|
| 1 | \"Specifications / Conditions for Hut type shelter sheds\" |
| 2 | Providing / fixing and Erection in position of Hut type shelter shedsof size 20\"x40\" by way offollowing specifications / components, including all necessary consumableat sites as per below:- |
| 3 | a)Leveling of ground including removal of slash / slides / snow etc. and making ground even for erection at each site and making of pits for erection of size 2\"x2\"x2\" with laying of cement concrete in 1:2:4 mix. |
| 4 | b)Providing / fixing and Erection of Hut type frame structure of M.S. Pipes / hollow tubes including providing and fixing of nuts / bolts and fixing of angle iron frames as required (including requisite priming / painting coats to all steel section and allied material required) |
| 5 | c)Providing / fixing 6mm thick of polycarbonate sheets for top and sides with hooks as per directions of Engineer-in-charge complete at each siteincluding cost of hooks. |
| 6 | d)Suppl and Placing of 12 mm thick red film face water resistant ply board sheets on Hallow section frames at required height from ground level, including placement of thermocoal and turpal and making floors evenand smooth at each site. |
| 7 | e)Engagement of ( 3 ) No skilled labours with uniform for watch and ward/ cleaning of sheds / surroundings round the clock till complection of yatra period at each site. |
| 8 | f)Dismembering of Hut type shelter sheds after completion of Yatra period and stacking of all material ateach site of work complete. |
| 9 | g) P/F of J or L hooks for sides and anchoring including all carriages / head load upto site of work complete.4\" long (48 no\"s each sheet) including cost engagment of skilled blacksmith along with welding machine, Genset and other allied equipments required for the welding purpose all complete job. |
| 10 | h)Carriage of all store material involved above from store to site of work and its return carriage from site to store including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 11 | i) Supply /fixing & placing in position of(i.e. Tarpal, Thermocol, etc.) |
| 12 | Material required (Minimum fresh material required) |
| 13 | Structural steel Hallowsection work welded in built up sections, trusses, purlins, rafters and other framed work, includingcutting, hoisting, fixing in position and applying a priming coat of approved steel primer (two or more coats) includingall carriages / head load upto site of work complete. |
| 14 | Providing / fixing of 6mm thick polycarbonate sheets for top/ roof and sides with revitt screws as per directions of Engineer-in-charge complete at each site including cost of screws, revitts ensuring proper overlap to make it leak proof. |
| 15 | Supply and installation Red Film 12mmply wood water proof including all material complete job. |
| 16 | Supply and installation of Thermocol 10mm thick of standard quality.(Fresh) |
| 17 | Supply and installation PVC Tarpal of approved quality.(Fresh) |
| 18 | P/F of 25mm dia Flexible pipe (100 feet roll) |
| 19 | Supply of green shade agro net (5-feet) wide including all carriages complete. |
| 20 | P/F of MS nutss / boltasorted including all carriages / head load upto site of work complete. |
| 21 | P/F of dust bins of capacity 50 litre of approved quality complete. |
| 22 | Carriage of above allmaterialat below mentioned sites including cost of dismemberingand its return carriage from site to store yanner including all leads, lifts and head load by mech / mannual and ponies etc. at each site of work complete in all respects. |
| 23 | Extra sheds from Main Chandanwari to Nagakoti |
| 24 | Extra sheds from Kailnard to Holy Cave. |
| 25 | \"Specifications / Conditions for 4 No. of 3-units Public Convenience\" |
| 26 | Construction and fabrication / Erection in position of 5 No. of3-units Public Convenienceof size 15\".0\"x3\".0\" by way of following specifications / components at sites as shown below:- |
| 27 | a. Supply / Installation / fixing with Hallow section frame (15\".0\"x3\".0\") size of 3-units front side height 7\".0\" and 6\".0\" on back side for prefabricated toilet block made of 0.50 mm Hi-Rib sheets all along including roofing and door shutter with angle iron frame using nuts / bolts and leveling of ground complete(All necessary MS angle required to construct the PC block is to be installed at site) including cost of applying of requisite priming / painting coats to all steel and allied materials required. |
| 28 | b. Trench excavation of pit of size 4\".0\"x4\".0\"x3\".6\" for disposal system including supplying of required CGI sheets 0.50mmcovering above the pit with steel frame complete. |
| 29 | c. Supply / Installation of water storage tank 200 liters capacity and supplyingof plastic buckets, PVC pipe 100mm dia of required length and fittings complete, mugs for each toilet block. |
| 30 | d. Engagement of 03 No. skilled labourers with uniform for watch and ward and including supply/ spraying of Phenyl & Cleaning of toilets etc. round the clock till completion of Yatra period at each site. |
| 31 | e. Dismembering/Disassembling 4 No. of 3-units Public Convenience after completion of Yatra period and stacking of all material at each site of work with out any damage. |
| 32 | h) P/F of J or L hooks for sides and anchoring including all carriages / head load upto site of work complete.4\" long (48 no\"s each sheet) including cost engagment of skilled blacksmith along with welding machine, Genset and other allied equipments required for the welding purpose all complete job. |
| 33 | Structural steel Hallowsection work welded in built up sections, trusses, purlins, rafters and other framed work, includingcutting, hoisting, fixing in position and applying a priming coat of approved steel primer (two or more coats) includingall carriages / head load upto site of work complete. |
| 34 | P/F track deck crill make or equivalent H.I rib profiled sheets 1000 to 1020mm cover width 28-35mm high crests at 250 to 255mm TCT (total coated thickness) high tensile SMP Galvalume steel. The sheets shall have wide panes with 3 No. stiffing ribs, effective water shedding and special male/female ends with fuil return legs on side lapps for purlins support and anti capillary flute inside lapp. The sheets shall have a hot dip metallic coated of zinc and aluminum (150 gms/sm) zinc/aluminum coating mass total on both side AZ-150 as IS-1397,550 PMA, yeild stress. Providing silicon modified polyester coating of approved colour of total thickness of 35 micron comprising 20 micron exterior coat of SMP over 5 micron polyester back coat over 5 micron primer coats on both surfaces incld. side and end lap and using 8mm galvalume hex self drilling fastener on each crest of sheet for connection with purlins and seam bolts at 300mm centers on all side and end lapps etc. (measured for unit of laid area) including the cost of insulation styrofoam 50mm (Including cost of ridges / valleys of plain colour coated sheets complete) |
| 35 | Supply/fixing of chequrred plate including cost of base sheets and nuts / bolts at each site complete job. |
| 36 | Supply / fixing of of Indian stainless steel WC (Railway type) with required nuts/ bolts complete job. |
| 37 | P/F of following PVC pipes (Prince/Supreme make)having pressure 4 kg N/cm incld. cutting and making good the walls where ever necessary required all complete. (100 mm dia.) |
| 38 | P/F of PVC water storage tanks 200 litre capacity. |
| 39 | Plastic Buckets 20 litre capacity. |
| 40 | Plastic Mugs 1 litre capacity. |
| 41 | Brushes(WC brushes,PVC). |
| 42 | Phenyle / Acid. |
| 43 | Carriage of all above materil including costhead load, loading / unloading etc. of following materials at below mentioned sites including its returen to store yanner and carriage and head load, loading and unloading etc. upto store of work complete. |
| 44 | Extra sheds from Main Chandanwari to Nagakoti |
| 45 | Extra sheds from Kailnard to Holy Cave. |