}

Tender For Supply Of Uninterruptible Power Supply System For Pp And Cdw Unit, panipat-Haryana

Indian Oil Corporation Limited-IOCL has published Tender For Supply Of Uninterruptible Power Supply System For Pp And Cdw Unit. Submission Date for this Tender is 22-08-2023. UPS Tenders in panipat Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

37793162
Corrigendum : Tender For Supply Of Uninterruptible Power Supply System For Pp And Cdw Unit
Limitted
Indian
Haryana
panipat
22-08-2023

Tender Details

Supply Of Uninterruptible Power Supply System For Pp And Cdw Unit , Supply Of Uninterruptible Power Supply For Pp & Cdw Unit Design, Engineering, Procurement, Manufacturing, Construction, Fabrication, Assembly, Inspection, Testing ( At Vendor’S Works, Along With Components Installed And Fully Integrated Testing ) , Painting, Tagging, Documentation, Preparation For Shipment, Supply, Supervision Of Installation, Testing And Commissioning Of The Uninterruptible Power Supplyalong With All Accessories Such As On Line Battery Monitoring, Load Bank For Testing, Cell Booster, Commissioning Spares, Special Tools & Tackles, Third Party Inspection, Etc. As Specified In Technical Documention ( Document Id : 6746-Elt-000-Ec-0024 ) For Epcm 3 ( P-25 ) Projectfor Iocl, Pncp ( Panipat Naphta Cracker Plant ) / Iocl Pr ( Panipat Refinery ) . , A ) Us-Sr-3171 ( Loc: Ppu Srr ) : 1-Phase, 110V, 50Hz Ups B ) Us-3171 ( Loc: Ppu Ss-31 ) : 1-Phase, 230V, 50Hz Ups C ) Us-Sr-3172 ( Loc: Ppu Srr ) : 1-Phase, 110V, 50Hz Ups D ) Us-120701 ( Loc: Cdw Ss-120 ) : 1-Phase, 230V, 50Hz Ups E ) Us-120702 ( Loc: Cdw Srr ) : 1-Phase, 110V, 50Hz Ups => Limited

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 02-Jun-2023 Corrigendum1_Date1 Date 26-06-2023
2 16-Jun-2023 Corrigendum2_Date2 Date 10-07-2023
3 11-Jul-2023 Corrigendum3_Date3 Date 27-07-2023
4 17-Jul-2023 CommercialCorrigendum4_UPS Other 27-07-2023
5 18-Jul-2023 Corrigendum5_Technical_UPS Technical Bid 27-07-2023
6 26-Jul-2023 Corr6_Comm_UPS Other 27-07-2023
7 28-Jul-2023 Corrigendum7_Date4 Date 10-08-2023
8 07-Aug-2023 Corrigendum8_Technical_UPS Technical Bid 10-08-2023
9 11-Aug-2023 Corrigendum9_Date5 Date 22-08-2023

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: Supply of UNINTERRUPTIBLE POWER SUPPLY for PP & CDW Units for EPCM 3 (P-25) PROJECT, IOCL PANIPAT REFINERY
Sl. No. Item Description
1Supply of UNINTERRUPTIBLE POWER SUPPLY for PP & CDW Unit Design, Engineering, Procurement, Manufacturing, Construction, Fabrication, Assembly, Inspection, Testing (at vendor’s works, along with components installed and fully integrated testing), Painting, Tagging, Documentation, Preparation for Shipment, Supply, Supervision of installation,testing and commissioning of the UNINTERRUPTIBLE POWER SUPPLYalong with all accessories such as on line battery monitoring, load bank for testing,cell booster, commissioning spares, special tools & tackles, third party Inspection, etc. as specified in Technical Documention (Document ID : 6746-ELT-000-EC-0024)for EPCM 3 (P-25) PROJECTfor IOCL, PNCP (PANIPAT NAPHTA CRACKER PLANT) / IOCL PR (PANIPAT REFINERY).
2a) US-SR-3171 (Loc: PPU SRR): 1-phase, 110V, 50Hz UPS b) US-3171 (Loc: PPU SS-31): 1-phase, 230V, 50Hz UPS c) US-SR-3172 (Loc: PPU SRR): 1-phase, 110V, 50Hz UPS d) US-120701 (Loc: CDW SS-120): 1-phase, 230V, 50Hz UPS e) US-120702 (Loc: CDW SRR): 1-phase, 110V, 50Hz UPS
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail