Dismantling Of Existing Mulsifyre & Hydrant System & Re-Installation Of Mulsifyre & Hydrant System Alongwith Installation Of Mulsifyre System Of New 160 Mva Transformer At 220 Kv S/S Sirathu Kaushmabi, Under Electy. Trans. Division-Iv, Prayagraj.
Tender Overview
Project Description
Dismantling of existing mulsifyre & Hydrant system & Re-installation of Mulsifyre & Hydrant system alongwith Installation of Mulsifyre system of new 160 MVA Transformer at 220 KV S/S Sirathu Kaushmabi, under Electy. Trans. Division-IV, Prayagraj.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 25-May-2023 | Financial Experience06 | Date | 08-Jun-2023 |
| 2 | 25-May-2023 | Financial Experience | Technical Bid | 08-Jun-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of old Mulsifyre Pump House |
| 2 | Dismantling of 210 M3/hr, 70M head, Automatic Electric Motor fire water pump of capacity 75 KWH/ 100 HP,415 Volts, 1450 RPM, 3 Phase alongwith all required accessories, as per specification enclosed. Kirloskar make |
| 3 | Dismantling of 210 M3/hr, 70 M head, Automatic Diesel Engine driven fire water pump of capacity 105 BHP, 1500 RPM, alongwith all required accessories, as perspecification enclosed.Kirloskar make |
| 4 | Dismantling of Jockey Pump, 70 meters head Automatic Electric Motor driven of capacity 11 KWH, 15 HP, 415 Volts, 2900 RPM, 3 Phase alongwith all required accessories, as per specification enclosed. Kirloskar make |
| 5 | Dismantling of / Ingersoll Rand make Air Compressor with single Stage delivery pressure 10 Kgs/, Automatic Electric Motor driven of capacity 415 Volts, 3 Phase alongwith air receiver and all required accessories, as per specification enclosed. ELGI make |
| 6 | Dismantling of Auto Power Supply Control Panel in pump house of capacity 315 Amp, 440 Volts AC, suitable for starting/ controlling all equipments provided for mulsifyre system with proper cable termination etc. alongwith all required accessories, as per specification enclosed. Purchaser Scope Make-Risha control |
| 7 | Dismantling of old Fire Hydrant Pump |
| 8 | Dismantling of Automatic Electric Motor fire water pump of capacity 37 KWH/ 50 HP, 415 Volts, 2950RPM,3 Phase alongwith all required accessories, as per specification enclosed. Kirloskar make |
| 9 | Dismantling of Jockey Pump, Automatic Electric Motor driven of capacity 7.5 KWH, 10 HP, 415 Volts, 2900 RPM, 3 Phase alongwith all required accessories, as per specification enclosed. Kirloskar make |
| 10 | Dismantling of Auto Power Supply Control Panel in pump house of capacity 315 Amp, 440 Volts AC, suitable for starting/ controlling all equipments provided for mulsifyre system with proper cable termination etc. alongwith all required accessories, as per specification enclosed. Purchaser Scope |
| 11 | Installation and commissioning of Automatic Electric Motor fire water pump of capacity 37 KWH/ 50 HP, 415 Volts, 2950RPM, 3 Phase alongwith all required accessories, as per specification enclosed. Kirloskar make |
| 12 | Installation and commisioning of Jockey Pump, Automatic Electric Motor driven of capacity 7.5 KWH, 10 HP, 415 Volts, 2900 RPM, 3 Phase alongwith all required accessories, as per specification enclosed. Kirloskar make |
| 13 | Installation and commissioning of Auto Power Supply Control Panel in pump house of capacity 315 Amp, 440 Volts AC, suitable for starting/ controlling all equipments provided for mulsifyre system with proper cable termination etc. alongwith all required accessories, as per specification enclosed. |
| 14 | Installation and commissioning of 210 M3/hr, 70 M head,Automatic Electric Motor fire water pump of capacity 75KWH/ 100 HP,415 Volts, 1450 RPM, 3 Phase alongwith all required accessories, as per specification enclosed.Kirloskar make |
| 15 | Installation and commissioning of 210 M3/hr, 70 M head, Automatic Diesel Engine driven fire water pump of capacity 105 BHP, 1500 RPM, alongwith all required accessories, as per specification enclosed. |
| 16 | Installation and commissioning of Jockey Pump, 70 meters head Automatic Electric Motor driven of capacity 11 KWH, 15 HP, 415 Volts, 2900 RPM, 3 Phase alongwith all required accessories, as per specification enclosed.Kirloskar make |
| 17 | Installation and commissioning of / Ingersoll Rand make Air Compressor with single Stage delivery pressure 10 Kgs/, Automatic Electric Motor driven of capacity 415 Volts, 3 Phase alongwith air receiver and all required accessories, as per specification enclosed. ELGI make |
| 18 | Installation and commissioning of Auto Power Supply Control Panel in pump house of capacity 315 Amp, 440 Volts AC, suitable for starting/ controlling all equipments provided for mulsifyre system with proper cable termination etc. alongwith all required accessories, as per specification enclosed. Make-Risha control |
| 19 | Supply, Installation, Testing & Commissioning of MS/GI Pipe \"B\" class with elbow, sockets. flanges etc. Make- Jindal |
| 20 | 250mm dia M.S. Pipe |
| 21 | 200mm dia M.S. Pipe |
| 22 | 150mm dia M.S. Pipe |
| 23 | 100mm dia M.S. Pipe |
| 24 | 80mm dia M.S. Pipe |
| 25 | 25mm dia M.S. Pipe |
| 26 | Supply, installation & commissioning of Sluice Valve (Kartar/Sir make) of working pressure 16 Kg/Cmz |
| 27 | 200mm dia sluice Valve |
| 28 | 150mm dia sluice Valve |
| 29 | 100mm dia sluice Valve |
| 30 | 80mm dia sluice Valve |
| 31 | Supply, installation, testing & commissioning of NRV (Kartar/Sir make) of working pressure 16 Kg/cm2 |
| 32 | 200mm dia NRV |
| 33 | 80mm dia NRV |
| 34 | Supply & installation of foot valve assembly (Kalpana/Kartar make) as per standard IS:4038 alongwith strainer |
| 35 | 200mm dia foot valve |
| 36 | 100mm dia foot valve |
| 37 | 150mm dia \"Y\" Type strainer |
| 38 | Supply, installation, testing & commissioning of fixed differential switch (Danfoss/Indfoss make) 0-7 kg/cm2 |
| 39 | Pressure gauge as per IS specification IS Code 3624 pressure 0-20 kg/cm2 |
| 40 | Supply, of Alarm Valve of 150 NB, with Gongbell to generate mechanical alarm during mulsifyre operation. |
| 41 | Installation and commissioning of alarm valve of 150 NB, with Gongbell to generate mechanical alarm during mulsifyre operation. |
| 42 | SITC of priming arrangement for the pumps |
| 43 | Supply of 200mm dia x1200mm height air vessel tank for both main pumps in the pump house |
| 44 | Supply & Installation of Mulsifyre System at 160 MVA transformer |
| 45 | Supply & Installation of G.I. Pipe following sizes complete with elbow tee sockets flanges and bends. |
| 46 | 25 mm dia |
| 47 | 50 mm dia |
| 48 | 65 mm dia |
| 49 | 80 mm dia |
| 50 | 100 mm dia |
| 51 | Supply & Installation of 80 mm dia G.I pipe for support with round clamp at top and flange at bottom as per specification |
| 52 | Supply & Installation of underground M.S pipe line above ground as per specification complete with elbow tee sockets, flanges etc with all material complete. |
| 53 | 150 mm dia |
| 54 | Supply & Installation of deluge valve with all accessories of 150 mm dia. |
| 55 | Supply & Installation of Y-strainer 150 mm dia |
| 56 | Supply & Installation of 150 mm dia Sluice valve |
| 57 | Supply & Installation of globe valve 25 mm dia. |
| 58 | Supply & Installation of pressure switch |
| 59 | Supply & Installation of pressure gauge |
| 60 | Supply & Installation of HV Nozzle project HD make |
| 61 | Supply & Installation of QB detector |
| 62 | Excavation and wrapping coating for underground pipe (Road crossing) |
| 63 | Construction of DV shed AC Sheet by means of suitable size angle iron support and complete with all respect. |
| 64 | Casting of pylon support foundation in1:2:4 cement concert with 20 mm stone ballast and grouting of foundation bolt for support and plastering etc complete. |
| 65 | Construction of RCC Foundation in the ratio of 1:2:4 of Cement, Sand, Stone Ballast (20 mm) for fixing of interconnecting M.S. Pipe Line with necessary Support Base Plate |
| 66 | Work of painting of mulsifire system installed on transformer,pipe lines with one coat of Red Oxide primerand two coat of standard make Red synthetic enamel paint after cleaning rust & dust including the cost of man , material and T&P required. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.