| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. All kinds of soil |
| 2 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with local sand, with common burnt clay non modular bricks. |
| 3 | Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading well ramming consoildating and gounting with Jamuna sand including finishing smooth etc. complete as per directed by Engineer-in charge. |
| 4 | Filling available excavated earth (excluding rock) coarse sand & fine sand in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 5 | Supplying and stacking of coarse sand at site as per thedirected by Engineer-in charge. |
| 6 | Supplying and stacking of fine sand at site as per thedirected by Engineer-in charge. |
| 7 | Supply and laying of Black Clay Soil spreading and leveling the same as required by engaging expert/tranned labour (like ground man) in layers not exceeding 1.5 m in depth including braecking the clods, watering and rolling with 1/2 tonne steel roller lead uo to 50 meter and lift up to 1.5 meter all complete as per the direction of Engineer-in-charge. |
| 8 | Supply and laying of Red Clay Soil spreading and leveling the same as required by engaging expert/tranned labour (like ground man) in layers not exceeding 1.5 m in depth including braecking the clods, watering and rolling with 1/2 tonne steel roller lead uo to 50 meter and lift up to 1.5 meter all complete as per the direction of Engineer-in-charge. |
| 9 | Supplying & Stacking of Selection No.1 doob grass turf at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc.and as per direction of officer in charge. |
| 10 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). In rows 5 cm apart in both directions sqm 17.70 |
| 11 | Add increased GST factor 6.33% on DSR 2021 items except item no 7,8,9 & 10 i.e. on Rs. 1,100,862.30 |
| 12 | Add 7% cost index on the amount of DSR items & increased GST except item no 7,8,9 & 10i.e. on Rs. 1,170,546.88 |