dis. Erection |
40 | Hydaulic Testing of Evaporators (S.K,V.C,Quads) Hydaulic Testing of Pans Hydaulic Testing of Juice Heaters |
41 | MS BlindSize----1" to 50" Dis. Fab. Erection |
42 | Dismentalling of GI/Colored coated sheet Fitting of GI/Colored coated sheet |
43 | Dismentalling of ACC sheet Fitting of ACC sheet |
44 | Dismentalling of MS/SS Reducer size--upto 100" Fabrication of MS/SS Reducer size--upto 100" Erection of MS/SS Reducer size--upto 100" |
45 | Dismentalling of staircasing Fabrication of staircasing Erection of Staircasing |
46 | Dismentalling of Monkey Ladder Fabrication of Monkey Ladder Erection ofMonkey Ladder |
47 | Dismentalling of fabricated frame of pump & motor Fabrication of frame of pump & motor Erection of frame of pump & motor |
48 | Dismentalling of juice/water/syrup/molasses pump Erection of juice/water/syrup/molasses pump |
49 | Dismentalling of Injection/Spray/Massicuite/Magma pump Erection of Injection/Spray/Massicuite/Magma pump |
50 | Dismentalling of motor upto 50HP Erectionof motor up to 50HP |
51 | Dismentalling of motor 55 HP to 250 HP Erectionof motor 55 HP to 250 HP |
52 | Dismentalling of bewelgeared discharge valve and fitting of butterfly valve with modification of nipple & flange |
53 | Strengthening of building structure column binder |
54 | Replacement of VLJH Dismantling & erection of vapour line juice heater.All dismantled connectionsTo be connected. Levelling &alignment to be made. |
55 | Replacement of Shell of Pan 60 Ton Dismantling Fabrication& erection of pan shell.All dismantled connections to be connected. |
56 | Replacement of Save All of pan Dismantling & erection of save all of pan . All dismantled connections to be connected. |
57 | Replacement of stirrer shaft of Air Cooled Crystalizer--A, B & C Dismantling & erection of stirrer shaft of Air Cooled Crystalizer--A, B & C . All dismantled connections to be connected. Dismantling & fitting of drive gear arrangement. |
58 | Replacement of Top Cone Of pan Dismantling & erection of top coneof pan . All dismantled connections to be connected. |
59 | Replacement of Bottom Cone Of pan Dismantling & erection of bottom coneof pan . All dismantled connections to be connected. |
60 | Replacement of cooling coils of vertical crystallizer as per drg. Dismantling & erection of cooling coils of vertical crystallizer . All dismantled connections to be connected. |
61 | Shifting of 50 Tons capacity panfrom old mill to new mill Dismantling & erection of 50 Tons capacity pan . All dismantled connections to be connected |
62 | Shifting of vacuum crystallizer-A in place of vaccum crystallizer-C at the same floor Dismantling & erection of vacuum crystallizer-A in place of vaccum crystallizer-C . All dismantled connections to be connected. |
63 | Shifting of 50 ton air cooled crystallizer from old plant to new plant Dismantling & erection of 50 ton air cooled crystallizer . All dismantled connections to be connected and drive arrangement |
64 | Replacement of center shaft of juice clarifier Dismantling , erection and alignment of center shaft of juice clarifier . All dismantled connections to be connected. |
65 | Replacement of mud boot Dismantling,fabrication & erection of mud boot. All dismantled connections to be connected. |
66 | Replacement of compartment bottom plate of Juice clarifier Dismantling fabrication & Erection of compartment plate |
67 | DismantlingofMassecuitegutter FabricationofMassecuitegutter ErectionofMassecuitegutter |
68 | Dismantling , fabrication & erection of dorr compartment shell with MS plate channel angles.The erection work for this will also include all connections which are dismantled during dismantling. |
69 | Dismantling , fabrication & erection of dorr compartment/chamber roof with MS plate channel angles supports.The erection work for this job will also include all connections which are dismantled during dismantling. |
70 | Dismantlingof top/ bottom cover of juice heater Erection of top & bottom cover |
71 | Dismantling & erection ofsquare channel for rubber strip fitting ofjuice heaters |
72 | Dismantling , fabrication and erection of compartment box of juice heater |
73 | Dismantling of Horizontal sugar melter and to be shifted as per the directions of CE/CC |
74 | Shifting& Erection of verticalsugar melter for reprocessing of moist sugar Dismantling & erection of old vertical sugar melter for reprocessing of moist sugar. All dismantled connections to be connected with drive arrangement |
75 | Cantilever provided at the top of O.C.Filter to lift the drum at the height appx 10.0 meter from ground floor. |
76 | Dismantling of old mud mixer scroll Fabrication and Erection of newMud MixerScroll |
77 | Modification of Mud mixer Trough To increase the length of mud mixer trough by approx. 1 mtr. |
78 | Replacement ofBagacilo Line Dismantling, Fabrication and Erection of Bagacilo line |
79 | Dismantling, Fabrication and Erection of Bagacilo Cyclone |
80 | MS New Sulphur Furnace (complete) Fabrication & erection of sulphur furnace as per drg./as per instructions of CE/CC |
81 | Fabrication & erection of MS shoot for DSM screen |
82 | Fabrication , erection of corrugated 6./8 inch wide plate for equal water distributing at ETP |
83 | Dismantle, fabrication and erection of sperger M.S. pipe having length 500mm app, dia 14.0 inch dia |
84 | Dismantling, Fabrication and Erection of worn out stirrer arm of vertical crystallizers drive. |
85 | Replacement of distance piece of vapour pipe upto 1.5 mtr |
86 | Sulphur furnace (Extra work ) Scope of work a. Topbaffle plate to be dismantle and erected 250 mm away from existing site. b. Dismantling of existing worn outbaffle plate , fabricate and erect at existing site |
87 | Gate frame of magma mixture Scope of work a. Fabricationof frame along with MS channel. b. Drill to be made in both MS channel. c. Erection of frame at site |
88 | Fabrication and erection of sulphur furnace heating element coil of sulphur furnace melter. a- Fabrication of nipples and erection at sulphur melter systems b- Fabrication of nipples and erection of sulphur melter receiver |
89 | Shifting of sugar hopper fromold plant to new plant Dismantling & erection of sugar hopper. |
90 | Erection & commissioning of Hopper Tray with decking plate, connection arrangementof connecting rod and angle klits for wooden strips fitting approx. length 10 mtr. |
91 | Dismantling, shifting and erection of sugar elevator from old plant to new plant complete with structure |
92 | Dismantling, shifting and erection of sugar Graderfrom old plant to new plant complete with structure |
93 | Planetary gear box Erection & commissioningof planetary gear box at vertical crystallizer Any additional job to complete theerection work of planetary gear boxto be carried out by the contractor |
94 | Fabrication & erection of pneumatic shoot of Grader |
95 | Erection of pneumatic clamps of Grader |
96 | Repair of stirrer shaft of vacuum crystallizer Dismantling & erection of stirrer shaft of vacuum crystallizer after repair |
97 | Strengtheningof stirrer shaft of air cooled crystallizer • Dismantling & erection of stirrer shaft of air cooled crystallizer after repair. |
98 | Dismantling of platform -Fabrication of platform -Erection of platform |
99 | Fabrication and Erection of cane unloader bridge platform |
100 | Dis,feb,& errection of umbrella of pan along with its supports. |
101 | Dismantling of J-pipe of pans -Fabrication of J-pipe of pans -Erection of J-pipe of pans |
102 | Dismantling of vapour/exhaust pipe size-700mm/900mm/1000mm/1100mm -Fabrication of vapour/exhaust pipefrom 8mm/10mm thick plate -Erection of vapour/exhaust pipe |
103 | Dismantling of structure as per the instruction of CE -Fabricationof structure -Erection ofstructure |
104 | Patch work of different equipments |
105 | To straight the old damaged vapour pipe and round tank for platform. |
106 | Dismantling of Steam coil of molasses storage tank at pan station size 1” to 2”. -Fabricationof Steam coil of molasses storage tank at pan station size 1” to 2”. -Erection of Steam coil of molasses storage tank at pan station size 1” to 2”. |
107 | Dis, fab, & errection of juice coil of juice clarifier size 4”,5” & 6” alongwith its nipple |
108 | Dis. Fab & Erection of Wt. Juice pump strainer |
109 | Dismantling, Fabrication and Erection of pan SAVE-ALL top plate |
110 | Planetary gear box Erection of planetary gear box ofhorizontalcrystallizer |
111 | Replacement of old gate valve with new gate valve of crystallizers |
112 | Dismantling of double beat valve and erection of same of juice heater at existing site. |
113 | Dismantling of old Transient heater and Erection of new Transient heater along with all connections and valve. |
114 | Fabrication & Erection of Factory structure Complete window (frame & grills) |
115 | Modification, & Erection of mill house Rotary screen inlet juice Tank &platform |
116 | Fabrication and erection of excess bagasse carrier to RBC as per the dirction of CE scope of work (A) Fabrication and erection of column and structure for Belt conveyor , Along with drive system and discharge chute to RBC Column and steel structure |
117 | Fabrication and erection of cooling tower structure and shed |
118 | Strengthening of pans/vacuum crystallizershell with angle and channels in round shape with MS angle 75mmx75mm and dia 4mtr ( Two rounds ) |
119 | Strengthening of evaporator shell with angle and channels in round shape with MS angle 75mmx75mm and dia 2.80mtr ( Two rounds ) |
120 | Dismantling , fabrication & erection of juice feed boxes of juice heater double beat valve.The erection work for this job will also include all connections which are dismantled during dismantling. |
121 | Dismantling , fabrication & erection of melter of sulphur furnace as per existing design. This work include dismantling and erection of all connections, man hole, flanges etc. |
122 | Dismantling , fabrication & erection of scrubber of sulphur furnace as per existing design. This work include dismantling and erection of all connections, man hole, flanges etc. |
123 | Replacement of sealing ring of dorr mud boot |
124 | Dismantling , fabrication & erection of worn out heavy / light vacuum tank of RVF including all connections. |
125 | Dismantling , fabrication & erection of MS barometric condenser of RVF. This job will include all connections which are dismantled during dismantling. |
126 | Dismantling , fabrication & erection of bottom trough of RVF |
127 | Dismantling , fabrication & erection of down take of pan from 10/12 plate |
128 | Dismantling , fabrication & erection distributor of pans |
129 | Replacement of feed box of pans including all connections |
130 | Fitting of pad, ribbes on shaft of air cooled crystlizer / vaccum crystlizer and fitting of angle and ribben |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail