}

Tender For Fabrication And Erection Work, Jalandhar-Punjab

Department of Cooperation has published Tender For Fabrication And Erection Work. Submission Date for this Tender is 15-06-2023. Pipe Laying Tenders in Jalandhar Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

37793906
Corrigendum : Tender For Fabrication And Erection Work
Open Tender
Indian
Punjab
Jalandhar
15-06-2023

Tender Details

Tender For Fabrication And Erection Work-2 Dismantling Of Ms / Gi / Ss Pipe Line Size--1 / 2 To 12 Erection Of Ms / Gi / Ss Pipe Line Size--1 / 2 To 12 3 Dismantling Ofms / Ss Pipe Line Size--14 To 50Fabrication Ofms / Ss Pipe Line Size ---14 To 50 3Mm / 6Mm / 8Mm / 10Mm / 12Mmerection Of Faricated Ms / Ss Pipe Line Size--14 To 50 4 Dismantling Of C I Pipe Line Upto 12Erection Of C I Pipe Line Upto 12 5 Dismentalling Of Ms / Ss Nipple Upto 12Dia And Upto 1 Meter Longfabrication Of Ms / Ss Nipple Upto 12Dia And Upto 1 Meter Longerection Of Ms / Ss Nipple Nipple Upto 12Dia And Upto 1 Meter Long 6 Dismentalling Of Faricated Ms / Gi / Ss Nipple Size--14To 50And Upto 1 Meter Longfabrication Ofms / Gi / Ss Nipple Size ---14 To 50 And Upto 1 Meter Longerection Of Faricated Ms / Gi / Ss Nipple Size--14 To 50 And Upto 1 Meter Long 7 Dismentalling Of Ms / Ss Bend Upto 12Dia Fabrication Of Ms / S Bend Upto 12Dia Erection Of Ms / Ss Bend Upto 12Dia 8 Dismentalling Of Ms / Gi / Ss Bend Size--14To 50Fabrication Ofms / Gi / Ss Bend Size ---14 To 50 Erection Of Faricated Ms / Gi / Ss Bend Size--14 To 50 9 Dismentalling Of Ms / Ss Cone Size--Upto 100Fabrication Of Ms / Ss Cone Size--Upto 100 Erection Of Ms / Ss Cone Size--Upto 100 10 Dismentalling Of C I Bend Upto 12Erection Of C I Bend Upto 12 11 Dismantling Of C I Tee Upto 12Erection Ofc I Tee Upto 12 12 Dismantling Of C I Cross Upto 12Erection Ofc I Cross Upto 12 13 Dismantling Of Ms / Ss Tee Size--Upto 100Fabrication Of Ms / Ss Tee Size--Upto 100 Erection Of Ms / Ss Tee Size--Upto 100 14 Dismantling Of Ms / Ss Crosssize--Upto 100Fabrication Of Ms / Ss Cross Size--Upto 100 Erection Of Ms / Ss Cross Size--Upto 100 15 Dismantling Of Railing Of Pipe.-Fabrication Of Railing Pipe-Erection Of Railing Pipe 16 Fixing Of G.I Wire Weaved Fencing Around Cold Water Reservoir 17 Dismantling And Washing Of Old Flange 18 Fabrication And Drilling Of Flange From Ms Plate 19 Replacement Of Square Bar / Rail 40Mm / 50Mm 20 Replacement Of Runner Flat Of Cane Carrier / Secondary Cane Carrier / Irc / Bagasse Elevator / Mbc / Rbc 65Mm / 75Mm 21 Replacement Of Angle Of Cane Carrier / Secondary Cane Carrier / Irc / Bagasse Elevator / Mbc / Rbc 65Mm / 75Mm / 90Mm 22 Replacement Of Side Plate Of Cane Carrier / Secondary Cane Carrier / Irc / Bagasseelevator / Mbc / Rbc Chains6mm / 8Mm 23 Dis.Fab. And Erection Of Hood Of Cane Leveller / Cane Chopper With Supporting Angle 10Mm / 12Mm 24 Dis.Fab. And Erection Of Both Side Plate Of Hood Of Cane Leveller / Cane Chopper With Supporting Angle 10Mm / 12Mm 25 Dis.Fab. And Erection Of Both Side Plate ( Ms / Ss 10Mm / 12Mm ) Of Fibrizer With Supporting Angle 26 Dis.Fab. And Erection Of Front Side Plate ( Ms / Ss 10Mm / 12Mm ) Of Fibrizer With Supporting Angle 27 Dis. Fab. And Erection Of Roundtrough Of Secondary Cane Carrier / Irc / Bgasse Elevator / Mbc / Rbc 8Mm / 10Mm / 12Mm Plate 28 Dis. Fab. And Erection Of Base Plate ( Ms / Ss-- 8Mm / 10Mm / 12Mm ) Of Secondary Cane Carrier / Irc / Bagasse Elevator / Mbc / Rbc 29 Fabrication Of Rakesof Secondary Cane Carrier / Irc With Attachmentfrom Ms Pipe Size-- 4 And 1 30 Fabrication Of Rakes Of Bagasse Elevator / Mbcwith Attachmentfrom Ms Pipe Size-- 3 And 1 31 Dismentalling Of Ms / Ss Round / Square Tankfabrication Of Ms / Ss Round / Square Tankerectionof Ms / Ss Round / Square Tank 32 Dismentalling Bagacilo Screen Framefabrication Bagacilo Screen Frameerectiontion Bagacilo Screen Frame 33 Dismentallingbagacilo Railing Framefabricationbagacilo Railing Frame Erectiontionbagacilo Railing Frame 34 Dismentalling Of Ci / Gm Sluice / Angle / Butterfly Valve Size Upto---16Erection Of Ci / Gm Sluice / Angle / Butterfly Valve Size Upto---16 35 Dismentalling Of Pan Discharge Butterfly Valveerection Of Pan Discharge Butterfly Valve 36 Dismentalling Of Ss / Brass Tube Of Evaporators ( S.K, V.C, Quads ) Fitting Of Ss / Brass Tube Of Evaporators ( S.K, V.C, Quads ) 37 Dismentalling Of Ss / Brass Tube Of Pansfitting Of Ss / Brass Tube Of Pans 38 Dismentalling Of Ss / Brass Tube Of Juice Heatersfitting Of Ss / Brass Tube Of Juice Heaters 39 Ms Straight / Right Angle Valve Size-300Mm, 350Mm, 400Mm, 450Mm, 600Mm, 700Mm, 900Mm And 1000Mmdis.Erection 40 Hydaulic Testing Of Evaporators ( S.K, V.C, Quads ) Hydaulic Testing Of Panshydaulic Testing Of Juice Heaters 41 Ms Blindsize----1 To 50Dis.Fab.Erection 42 Dismentalling Of Gi / Colored Coated Sheetfitting Of Gi / Colored Coated Sheet 43 Dismentalling Of Acc Sheetfitting Of Acc Sheet 44 Dismentalling Of Ms / Ss Reducer Size--Upto 100Fabrication Of Ms / Ss Reducer Size--Upto 100 Erection Of Ms / Ss Reducer Size--Upto 100 45 Dismentalling Of Staircasingfabrication Of Staircasingerection Of Staircasing 46 Dismentalling Of Monkey Ladderfabrication Of Monkey Laddererection Ofmonkey Ladder 47 Dismentalling Of Fabricated Frame Of Pump & Motorfabrication Of Frame Of Pump & Motorerection Of Frame Of Pump & Motor 48 Dismentalling Of Juice / Water / Syrup / Molasses Pumperection Of Juice / Water / Syrup / Molasses Pump 49 Dismentalling Of Injection / Spray / Massicuite / Magma Pumperection Of Injection / Spray / Massicuite / Magma Pump 50 Dismentalling Of Motor Upto 50Hperectionof Motor Up To 50Hp 51 Dismentalling Of Motor 55 Hp To 250 Hperectionof Motor 55 Hp To 250 Hp 52 Dismentalling Of Bewelgeared Discharge Valve And Fitting Of Butterfly Valve With Modification Of Nipple & Flange 53 Strengthening Of Building Structure Column Binder 54 Replacement Of Vljhdismantling & Erection Of Vapour Line Juice Heater.All Dismantled Connectionsto Be Connected. Levelling &Alignment To Be Made. 55 Replacement Of Shell Of Pan 60 Tondismantling Fabrication& Erection Of Pan Shell.All Dismantled Connections To Be Connected. 56 Replacement Of Save All Of Pandismantling & Erection Of Save All Of Pan . All Dismantled Connections To Be Connected. 57 Replacement Of Stirrer Shaft Of Air Cooled Crystalizer--A, B & C Dismantling & Erection Of Stirrer Shaft Of Air Cooled Crystalizer--A, B & C . All Dismantled Connections To Be Connected. Dismantling & Fitting Of Drive Gear Arrangement. 58 Replacement Of Top Cone Of Pandismantling & Erection Of Top Coneof Pan . All Dismantled Connections To Be Connected. 59 Replacement Of Bottom Cone Of Pandismantling & Erection Of Bottom Coneof Pan . All Dismantled Connections To Be Connected. 60 Replacement Of Cooling Coils Of Vertical Crystallizer As Per Drg. Dismantling & Erection Of Cooling Coils Of Vertical Crystallizer . All Dismantled Connections To Be Connected. 61 Shifting Of 50 Tons Capacity Panfrom Old Mill To New Milldismantling & Erection Of 50 Tons Capacity Pan . All Dismantled Connections To Be Connected 62 Shifting Of Vacuum Crystallizer-A In Place Of Vaccum Crystallizer-C At The Same Floor Dismantling & Erection Of Vacuum Crystallizer-A In Place Of Vaccum Crystallizer-C . All Dismantled Connections To Be Connected. 63 Shifting Of 50 Ton Air Cooled Crystallizer From Old Plant To New Plantdismantling & Erection Of 50 Ton Air Cooled Crystallizer . All Dismantled Connections To Be Connected And Drive Arrangement 64 Replacement Of Center Shaft Of Juice Clarifierdismantling , Erection And Alignment Of Center Shaft Of Juice Clarifier . All Dismantled Connections To Be Connected. 65 Replacement Of Mud Bootdismantling, Fabrication & Erection Of Mud Boot. All Dismantled Connections To Be Connected. 66 Replacement Of Compartment Bottom Plate Of Juice Clarifier Dismantling Fabrication & Erection Of Compartment Plate 67 Dismantlingofmassecuitegutter Fabricationofmassecuitegutter Erectionofmassecuitegutter 68 Dismantling , Fabrication & Erection Of Dorr Compartment Shell With Ms Plate Channel Angles.The Erection Work For This Will Also Include All Connections Which Are Dismantled During Dismantling. 69 Dismantling , Fabrication & Erection Of Dorr Compartment / Chamber Roof With Ms Plate Channel Angles Supports.The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling. 70 Dismantlingof Top / Bottom Cover Of Juice Heater Erection Of Top & Bottom Cover 71 Dismantling & Erection Ofsquare Channel For Rubber Strip Fitting Ofjuice Heaters 72 Dismantling , Fabrication And Erection Of Compartment Box Of Juice Heater 73 Dismantling Of Horizontal Sugar Melter And To Be Shifted As Per The Directions Of Ce / Cc 74 Shifting& Erection Of Verticalsugar Melter For Reprocessing Of Moist Sugar Dismantling & Erection Of Old Vertical Sugar Melter For Reprocessing Of Moist Sugar. All Dismantled Connections To Be Connected With Drive Arrangement 75 Cantilever Provided At The Top Of O.C.Filter To Lift The Drum At The Height Appx 10.0 Meter From Ground Floor. 76 Dismantling Of Old Mud Mixer Scroll Fabrication And Erection Of Newmud Mixerscroll 77 Modification Of Mud Mixer Trough To Increase The Length Of Mud Mixer Trough By Approx. 1 Mtr. 78 Replacement Ofbagacilo Line Dismantling, Fabrication And Erection Of Bagacilo Line 79 Dismantling, Fabrication And Erection Of Bagacilo Cyclone 80 Ms New Sulphur Furnace ( Complete ) Fabrication & Erection Of Sulphur Furnace As Per Drg. / As Per Instructions Of Ce / Cc 81 Fabrication & Erection Of Ms Shoot For Dsm Screen 82 Fabrication , Erection Of Corrugated 6. / 8 Inch Wide Plate For Equal Water Distributing At Etp 83 Dismantle, Fabrication And Erection Of Sperger M.S. Pipe Having Length 500Mm App, Dia 14.0 Inch Dia 84 Dismantling, Fabrication And Erection Of Worn Out Stirrer Arm Of Vertical Crystallizers Drive. 85 Replacement Of Distance Piece Of Vapour Pipe Upto 1.5 Mtr 86 Sulphur Furnace ( Extra Work ) Scope Of Worka. Topbaffle Plate To Be Dismantle And Erected 250 Mm Away From Existing Site.B. Dismantling Of Existing Worn Outbaffle Plate , Fabricate And Erect At Existing Site 87 Gate Frame Of Magma Mixturescope Of Worka. Fabricationof Frame Along With Ms Channel.B. Drill To Be Made In Both Ms Channel.C. Erection Of Frame At Site 88 Fabrication And Erection Of Sulphur Furnace Heating Element Coil Of Sulphur Furnace Melter.A- Fabrication Of Nipples And Erection At Sulphur Melter Systemsb- Fabrication Of Nipples And Erection Of Sulphur Melter Receiver 89 Shifting Of Sugar Hopper Fromold Plant To New Plantdismantling & Erection Of Sugar Hopper. 90 Erection & Commissioning Of Hopper Tray With Decking Plate, Connection Arrangementof Connecting Rod And Angle Klits For Wooden Strips Fitting Approx. Length 10 Mtr. 91 Dismantling, Shifting And Erection Of Sugar Elevator From Old Plant To New Plant Complete With Structure 92 Dismantling, Shifting And Erection Of Sugar Graderfrom Old Plant To New Plant Complete With Structure 93 Planetary Gear Boxerection & Commissioningof Planetary Gear Box At Vertical Crystallizerany Additional Job To Complete Theerection Work Of Planetary Gear Boxto Be Carried Out By The Contractor 94 Fabrication & Erection Of Pneumatic Shoot Of Grader 95 Erection Of Pneumatic Clamps Of Grader 96 Repair Of Stirrer Shaft Of Vacuum Crystallizer Dismantling & Erection Of Stirrer Shaft Of Vacuum Crystallizer After Repair 97 Strengtheningof Stirrer Shaft Of Air Cooled Crystallizer• Dismantling & Erection Of Stirrer Shaft Of Air Cooled Crystallizer After Repair. 98 Dismantling Of Platform -Fabrication Of Platform-Erection Of Platform 99 Fabrication And Erection Of Cane Unloader Bridge Platform 100 Dis, Feb, & Errection Of Umbrella Of Pan Along With Its Supports. 101 Dismantling Of J-Pipe Of Pans-Fabrication Of J-Pipe Of Pans-Erection Of J-Pipe Of Pans 102 Dismantling Of Vapour / Exhaust Pipe Size-700Mm / 900Mm / 1000Mm / 1100Mm-Fabrication Of Vapour / Exhaust Pipefrom 8Mm / 10Mm Thick Plate -Erection Of Vapour / Exhaust Pipe 103 Dismantling Of Structure As Per The Instruction Of Ce-Fabricationof Structure-Erection Ofstructure 104 Patch Work Of Different Equipments 105 To Straight The Old Damaged Vapour Pipe And Round Tank For Platform. 106 Dismantling Of Steam Coil Of Molasses Storage Tank At Pan Station Size 1” To 2”.-Fabricationof Steam Coil Of Molasses Storage Tank At Pan Station Size 1” To 2”.-Erection Of Steam Coil Of Molasses Storage Tank At Pan Station Size 1” To 2”. 107 Dis, Fab, & Errection Of Juice Coil Of Juice Clarifier Size 4”, 5” & 6” Alongwith Its Nipple 108 Dis. Fab & Erection Of Wt. Juice Pump Strainer 109 Dismantling, Fabrication And Erection Of Pan Save-All Top Plate 110 Planetary Gear Boxerection Of Planetary Gear Box Ofhorizontalcrystallizer 111 Replacement Of Old Gate Valve With New Gate Valve Of Crystallizers 112 Dismantling Of Double Beat Valve And Erection Of Same Of Juice Heater At Existing Site. 113 Dismantling Of Old Transient Heater And Erection Of New Transient Heater Along With All Connections And Valve. 114 Fabrication & Erection Of Factory Structure Complete Window ( Frame & Grills ) 115 Modification, & Erection Of Mill House Rotary Screen Inlet Juice Tank &Platform 116 Fabrication And Erection Of Excess Bagasse Carrier To Rbc As Per The Dirction Of Ce Scope Of Work ( A ) Fabrication And Erection Of Column And Structure For Belt Conveyor , Along With Drive System And Discharge Chute To Rbc Column And Steel Structure 117 Fabrication And Erection Of Cooling Tower Structure And Shed 118 Strengthening Of Pans / Vacuum Crystallizershell With Angle And Channels In Round Shape With Ms Angle 75Mmx75mm And Dia 4Mtr ( Two Rounds ) 119 Strengthening Of Evaporator Shell With Angle And Channels In Round Shape With Ms Angle 75Mmx75mm And Dia 2.80Mtr ( Two Rounds ) 120 Dismantling , Fabrication & Erection Of Juice Feed Boxes Of Juice Heater Double Beat Valve.The Erection Work For This Job Will Also Include All Connections Which Are Dismantled During Dismantling. 121 Dismantling , Fabrication & Erection Of Melter Of Sulphur Furnace As Per Existing Design. This Work Include Dismantling And Erection Of All Connections, Man Hole, Flanges Etc. 122 Dismantling , Fabrication & Erection Of Scrubber Of Sulphur Furnace As Per Existing Design. This Work Include Dismantling And Erection Of All Connections, Man Hole, Flanges Etc. 123 Replacement Of Sealing Ring Of Dorr Mud Boot 124 Dismantling , Fabrication & Erection Of Worn Out Heavy / Light Vacuum Tank Of Rvf Including All Connections. 125 Dismantling , Fabrication & Erection Of Ms Barometric Condenser Of Rvf. This Job Will Include All Connections Which Are Dismantled During Dismantling. 126 Dismantling , Fabrication & Erection Of Bottom Trough Of Rvf 127 Dismantling , Fabrication & Erection Of Down Take Of Pan From 10 / 12 Plate 128 Dismantling , Fabrication & Erection Distributor Of Pans 129 Replacement Of Feed Box Of Pans Including All Connections 130 Fitting Of Pad, Ribbes On Shaft Of Air Cooled Crystlizer / Vaccum Crystlizer And Fitting Of Angle And Ribben

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 08-Jun-2023 Date corrigendum Date 15-06-2023

Key Value

Document Fees
Refer document
EMD
INR 100000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: FABRICATION AND ERECTION
Sl. No. Item Description
1FABRICATION AND ERECTION
2Dismantling of MS/GI/SS pipe line size--1/2" to 12" Erection of MS/GI/SS pipe line size--1/2" to 12"
3Dismantling ofMS/SS pipe line size--14" to 50" Fabrication ofMS/SS pipe line size ---14" to 50" 3mm/6mm/8mm/10mm/12mm Erection of faricated MS/SS pipe line size--14" to 50"
4Dismantling of C I pipe line upto 12" Erection of C I pipe line upto 12"
5Dismentalling of MS/SS Nipple upto 12"dia and upto 1 meter long Fabrication of MS/SS Nipple upto 12"dia and upto 1 meter long Erection of MS/SS Nipple Nipple upto 12"dia and upto 1 meter long
6Dismentalling of faricated MS/GI/SS Nipple size--14"to 50"and upto 1 meter long Fabrication ofMS/GI/SS Nipple size ---14" to 50" and upto 1 meter long Erection of faricated MS/GI/SS Nipple size--14" to 50" and upto 1 meter long
7Dismentalling of MS/SS Bend upto 12"dia Fabrication of MS/S Bend upto 12"dia Erection of MS/SS Bend upto 12"dia
8Dismentalling of MS/GI/SS Bend size--14"to 50" Fabrication ofMS/GI/SS Bend size ---14" to 50" Erection of faricated MS/GI/SS Bend size--14" to 50"
9Dismentalling of MS/SS Cone size--upto 100" Fabrication of MS/SS Cone size--upto 100" Erection of MS/SS Cone size--upto 100"
10Dismentalling of C I Bend upto 12" Erection of C I Bend upto 12"
11Dismantling of C I Tee upto 12" Erection ofC I Tee upto 12"
12Dismantling of C I Cross upto 12" Erection ofC I Cross upto 12"
13Dismantling of MS/SS Tee size--upto 100" Fabrication of MS/SS Tee size--upto 100" Erection of MS/SS Tee size--upto 100"
14Dismantling of MS/SS Crosssize--upto 100" Fabrication of MS/SS Cross size--upto 100" Erection of MS/SS Cross size--upto 100"
15Dismantling of railing of pipe. -Fabrication of railing pipe -Erection of railing pipe
16Fixing of G.I wire weaved fencing around cold water reservoir
17Dismantling and washing of old flange
18Fabrication and Drilling of flange from MS plate
19Replacement of Square bar/Rail 40mm/50mm
20Replacement of Runner Flat of Cane Carrier/Secondary cane carrier/IRC/Bagasse Elevator/MBC/RBC 65mm/75mm
21Replacement of Angle of Cane Carrier/Secondary cane carrier/IRC/Bagasse Elevator/MBC/RBC 65mm/75mm/90mm
22Replacement of Side plate of Cane Carrier/Secondary cane carrier/IRC/BagasseElevator / MBC / RBC Chains6mm/8mm
23Dis.Fab. and Erection of hood of Cane Leveller/Cane Chopper with supporting angle 10mm/12mm
24Dis.Fab. and Erection of both side plate of hood of Cane Leveller/Cane Chopper with supporting angle 10mm/12mm
25Dis.Fab. and Erection of both side plate ( MS/SS 10mm/12mm) of Fibrizer with supporting angle
26Dis.Fab. and Erection of front side plate ( MS/SS 10mm/12mm) of Fibrizer with supporting angle
27Dis. Fab. and Erection of roundTrough of Secondary cane Carrier/IRC/Bgasse Elevator/MBC/RBC 8mm/10mm/12mm plate
28Dis. Fab. and Erection of base plate( MS/SS-- 8mm/10mm/12mm) of Secondary cane Carrier/IRC/Bagasse Elevator/MBC/RBC
29Fabrication of Rakesof Secondary cane Carrier / IRC with attachmentfrom MS pipe Size-- 4" and 1"
30Fabrication of Rakes of Bagasse Elevator/MBCwith attachmentfrom MS pipe Size-- 3" and 1"
31Dismentalling of MS/SS Round/Square tank Fabrication of MS/SS Round/Square tank Erectionof MS/SS Round/Square tank
32Dismentalling Bagacilo Screen frame Fabrication Bagacilo Screen frame Erectiontion Bagacilo Screen frame
33DismentallingBagacilo Railing frame FabricationBagacilo Railing frame ErectiontionBagacilo Railing frame
34Dismentalling of CI/GM Sluice/Angle/Butterfly Valve Size upto---16" Erection of CI/GM Sluice/Angle/Butterfly Valve Size upto---16"
35Dismentalling of Pan Discharge Butterfly valve Erection of Pan Discharge Butterfly valve
36Dismentalling of SS/Brass tube of Evaporators (S.K,V.C,Quads) Fitting of SS/Brass tube of Evaporators (S.K,V.C,Quads)
37Dismentalling of SS/Brass tube of Pans Fitting of SS/Brass tube of Pans
38Dismentalling of SS/Brass tube of Juice Heaters Fitting of SS/Brass tube of Juice Heaters
39MS Straight/Right angle valve Size-300mm,350mm,400mm,450mm,600mm,700mm,900mm and 1000mm Dis. Erection
40Hydaulic Testing of Evaporators (S.K,V.C,Quads) Hydaulic Testing of Pans Hydaulic Testing of Juice Heaters
41MS BlindSize----1" to 50" Dis. Fab. Erection
42Dismentalling of GI/Colored coated sheet Fitting of GI/Colored coated sheet
43Dismentalling of ACC sheet Fitting of ACC sheet
44Dismentalling of MS/SS Reducer size--upto 100" Fabrication of MS/SS Reducer size--upto 100" Erection of MS/SS Reducer size--upto 100"
45Dismentalling of staircasing Fabrication of staircasing Erection of Staircasing
46Dismentalling of Monkey Ladder Fabrication of Monkey Ladder Erection ofMonkey Ladder
47Dismentalling of fabricated frame of pump & motor Fabrication of frame of pump & motor Erection of frame of pump & motor
48Dismentalling of juice/water/syrup/molasses pump Erection of juice/water/syrup/molasses pump
49Dismentalling of Injection/Spray/Massicuite/Magma pump Erection of Injection/Spray/Massicuite/Magma pump
50Dismentalling of motor upto 50HP Erectionof motor up to 50HP
51Dismentalling of motor 55 HP to 250 HP Erectionof motor 55 HP to 250 HP
52Dismentalling of bewelgeared discharge valve and fitting of butterfly valve with modification of nipple & flange
53Strengthening of building structure column binder
54Replacement of VLJH Dismantling & erection of vapour line juice heater.All dismantled connectionsTo be connected. Levelling &alignment to be made.
55Replacement of Shell of Pan 60 Ton Dismantling Fabrication& erection of pan shell.All dismantled connections to be connected.
56Replacement of Save All of pan Dismantling & erection of save all of pan . All dismantled connections to be connected.
57Replacement of stirrer shaft of Air Cooled Crystalizer--A, B & C Dismantling & erection of stirrer shaft of Air Cooled Crystalizer--A, B & C . All dismantled connections to be connected. Dismantling & fitting of drive gear arrangement.
58Replacement of Top Cone Of pan Dismantling & erection of top coneof pan . All dismantled connections to be connected.
59Replacement of Bottom Cone Of pan Dismantling & erection of bottom coneof pan . All dismantled connections to be connected.
60Replacement of cooling coils of vertical crystallizer as per drg. Dismantling & erection of cooling coils of vertical crystallizer . All dismantled connections to be connected.
61Shifting of 50 Tons capacity panfrom old mill to new mill Dismantling & erection of 50 Tons capacity pan . All dismantled connections to be connected
62Shifting of vacuum crystallizer-A in place of vaccum crystallizer-C at the same floor Dismantling & erection of vacuum crystallizer-A in place of vaccum crystallizer-C . All dismantled connections to be connected.
63Shifting of 50 ton air cooled crystallizer from old plant to new plant Dismantling & erection of 50 ton air cooled crystallizer . All dismantled connections to be connected and drive arrangement
64Replacement of center shaft of juice clarifier Dismantling , erection and alignment of center shaft of juice clarifier . All dismantled connections to be connected.
65Replacement of mud boot Dismantling,fabrication & erection of mud boot. All dismantled connections to be connected.
66Replacement of compartment bottom plate of Juice clarifier Dismantling fabrication & Erection of compartment plate
67DismantlingofMassecuitegutter FabricationofMassecuitegutter ErectionofMassecuitegutter
68Dismantling , fabrication & erection of dorr compartment shell with MS plate channel angles.The erection work for this will also include all connections which are dismantled during dismantling.
69Dismantling , fabrication & erection of dorr compartment/chamber roof with MS plate channel angles supports.The erection work for this job will also include all connections which are dismantled during dismantling.
70Dismantlingof top/ bottom cover of juice heater Erection of top & bottom cover
71Dismantling & erection ofsquare channel for rubber strip fitting ofjuice heaters
72Dismantling , fabrication and erection of compartment box of juice heater
73Dismantling of Horizontal sugar melter and to be shifted as per the directions of CE/CC
74Shifting& Erection of verticalsugar melter for reprocessing of moist sugar Dismantling & erection of old vertical sugar melter for reprocessing of moist sugar. All dismantled connections to be connected with drive arrangement
75Cantilever provided at the top of O.C.Filter to lift the drum at the height appx 10.0 meter from ground floor.
76Dismantling of old mud mixer scroll Fabrication and Erection of newMud MixerScroll
77Modification of Mud mixer Trough To increase the length of mud mixer trough by approx. 1 mtr.
78Replacement ofBagacilo Line Dismantling, Fabrication and Erection of Bagacilo line
79Dismantling, Fabrication and Erection of Bagacilo Cyclone
80MS New Sulphur Furnace (complete) Fabrication & erection of sulphur furnace as per drg./as per instructions of CE/CC
81Fabrication & erection of MS shoot for DSM screen
82Fabrication , erection of corrugated 6./8 inch wide plate for equal water distributing at ETP
83Dismantle, fabrication and erection of sperger M.S. pipe having length 500mm app, dia 14.0 inch dia
84Dismantling, Fabrication and Erection of worn out stirrer arm of vertical crystallizers drive.
85Replacement of distance piece of vapour pipe upto 1.5 mtr
86Sulphur furnace (Extra work ) Scope of work a. Topbaffle plate to be dismantle and erected 250 mm away from existing site. b. Dismantling of existing worn outbaffle plate , fabricate and erect at existing site
87Gate frame of magma mixture Scope of work a. Fabricationof frame along with MS channel. b. Drill to be made in both MS channel. c. Erection of frame at site
88Fabrication and erection of sulphur furnace heating element coil of sulphur furnace melter. a- Fabrication of nipples and erection at sulphur melter systems b- Fabrication of nipples and erection of sulphur melter receiver
89Shifting of sugar hopper fromold plant to new plant Dismantling & erection of sugar hopper.
90Erection & commissioning of Hopper Tray with decking plate, connection arrangementof connecting rod and angle klits for wooden strips fitting approx. length 10 mtr.
91Dismantling, shifting and erection of sugar elevator from old plant to new plant complete with structure
92Dismantling, shifting and erection of sugar Graderfrom old plant to new plant complete with structure
93Planetary gear box Erection & commissioningof planetary gear box at vertical crystallizer Any additional job to complete theerection work of planetary gear boxto be carried out by the contractor
94Fabrication & erection of pneumatic shoot of Grader
95Erection of pneumatic clamps of Grader
96Repair of stirrer shaft of vacuum crystallizer Dismantling & erection of stirrer shaft of vacuum crystallizer after repair
97Strengtheningof stirrer shaft of air cooled crystallizer • Dismantling & erection of stirrer shaft of air cooled crystallizer after repair.
98Dismantling of platform -Fabrication of platform -Erection of platform
99Fabrication and Erection of cane unloader bridge platform
100Dis,feb,& errection of umbrella of pan along with its supports.
101Dismantling of J-pipe of pans -Fabrication of J-pipe of pans -Erection of J-pipe of pans
102Dismantling of vapour/exhaust pipe size-700mm/900mm/1000mm/1100mm -Fabrication of vapour/exhaust pipefrom 8mm/10mm thick plate -Erection of vapour/exhaust pipe
103Dismantling of structure as per the instruction of CE -Fabricationof structure -Erection ofstructure
104Patch work of different equipments
105To straight the old damaged vapour pipe and round tank for platform.
106Dismantling of Steam coil of molasses storage tank at pan station size 1” to 2”. -Fabricationof Steam coil of molasses storage tank at pan station size 1” to 2”. -Erection of Steam coil of molasses storage tank at pan station size 1” to 2”.
107Dis, fab, & errection of juice coil of juice clarifier size 4”,5” & 6” alongwith its nipple
108Dis. Fab & Erection of Wt. Juice pump strainer
109Dismantling, Fabrication and Erection of pan SAVE-ALL top plate
110Planetary gear box Erection of planetary gear box ofhorizontalcrystallizer
111Replacement of old gate valve with new gate valve of crystallizers
112Dismantling of double beat valve and erection of same of juice heater at existing site.
113Dismantling of old Transient heater and Erection of new Transient heater along with all connections and valve.
114Fabrication & Erection of Factory structure Complete window (frame & grills)
115Modification, & Erection of mill house Rotary screen inlet juice Tank &platform
116Fabrication and erection of excess bagasse carrier to RBC as per the dirction of CE scope of work (A) Fabrication and erection of column and structure for Belt conveyor , Along with drive system and discharge chute to RBC Column and steel structure
117Fabrication and erection of cooling tower structure and shed
118Strengthening of pans/vacuum crystallizershell with angle and channels in round shape with MS angle 75mmx75mm and dia 4mtr ( Two rounds )
119Strengthening of evaporator shell with angle and channels in round shape with MS angle 75mmx75mm and dia 2.80mtr ( Two rounds )
120Dismantling , fabrication & erection of juice feed boxes of juice heater double beat valve.The erection work for this job will also include all connections which are dismantled during dismantling.
121Dismantling , fabrication & erection of melter of sulphur furnace as per existing design. This work include dismantling and erection of all connections, man hole, flanges etc.
122Dismantling , fabrication & erection of scrubber of sulphur furnace as per existing design. This work include dismantling and erection of all connections, man hole, flanges etc.
123Replacement of sealing ring of dorr mud boot
124Dismantling , fabrication & erection of worn out heavy / light vacuum tank of RVF including all connections.
125Dismantling , fabrication & erection of MS barometric condenser of RVF. This job will include all connections which are dismantled during dismantling.
126Dismantling , fabrication & erection of bottom trough of RVF
127Dismantling , fabrication & erection of down take of pan from 10/12 plate
128Dismantling , fabrication & erection distributor of pans
129Replacement of feed box of pans including all connections
130Fitting of pad, ribbes on shaft of air cooled crystlizer / vaccum crystlizer and fitting of angle and ribben
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail